Skip to main content

Hey look it's I-795, and I-74/US 74, and Future I-73/74!

Bob Malme, Dave Filpus and I took a roadtrip checking out the most recent news in Eastern and Central NC Interstates today. In other words, we went to see if I-795 was signed, the recently opened I-74 in Maxton, and some of the construction of the Ellerbe Bypass.

Route: I-540, US 64, NC 39, US 264, I-795, US 117, US 13, I-95, NC 711, I-74/US 74, US 74, US 1, US 220, NC 211, NC 705, NC 24/27, US 15/501, US 1, I-440.

So is I-795 signed?

Well yes, it is. The signs were put up on Wednesday, November 28th. Interestingly, all the US 117 sign have been removed from the 795 freeway. At some interchanges, there are still US 117 shields. Obviously the overheads aren't updated to reflect the change. There is one hiccup. Where I-795 splits from US 264 to head south to Goldsboro, it is not marked at all. So if you stay East on US 264 expecting to be on I-795, you'll be like "Hey, where did 795 go?" I am sure this will be fixed once the guides and overheads are updated.

There are also END signs like below at both termini. We didn't notice any 'BEGIN' signs.


Also, Alternate banners are still up on US 117. However in some cases, the Alternate banners were never added so it won't be that big of a change on what is now once again US 117. The only question, where will 117 end now. Most likely US 301.

NC 711 ends at I-95 while multiplexed with NC 72 for about a quarter of a mile. Also, NC 711 is signed North/South when it clearly goes East/West. Makes no sense.

So it was off to the new six mile section of I-74 from Maxton to NC 710. And well...It's I-74 and US 74. We've seen Future I-74 and US 74 shielded at the same time...but never Interstate 74 and US 74 shields until now.





Right now, the new six miles of I-74/US 74 is posted at 55 mile an hour. It is primarily open for 'Local Traffic Only' at this point. We'll see what happens come vacation season though. 74 is a key route from Charlotte to the beaches.

Here's a look at the unopened I-74/US 74 East past the NC 710 interchange.



Exits are based on I-74 mileage and the milemarkers have I-74 shields only. Interesting if you are headed eastbound at the end of the former Maxton Bypass. You are forced back on the old two lane US 74. If you want to continue on the six miles of freeway to NC 710. You basically need to take a U-Turn at the end of the on-ramp to get back on the highway.

Speaking of that interchange. You got to love signs like these:

Surprisingly, Interstate 74 shields, milemarkers, and exit numbers continue beyond the newly opened highway to the end of the Laurinburg Bypass. We didn't think that the new signs would have been posted already. Signing plans call for the not quite to exact Interstate standards freeway to be signed as an Interstate. And obviously, they've already been done. I-74 shields are through out the Laurinburg/Maxton bypass and also on surface streets at the interchanges. Most of the exit gore signs read with I-74 exit numbers, as do most of the guides. A few guides need I-74 exit tabs and that's it.

And there is even an 'END' I-74 shield at the eastern end of the freeway.

And I-74 shields have been added onto overheads and guide signs at the beginning of the freeway as well.

From there, it was on to check out some construction progress on the I-73/74/US 220 Ellerbe Bypass. A couple of surprises are found here.

First, it appears that NC 73 will not be routed on the new freeway. It is most likely going to continue on what is now US 220 (which will become either US 220 Alternate or Business or both). And here's proof of why.

First, the exit numbers are based on US 220 mileage. However, there are a few clues. First, the guide sign only reads NC 73 (without any East/West). Second around the interchange there are new NC 73 shields located west of the interchange, meaning NC 73 would not go on the freeway.

Finally, shown below, there is not an NC 73 West shield on the guide signs used for shields on the new highway. This shot was taken from a distance at max zoom so it is a little bit sketchy.

There isn't an NC 73 shield on this guide. But also take note that it reads 'FUTURE' I-73 and 'FUTURE' I-74. This is interesting as most thought the highway would be INTERSTATE 73/74 at this point. The reason is that the freeway to the north that the new highway will connect to is already signed as INTERSTATE 73 INTERSTATE 74. So we'll see what happens.

As a whole, a worthwhile field research trip with a few surprises. It will be interesting to see what happens when the Ellerbe bypass opens if the currently signed I-74/74 to the North changes to Future. Or if Future 73/74 changes. Also, what exactly happens to NC 73. IS my guess that it won't go on the new freeway right? We shall see, the freeway is supposed to open next Spring.

If you made it this far, take some time and read Bob Malme's I-73/74 pages. It gives an accurate and in depth look at the progress of both Interstates in North Carolina.

Comments

Anonymous said…
I gotta hand it to NC, they're the last place that actually is still building new highways to keep up with development, unlike other places where suburbs keep going, and 2 lane roads are overcloged and widening is impossible
Steve A said…
What a horrible clusterfuck... US 74/I-74, NC 73/I-73, bypasses that don't connect to each other... can't the government just let FHWA do its job anymore?
Anonymous said…
There is a statement that needs a little clarification (below), you can do that, however, if you take the exit before it which is the 'A' and not the 'B' it will lead up to the Business 74 as well. But you can drive straight across and be on the On Ramp for the other 6 miles.

(You basically need to take a U-Turn at the end of the on-ramp to get back on the highway.)
Anonymous said…
On another note:
NC wants to route I-74 off US74 through an expensive-to-build-on marshland to Myrtle Beach. Environmentally it will be years to get it passed.
It really should be routed to Wilmington which is better for the state. Wilmington is adding more cargo ports and will need better routes to Charlotte.

Looking at the area, I-73 will already serve Myrtle Beach. This is useless duplication at a horrible expense. But then does anyone at the DOT or politics know what they are doing?

(SC refuses to continue I-20 from Florence to Wilmington due to reducing/losing their beach revenue to NC). So again why should be build an interstate to their beach and not ours?

Popular posts from this blog

Old River Lock & Control Structure (Lettsworth, LA)

  The Old River Control Structure (ORCS) and its connecting satellite facilities combine to form one of the most impressive flood control complexes in North America. Located along the west bank of the Mississippi River near the confluence with the Red River and Atchafalaya River nearby, this structure system was fundamentally made possible by the Flood Control Act of 1928 that was passed by the United States Congress in the aftermath of the Great Mississippi River Flood of 1927 however a second, less obvious motivation influenced the construction here. The Mississippi River’s channel has gradually elongated and meandered in the area over the centuries, creating new oxbows and sandbars that made navigation of the river challenging and time-consuming through the steamboat era of the 1800s. This treacherous area of the river known as “Turnbull’s Bend” was where the mouth of the Red River was located that the upriver end of the bend and the Atchafalaya River, then effectively an outflow

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third

California State Route 203 the proposed Minaret Summit Highway

California State Route 203 is an approximately nine-mile State Highway located near Mammoth Lakes in the Sierra Nevada Mountains of Mono County.  California State Route 203 as presently configured begins at US Route 395, passes through Mammoth Lakes and terminates at the Madera County line at Minaret Summit.  What is now California State Route 203 was added to the State Highway System in 1933 as Legislative Route Number 112.  The original Mammoth Lakes State Highway ended at Lake Mary near the site of Old Mammoth and was renumbered to California State Route 203 in 1964.  The modern alignment of the highway to Minaret Summit was adopted during 1967.   The corridor of Minaret Summit and Mammoth Pass have been subject to numerous proposed Trans-Sierra Highways.  The first corridor was proposed over Mammoth Pass following a Southern Pacific Railroad survey in 1901.  In 1931 a corridor between the Minarets Wilderness and High Sierra Peaks Wilderness was reserved by the Forest Service for po