A Columbus Day Construction Progress Trip

I took a trip on Monday to see what progress, if any, had been made in some of the highway projects I am following starting in Durham then heading west on US 64 to Asheboro, northon US 220 to Greensboro then back east to Durham on I-40/85.
1. The Triangle Parkway
Construction it appears has finally begun with the start of clearing of the toll road's right-of-way. The evidence is at the northern end and does not extend south to the Davis Drive (still under construction to make it a 4-lane highway) interchange on NC 540:
View heading south on NC 147 just before it turns to end at Alexander Drive.
Closer view of the area cleared and the construction equipment.
Meanwhile, all was quiet at the other end of the construction corridor where the Parkway will meet NC 540 (mostly hidden y the grass under the ramp bridges).

2. The Future I-73 (US 220)/I-74 (US 311) Interchange:
I drove northbound from Asheboro and took a few shots of progress in clearing the construction zone for the interchange over the past month:
The first clearance area, this will be for the off-ramp taking I-74 West toward High Point.
The second clearance area where the route signage is located is for construction of the flyover ramp that will take I-74 West over I-73. Here's a better look:
The cleared area may be piled with more dirt if the ramp has to be higher. Lastly, the 3rd construction area...
This will be where the flyover and onramp from I-74 East to I-73 (US 220) north will be built.

3. Some new signage in Greensboro:
I drove through Death Valley on the way back to Durham to take some photos of the new signs and or exit numbers heading east on I-40:
Here's the first new I-40 exit for Randleman Road, this number was for US 220 when I-40 was on the Loop, now it's less interesting.
The once unique six-shield sign assembly, is now down to 5. There are even fewer shields on the overhead signs-
US 421 North used to be on what is now Exit 223 and 421 South on what is now Exit 222.
The shield signs were finally corrected in August, I still don't see the need for Business 85 here.
And finally, a dichotomy of exit numbers--
The I-40 one is on the right, but the next exit is with I-85 mileposts. It would be nice if you could travel 95 miles in the equivalent of a 1/2 mile according to the sign, but then I'd miss exiting to Durham.

Comments

Anonymous said…
I'm glad they finally move on with the future I-73/I-74 interchange.. if only if they can just work on the section through Asheboro asap.
Bob Malme said…
The Asheboro work is to be let next year. The letting actually has been moved up three months to next June. This means work could start as early as July 2010. It will be interesting to see which project is completed first, and what this does to changing out the Future Interstate signs along US 220 north and south of the I-74 interchange.
Anonymous said…
that is a great news! They need to get that section done too.. hopefully they can finish the entire route and have both interstates signed in NC by at least 2030. (Cant say for other states except SC whom is now getting so involved with trying to build I-73 from NC border to Myrtle Beach.)

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…