Columbus Day I-74 Road Trip Discoveries

I took a trip back to the completely open I-74/US 74 freeway to check out the westbound side, which was closed before, and to see what they had done to solve the exit number problem.

I approached the new freeway via I-95. The new Exit 13 signs start out 2 miles in advance.
They have completely demolished the former US 74 (Exit 14) ramps as you can see just before the ramps for the new exit begin. The closeness of the 2 ramps shows why they could not keep the old ramp in service...
The ramps lead to, depending on your point of view, some of the most unique or most confusing BGSs ever to appear on an interstate. Here are photos from both north and south off ramps...
These are taken from the C/D ramps heading southbound on I-95, the only destination I-74 currently goes to is Laurinburg.

I took the eastbound ramp to see how close to completion the freeway was east of I-95.

Coming back, I did a quick 180 to show the signs from the C/D ramps going northbound for those who may be coming to investigate from points south.

This is from the on ramp to Alternate US 74. As you can see there still doing work there, though all the signs are up. Again, these signs may be confusing to some. They have not finished putting the final coat of pavement on the last 2 miles of the freeway and there are no I-74 signs or mileposts past the Alternate 74 exit. Here's a closeup of signs going further along Alternate 74...
For those wondering what the control cities at the various exits east of I-95 are, this should satisfy your curiosity...
Laurinburg is used in place of Rockingham at on ramps closer to that city.

I took the following photos to show how the interchange at NC 710 had changed, formerly the end of the freeway....
This is the NC 710 exit westbound. First, you'll notice the old exit numbers are used. They have started the process of removing the original mileposts that are wrong between what is now Exit 203 (Dew Rd) and is still Exit 220 (Alt/Bus US 74) to the west, but the none of the exit numbers on the old stretch have been changed to back the new. This will probably be Exit 199.

The previous version of the photo you may have seen had the east 74/74 signs covered up. This ramp design is unique in that the entrance is to the left due to the existing road the van is parked on to the right.

I continued on to Laurinburg to see if they had switched out the previous 55 mph speed limit signs. Not only is the speed now 70 for all of the new freeway, the 70 mph limit continues all along the Maxton Bypass until the Scotland County line where it is reduced to 60 mph. The 70 mph stretch is still not up to Interstate standards, as this photo will attest...
Exit numbers have not changed along the Laurinburg Bypass, but they have been covered over for what was Exit 207 (Business US 74) and Exit 209, since these match numbers further east, they also need to cover Exit 210 and Exit 212, since these will be repeats as well. Here's one of the exit signs along the Bypass...
This exit number will be changed to something around 186. For a complete list of current numbers and probable future ones, see my I-74 Exit List.

Lastly, here's a photo of the only triplex eastbound on ramp sign displays in Laurinburg...
Does adding US 501 to the mix make it more or less confusing?

Additional I-73/74 Notes: I returned up US 220 and the I-73/74 corridor. A stretch of the substandard I-73/74 highway north of Candor is signed as a work zone with signs every 1/2 mile warning of 'Low/Soft Shoulder" on both sides of the northbound roadway. The only thing I can think this can be is the widening of the shoulders to Interstate standards. However, according to the latest state TIP this project is supposed to be a couple of years off. Did they get money to do it early, or is NCDOT going overboard in warning of future construction?

Speaking of construction, progress is proceeding on the 2 Visitor's Centers/ Rest Areas near the Randolph/Montgomery county line. The freeway is only 1 lane in each direction around the construction zone. The future northbound rest area can be seen in the distance in the photo below...
Some of the photos above and others will be featured in updated I-74 Segment 15 and Segment 16 pages in the near future.

Comments

dino said…
very nice .. descriptions and pictures too. It will be nice when it is all done. It will be still a few more years.


Dino
Roaddog said…
I don't get how some freeways are classified as Interstates when they have grass shoulders, while others with substandard paved shoulders cannot be posted as an Interstate.
because interstates classify as a highway where it intersects other states (Example: Interstate 40). Sure some roads are classified as interstates when they are only 9 miles long that circles a city, they should have called them SPURS.

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…