Before the Dirt Flies on the Triangle Expressway

A recent news report indicated that there has been a delay in starting construction of the Triangle Expressway, the future toll portion of the 540 loop around Raleigh and connector between I-40 in Research Triangle park and 540. They blamed it on some permitting issues (maybe there now too close to NCDOT and inheriting their working traits). This gave me some time to take some 'before' photos at least along the corridor of the future Triangle Parkway that will run between I-40 and what is now the Davis Drive exit on NC 540. Starting at the northern end, or beginning:
This is current NC 147 South before it takes the curve to end at Alexander Drive. The Parkway will go straight and the connection to Alexander will be eliminated. If you see the gravel on the left, this was the only sign of construction I saw along the corridor. The following photos show the ending of NC 147 at Alexander that will be removed:
The stoplight at Alexander with signage common in Research Triangle Park. You can reach NC 54 and Davis Drive going to the right.
The soon to be late connection to the Durham freeway as it appears heading SW on Alexander.

Another look at the only new Parkway related construction I saw heading North on NC 147:
This may have been dug up to aide survey teams. The Parkway will cut across the photo probably starting near the I-40 sign and to its rear.

Heading on NC 540 West, the only signs of impending construction are new orange signs:
These signs are just beyond the exit ramp for the Exit 69, NC 54.
According to these signs the construction zone will begin just before the current Davis Drive exit ramp. The current access to Davis Drive will be changed and access will become part of the Triangle Parkway interchange built between the current off- and on-ramps.
This is the large open gap (about 1/2 mile) between the current ramps from Davis Drive is for use as part of the continuation of the Triangle Expressway onto NC 540 west as part of the continuation of the Triangle Expressway.
From the 'End Construction' sign you can see beyond the NC 55 exit sign, it appears, for now anyway, construction on this end anyway will concentrate on building the Triangle Parkway and not the Western Wake Freeway, the extension of NC 540.

As if there's any more evidence no construction has started:
This is the western end of NC 540. The site of the August groundbreaking can be seen on the left side. The access road and the ceremonial dirt put up next to where the stage was built still sitting there.

Finally here's where traffic on NC 55 will access the toll route west, then south toward Apex:
I will be back to this area, once the constant Turnpike Authority phrase "Construction could start in the next couple weeks" rings true.

Comments

brett said…
i've seen several times that the current end of 147 at alexander dr will be closed when the freeway is extended. but what if they did this instead: 1) close the northbound lanes entirely; 2) leave the southbound lanes open as an exit from 147 south to alexander dr.; 3) construct an entrance ramp from alexander dr. to 147 south at the current intersection; 4) construct an exit/entrance pair (entrance being a long loop) to and from northbound 147 to 54, maybe with the ramps ending at the intersection with park circle dr. 1/4 mile east of where 54 passes over 147. the latter may be too close to i-40 to be safe but the former shouldn't be a problem, eh? has anyone thought of this idea before? it could help mobility around not only south durham but also that section of rtp and keep maybe a small amount of traffic off of i-40.
Anonymous said…
Anyone here know whether they're going to reconstruct the exit from South NC 147 to East I-40 to a flyover and right entrance instead of the horrid left entrance? Or would that be in conflict with the nearby Davis Drive exit?
123 123 said…
This comment has been removed by a blog administrator.

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…