If It's Friday, It Must Be (A Trip to) Goldsboro

Since the Greensboro signing changes are coming to an end, and I have other people supplying me with photos now, I decided to take a quick roadtrip the other direction today. Since NCDOT has released its final report on I-795 and announced reconstruction could start as early as next month, I decided to ride the rough road the last time and see if any other changes (signage, mileposts, exit numbers) had changed since my last visit in January.

The quick (and small) answer was no. Everything, except the road surface, was unchanged from when the signs went up in November 2007. Even the hard to see South I-795 to the right sign at the still marked US 117 exit is still there. But I did find some other new things to tell and show.

1. The US 64/264 'exit to nowhere' is almost complete. They were working on tying the completed westbound exit ramps to the highway when I passed by. Fortunately, I was going east because the two right lanes westbound were closed and traffic was backed up to the Business 64 exit (guess what I used on the way back). The signage is up, but covered over. Here's a couple sign photos heading east:
The sign above is at the one-mile mark. While below is at the eastbound exit ramp:
2. New mileposts along US 264. While they are resurfacing US 64/264 in Wake County, they have added mileposts and exit numbers to the 264 exits in Nash County. Previously the numbers didn't start until entering Wilson County a few miles from I-95.
The mileposts start at 23. The first new numbered exit is NC 231, which is Exit 27 (I know looking into the sun and hard to read) the exit signs before the ramps have no numbers, they are just on the gore signs.
The next exit for NC 581 is now numbered 30. If you need any further proof, here's the mile marker before the exit:
The next exit is Exit 34, Sims and is in Wilson County, the first sign is before the county line, so I don't know if it had a number previously:
Based on mileage calculation from the given mileposts the exits in Wake County, when numbered would probably be (going westbound) 22 for NC 39/Bus 264, 21 for NC 97 and 20 for US 64 East (or 20B for the NC 97 and A for the US 64, if you wanted to be exact).

3. Progress on the new US 70 Goldsboro Bypass
I-795 is still down to one-lane through the construction zone for the new US 70 Bypass. Progress has been made in building up the grades for the bypass and exit ramp bridges.
Approaching the construction zone, there will be three separate bridges across I-795.
The bridge piers for the US 70 highway itself.
One of the pieces of construction equipment bringing the grade up to bridge level.

4. The soon to be tree-less end of NC 540 West:
With the groundbreaking on the Triangle Parkway less than a week away, I thought I'd take this shot before the construction equipment appeared to extend the freeway. I noticed no construction equipment on NC 540 itself, but there were a few probably survey trucks on what now makes up the future ramp from East NC 540 to NC 55 East.

5. Misc.
For those who wanted to see an I-795 sign photo:
On the road going west from Pikeville (I drove US 117 starting back to see if there were any alternate US 117 signs, there were not, but they probably never were put up).

And, finally for those who haven't seen the End I-73 North sign I have on my I-73 Segment 5 page, another version, courtesy of Evan Semones:
I will return to I-795 once I've learned the reconstruction project is finished, which NCDOT says should be December.

Comments

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…