Skip to main content

Final(?) Greensboro Sign Trip Photos

I drove around Greensboro today (7/26) to take photos of the signs along I-40 and the Loop that have been updated since my last visit a month ago. The good news is that most, but not all, have been revised to reflect the new route number alignments. First of all, they've removed the Business I-85 and Business I-40 mile markers along the original I-40 and put back I-40 mileposts, such as this:
Also all the US 421 signage west of the Business 85 split has been removed from the roadside, though one still exists in an overhead sign:
They have also revised the exit numbers going west on I-40 for the Loop exits:
The Loop south sign has also been revised to drop the I-40 designation, though no effort has been made to include I-73 in the northbound Loop exit for now. Here's the southbound loop signage at the ramp:
There is room for a second control city, Asheboro is listed in signs at the I-85 interchange, why not here? The sign changes going east on I-40 approaching the Loop are more dramatic:
Traffic to Raleigh is directed along I-40. Since the exit mentions I-85, maybe the addition of High Point or Charlotte could be added here. The signs at the split look like this now:
Following I-73 South, all the exit numbers for Wendover Avenue now read correctly:
Though they still haven't changed the overhead 1/2 mile before the exit:
The ground mounted route signage has changed, however:
The only addition to signage on the rest of the Loop is an End(!) I-73 South sign at the ramp to US 220 (I did not notice any Begin I-73 North signage going the other way):
Signage along US 220 North, Future I-73 has been changed too. Here are how the two exits at the Loop are now signed:
Notice, there is no 'To East I-40" for Exit 78A. This may be because NCDOT hopes traffic is directed to I-40 at the Business 85 Exit.
Though the I-85 for Exit 79 is technically wrong, NCDOT apparently thinks it's important to keep for people looking to access I-85 south. (They could help by putting a south over the I-85 shield). The signage along Business 85 south has also been updated to reflect the I-40 re-routing:
There still are some unfinished projects remaining. All the shield signs along the I-85 section of the Loop still read I-40/85, and the shield signs on I-40 east of US 29 still say Business 40/85. There is the sign at Wendover as indicated above along with the remaining exit number switch for the exit after the Loop on I-40 east, they still list the the Business 85 and former I-85 exit numbers. Hopefully these will all be done by the end of July, as promised by NCDOT.

Comments

Anonymous said…
im confused.....what are the former and present routings of US 421 and US 220? how has that changed as they have commissioned and decommissioned I-40 along the loop?

i often wonder why they don't sign the lower loop AND the upper loop all as i-840....would make a lotta sense, wouldn't it
Bob Malme said…
The US 220 routing hasn't changed, for a long while. I was speaking of the route of I-73 along it. Originally I-73 was to travel all the way north on US 220 to I-40 then take I-40 west to NC 68. NCDOT, for cost and other considerations, decided to place I-73 on the Greensboro Loop to Bryan Blvd then west to NC 68.

As for US 421, up until a month ago it ran north through the Loop and up to what was then Business 40/85 then traveled along with Business 40 west then joined I-40 after it left the Loop. The new route (some still existing signs notwithstanding) place 421 North onto the Loop at I-85 Exit 126 and route it west with I-85, then north with I-73 back to I-40 where it meets the Loop west of Greensboro. The old 126B exit for US 421 North now reads just Greensboro.

As for why NCDOT chose the I-840 designation to only run on the northern section of the Loop, with originally I-40 and I-85, and later I-73 to run on the southern portion, the adding of an additional interstate was not deemed necessary. The stated goal of the Loop at that time was to remove non-Greensboro traffic from the old I-40 Death Valley alignment, an additional I-840 designation doesn't add anything for this purpose. If, from the beginning the NCDOT decided I-40 should stay on its old route, and that I-73 would not use the Loop, then maybe having I-840 on the entire Loop, like I-495 in DC, may have made more sense. It makes it easier just to have 840 as an east/west route north of Greensboro, maybe that will change once the entire Loop is completed.
Anonymous said…
Bob, do you have any idea why NCDOT hasn't gone ahead and signed I-73 north of I-40? You had said in a previous post that they hadn't changed the signs for that stretch of road (from I-40 to Bryan Blvd) yet. That gave me hope, as I think it's just stupid to name a large interstate-type road "TO Bryan Blvd" for the next 20 years until the loop is done. Why not just make it I-73 right now? Do you have any insight? They recently put a ground sign about 20 feet after I-73 meets I-40 that says "End I-73 North". Just makes me scratch my head. Love the blog, by the way!
Anonymous said…
From talking with the DOT engineer in charge of the resigning, He said that I-73 would not be signed North of I-40 until the NC-68/US-220 connector is constructed to provide a lengthy segment of I-73 to decrease the confusion to motorists. This connection will also provide a reroute of US-220. As far as I-73 South of the Outer Loop towards Asheboro, He informed that NCDOT was talking with the FHWA in regards to waivers and modifications to the existing US-220 to sign it as I-73 to provide a connection to the existing signed stretch.
Bob Malme said…
The US 220 waiver would come in handy when the I-74 freeway is completed to US 220, now scheduled for 2012. Thus I-73 could then be signed north of I-74 to the Loop, and on the Loop to I-40, connecting it to an interstate at both ends. The segment south of I-74 through Asheboro would still have to be reconstructed for it to be signed I-73/74.
S Summers said…
That would be interesting to have 2stretches of Interstate meet at a skew North of Asheboro. At least the signage would be more consistent at the I-73 and I-85 Jct South of Greensboro. Also, could you get a photo of the End I-73 NB at I-40?

Stephen
Bob Malme said…
Your wish, is my command, thanks to the editor of the Urban Planet Triad forum, who sent me an end North I-73 sign photo, plus other I-73 North photos at Exit 103 (I-40) this afternoon. They are on the I-73 Segment 5 page after the Wendover Ave photos:
http://www.duke.edu/~rmalme/i73seg5.html

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third