NC's New (Very Welcoming) I-73/74 Visitor Centers

Since a snowstorm forecast for this weekend would probably scuttle my road trip plans, I decided to take advantage of the temporarily spring-like weather on Thursday (1/28) to visit the two newly opened I-73/74 Rest Areas/Visitor Centers.

SOUTHBOUND VISITOR CENTER
My first stop was the southbound rest area that is up a hill and looks over the freeway corridor below. Below is a photo of the complex, except for the vending area:
Here's a closer look at the Visitor Center itself:
The controversy over building these rest areas was whether they should be 'Welcome Centers' or 'Visitor Centers.' The state backed down on Welcome Centers because they would be run on state funds and were seen as inappropriate for this location. From looking at the photos above, and the what was put into the surroundings, it appears what we have here though is Welcome Centers in all but name. The parking lots for both are very large, at least just as large as the I-85 South Welcome Center near the Virginia line. While this Center concentrates on information about the local pottery region, they also have brochures on all NC regions-Coastal, Piedmont, Mountain, that the other Welcome Centers do. Like them also, they also have state maps, (there were plenty available, so I took one, even though I have 2 others). There were 2 staff members who were available to answer any question I had. A closer look at the restroom facilities also shows that little expense was spared, everything automatic, they even have those 'airplane engine' hand drying fans (and some may see a familiar car):
There is a separate building for vending machines (Pepsi products only, this is NC) and various snacks. The rest area also has picnic tables above the Center buildings so people can sit and or eat with a view (area was closed off, not quite finished yet apparently).
Before heading off to the Northbound rest area, here's the view of it from southbound:
NORTHBOUND VISITOR CENTER
Signage approaching the Northbound Center:
The material in the right lane was salt brine put down to help de-ice the road for the upcoming storm. Another photo at the off ramp, for those who like signs...
The buildings are designed similarly in the northbound center, though the layout is a little different. Instead of a hill with a view, the attraction here is the fountain in front of the Visitor Center entrance:
The fountain is also in proximity to the US and state flagpoles:
You can see part of the southbound rest area's parking lot in the distance. Finally, since you probably want to check out the facilities:
Again, probably much fancier than the public imagined when they got the legislature to 'downgrade' the rest areas to Visitor Centers. As you would imagine, on a winter weekday, there were not many visitors. There were 4 cars at the southbound and perhaps 5 northbound. It will be interesting if there are any complaints about the costs of construction, once more people get to visit these two Centers.

An I-73/74 Extra. When is a freeway both a current and a future interstate at the same time?
Just beyond Exit 51 Northbound where the signs indicate you are on North I-73 and West Future I-74. This is actually an apt mistake since this section of the road is close to interstate standards and continues to just before the next exit. NCDOT signs this section at 65 MPH and the medians are narrower but still wider than other parts of US 220. The section ends at the next exit which is not a National Highway System Route, otherwise NCDOT may have been able to extend the Interstates further north for real.

Comments

Anonymous said…
These are unbelievable facilites....who runs them and what did it cost to build them in the middle of no place!?

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…