Skip to main content

New York State and Connecticut Travel Notes

I headed down to Long Island last weekend (Saturday, January 19, 2009 to be exact) from Binghamton, where I recently relocated to, and I have a few field notes that I wanted to mention for the masses. My field notes are for the trip down, as I couldn't think of as much that was noteworthy on the trip back Upstate.

NY 17 - I saw that the speed limits at times was posted at 55mph along the future I-86 in sections where I would expect the speed limit to be 65mph. This would be between Hancock and Roscoe, in Monticello and also in Wurtsboro.

Understandably, the speed limit is posted as 55mph between Deposit and Hancock, and also in Parksville due to at-grade intersections, driveways and the like. Is the section between Hancock and Roscoe just not up to Interstate standards? It can be a little curvy at times, but to me, it seemed that it would be suitable for 65mph.

The other two sections of road I mentioned may be more valid as to having the lower speed limit. In Monticello's case, you have a town there that may have a lot of traffic that enters and exits NY 17 due to the Monticello Raceway and the accompanying racino, also the resorts and related traffic. In Wurtsboro, there is a long downgrade of NY 17 into the valley below, and this is on both sides of the road.

Old NY 17 - I took the old section of NY 17 between Wurtsboro and Bloomingburg. I found it to be a decent alternative to the Quickway and could be advertised as such if NY 17 is not the best option due to heavy traffic or an emergency situation. One major issue with that is that the route numbering of the old road changes quite a bit. For instance, Sullivan County employs different route numbers for each section of old NY 17. Consistency would be nice, but that doesn't seem to be a priority of NYSDOT or the county highway departments. I may do some extra exploration of old sections of NY 17 in Sullivan County on the way to or from the Upper Delaware River Valley Meet (to be held in NY and PA) in late February.

I-84 - Didn't see the 65mph signs up in Dutchess and Putnam Counties yet.

US 7 - In Danbury and into Brookfield, ConnDOT may want to consider adding a third lane (for exit only purposes) between I-84 and the Federal Road exit as shopping traffic clogs up the right lane now, making life difficult for through traffic.

US 7 Bypass - There is currently a bypass under construction that will extend the US 7 freeway in Brookfield and into New Milford. If I'm in the area, I'll check out any progress of the road construction. Based on observation, police like to patrol the under construction part of road, so it would be difficult to do some in depth exploring on your own, unless you take pictures from the overpass at where the freeway ends currently.

I went up to where the future freeway will cross over North Mountain Road in Brookfield, and see that support beams for an overpass has been constructed, but I am thinking that the bulk of the overpass will be constructed once spring rolls around. As per ConnDOT, construction is slated to be complete for the entire freeway extension in November 2009, so it may be ripe for a possible mini-meet during the year.

I-287 - I drove through the reconstruction in White Plains, and see that there's some bridge construction, lane shifting, and I'm not too sure what else. The reconstruction does not appear to be adding extra capacity, which may help on the Cross Westchester Expressway. I'm not too familiar with this project's goals, to be honest, so if I can be enlightened, please give some information. Hopefully the reconstruction will be over and done with fairly quickly, as I would imagine it's a nightmare to go through on a regular basis.

Comments

mike said…
So is it good or bad that you're now in Binghamton? I miss Danny's Diner which I used to go to almost weekly when I was in Bainbridge. Close to a greasy spoon, but great people, and a great diner atmosphere.
Doug said…
I took a job with New York State which just happened to be located in Binghamton. So I'd say it's a good thing. I would like to move back up to the Albany area, but I don't see that happening for a few years.

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…