I took a trip on Monday to see what progress, if any, had been made in some of the highway projects I am following starting in Durham then heading west on US 64 to Asheboro, northon US 220 to Greensboro then back east to Durham on I-40/85.
1. The Triangle Parkway
Construction it appears has finally begun with the start of clearing of the toll road's right-of-way. The evidence is at the northern end and does not extend south to the Davis Drive (still under construction to make it a 4-lane highway) interchange on NC 540:
View heading south on NC 147 just before it turns to end at Alexander Drive.
Closer view of the area cleared and the construction equipment.
Meanwhile, all was quiet at the other end of the construction corridor where the Parkway will meet NC 540 (mostly hidden y the grass under the ramp bridges).

2. The Future I-73 (US 220)/I-74 (US 311) Interchange:
I drove northbound from Asheboro and took a few shots of progress in clearing the construction zone for the interchange over the past month:
The first clearance area, this will be for the off-ramp taking I-74 West toward High Point.
The second clearance area where the route signage is located is for construction of the flyover ramp that will take I-74 West over I-73. Here's a better look:
The cleared area may be piled with more dirt if the ramp has to be higher. Lastly, the 3rd construction area...
This will be where the flyover and onramp from I-74 East to I-73 (US 220) north will be built.

3. Some new signage in Greensboro:
I drove through Death Valley on the way back to Durham to take some photos of the new signs and or exit numbers heading east on I-40:
Here's the first new I-40 exit for Randleman Road, this number was for US 220 when I-40 was on the Loop, now it's less interesting.
The once unique six-shield sign assembly, is now down to 5. There are even fewer shields on the overhead signs-
US 421 North used to be on what is now Exit 223 and 421 South on what is now Exit 222.
The shield signs were finally corrected in August, I still don't see the need for Business 85 here.
And finally, a dichotomy of exit numbers--
The I-40 one is on the right, but the next exit is with I-85 mileposts. It would be nice if you could travel 95 miles in the equivalent of a 1/2 mile according to the sign, but then I'd miss exiting to Durham.

Comments

Anonymous said…
I'm glad they finally move on with the future I-73/I-74 interchange.. if only if they can just work on the section through Asheboro asap.
Bob Malme said…
The Asheboro work is to be let next year. The letting actually has been moved up three months to next June. This means work could start as early as July 2010. It will be interesting to see which project is completed first, and what this does to changing out the Future Interstate signs along US 220 north and south of the I-74 interchange.
Anonymous said…
that is a great news! They need to get that section done too.. hopefully they can finish the entire route and have both interstates signed in NC by at least 2030. (Cant say for other states except SC whom is now getting so involved with trying to build I-73 from NC border to Myrtle Beach.)

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…