Skip to main content

60-mph divided highways in NC

Evidently, NCDOT has quietly decided to start signing certain highways with 60-mph speed limits rather than the typical 55 mph. Problem is, no one seems interested in admitting what highways are now signed with the higher limit.

The roads being considered for the higher limit are restricted-access, which means they don't have driveways coming off the sides but do have surface intersections rather than full interchanges. As of right now, the only roads I know of that are signed with the higher limit are NC 11 between Kinston and Winterville and US 17 from Elizabeth City to the Virginia state line. Beyond those, rumor has it that there are up to ten other highways that are eligible for the higher limits, but I haven't seen what they are or if they are signed with the new limits. One road that could have the higher limit, the NC 24/903 bypass of Kenansville in Duplin County, is still signed at 55 as of this past weekend.

Interestingly, freeway limits aren't being touched, even for 55-mph bypasses like the US 70 New Bern bypass and the US 17/NC 24 Jacksonville bypass -- at least, not yet.

So does anyone else know where the higher limits are either in place or planned to be put in?

Comments

Doug said…
I have seen similar arrangements for a 60 mph speed limit in Virginia, particularly along US 29. Can't speak so much for North Carolina, unless I go through my photos and spot a rogue 60 mph speed limit sign.
Otto Yamamoto said…
WV has had 60MPH expressways since the NMSL repeal.
Anonymous said…
It is now 60 mph on US 17 on the Shallotte bypass .

And 60 mph on US 74 around Laurinburg up to Maxton .

It is about time as much as 90 % of rural NC highways could be safely raised to 65-70 mph without issue . It is just plain stupid to continue to have the 100 % ignored 55 mph unless otherwise posted rule . This outdated law is from the 1940s to be still in effect on NC roads is just silly .

Our roads are safer , our cars are safer it is about time that this is taken into account when setting our posted speed limits across NC .

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…