Skip to main content

Down to Fayetteville to check on NC 162

Brian and I took a nice trip down to Fayetteville with the hope to see the new NC 162. Well more on that later.

Route: I-440, I-40, US 421, NC 82, US 13, I-295, US 401, US 401 Business, NC 87, US 301/Business I-95, Elk Road, NC 162 (for the 1/8th a mile it was open), more Fayetteville surface streets to NC 59, NC 162 to Camden Road then turned around again on NC 162 to Bingham Road, US 401, US 401 Business, Owen Drive, NC 87, I-95, US 301, NC 50, NC 210, I-40, I-440.

Accomplishments: NC 82 clinched and clinched what pretty much is opened of NC 162 along with what will become NC 162.

Notes: Past signage in Erwin lead to speculation whether or not NC 82 ended at NC 217 or was multiplexed with it to NC 217's Northern Terminus at US 421/NC 55. Well NC 82 West does end with NC 217 North at US 421/NC 55. New signs put up since I last went through the area in May 2006 reflect this.


NC 82 actually has a unique alignment. It has a handful of turns onto different roads making the drive not as boring as one would think. NC 82 also travels through the Averasboro Battlefield. The battlefield museum is located right one NC 82. This stretch of NC 82 is part of the NC Scenic Byways and also NC 82 may have the most historical markers per mile of highway for a primary route. The battlefield grounds are small and being the history buff that I am, I plan on doing a Averasboro and Bentonville Battlefield tour sometime in the future.

Near the eastern end of NC 82 there are two NC 82 shields that are recycled shields of another route. On one, the number '2' covers up another designation. And on US 13 South, the '82' completely covers up a different number. Here's a close up of the '82' cover up.

We both noticed something on NC 82 and later on NC 71 that we've never seen before. At intersections with secondary routes, there were actually numbers for the primary route on the small blocks of wood that are frequently found on the back of Stop Signs.

Now for NC 162, NC 162 will not start as I-95 Business/US 301 as previously thought. First, Elk Street which the Hope Mills Bypass ties into runs about 200 feet shy of I-95 Business/US 301 ending at a frontage road. However, there is grading for an eventual tie into Green 95/US 301 at some future date.

As of today, the Hope Mills Bypass is not completely open. At Legion Road and Elk Street, NC 162 begins. But right now it runs about an 1/8th of a mile to a subdivision entrance.

NC 162 begins again at Camden Road. It is fully signed. It is also signed where it crosses NC 59 and beyond that. However, there are no signs beyond Fisher Road where a new four lane bridge is being constructed over Beaver Creek. From then NC 162 will go on what is currently Bingham Drive, which is currently being widened.

About a 1/3 to 1/2 a mile south of US 401, Bingham Drive leaves 'Future' NC 162. NC 162 will end about 1/4 mile west of where Bingham Drive intersects US 401. (It will end opposite of where Bunce Road ends at US 401.) The new alignment end of NC 162 still has a little bit to go as it is not painted and appears one more layer of asphalt is necessary.

Comments

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…