If It's Friday, It Must Be (A Trip to) Goldsboro

Since the Greensboro signing changes are coming to an end, and I have other people supplying me with photos now, I decided to take a quick roadtrip the other direction today. Since NCDOT has released its final report on I-795 and announced reconstruction could start as early as next month, I decided to ride the rough road the last time and see if any other changes (signage, mileposts, exit numbers) had changed since my last visit in January.

The quick (and small) answer was no. Everything, except the road surface, was unchanged from when the signs went up in November 2007. Even the hard to see South I-795 to the right sign at the still marked US 117 exit is still there. But I did find some other new things to tell and show.

1. The US 64/264 'exit to nowhere' is almost complete. They were working on tying the completed westbound exit ramps to the highway when I passed by. Fortunately, I was going east because the two right lanes westbound were closed and traffic was backed up to the Business 64 exit (guess what I used on the way back). The signage is up, but covered over. Here's a couple sign photos heading east:
The sign above is at the one-mile mark. While below is at the eastbound exit ramp:
2. New mileposts along US 264. While they are resurfacing US 64/264 in Wake County, they have added mileposts and exit numbers to the 264 exits in Nash County. Previously the numbers didn't start until entering Wilson County a few miles from I-95.
The mileposts start at 23. The first new numbered exit is NC 231, which is Exit 27 (I know looking into the sun and hard to read) the exit signs before the ramps have no numbers, they are just on the gore signs.
The next exit for NC 581 is now numbered 30. If you need any further proof, here's the mile marker before the exit:
The next exit is Exit 34, Sims and is in Wilson County, the first sign is before the county line, so I don't know if it had a number previously:
Based on mileage calculation from the given mileposts the exits in Wake County, when numbered would probably be (going westbound) 22 for NC 39/Bus 264, 21 for NC 97 and 20 for US 64 East (or 20B for the NC 97 and A for the US 64, if you wanted to be exact).

3. Progress on the new US 70 Goldsboro Bypass
I-795 is still down to one-lane through the construction zone for the new US 70 Bypass. Progress has been made in building up the grades for the bypass and exit ramp bridges.
Approaching the construction zone, there will be three separate bridges across I-795.
The bridge piers for the US 70 highway itself.
One of the pieces of construction equipment bringing the grade up to bridge level.

4. The soon to be tree-less end of NC 540 West:
With the groundbreaking on the Triangle Parkway less than a week away, I thought I'd take this shot before the construction equipment appeared to extend the freeway. I noticed no construction equipment on NC 540 itself, but there were a few probably survey trucks on what now makes up the future ramp from East NC 540 to NC 55 East.

5. Misc.
For those who wanted to see an I-795 sign photo:
On the road going west from Pikeville (I drove US 117 starting back to see if there were any alternate US 117 signs, there were not, but they probably never were put up).

And, finally for those who haven't seen the End I-73 North sign I have on my I-73 Segment 5 page, another version, courtesy of Evan Semones:
I will return to I-795 once I've learned the reconstruction project is finished, which NCDOT says should be December.

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …