Roadtrip to Greensboro Through High Point

As Adam indicated on his I-73 meeting post, I took a trip Thursday afternoon to attend the workshop put on by NCDOT showing the revised plans for the NC 68-US 220 Connector. I also was able to talk to engineers working on the project to start in 2012 which will widen US 220 south of NC 68 to the Connector. Adam posted what I learned on his previous entry.

On the way, I thought I'd take the opportunity to confirm sign revisions along the I-85 portion of the Greensboro Loop I hadn't visited before and to check on progress since December in building the new I-74 freeway. According to NCDOT documentation, only .3% progress had been made in the month since, not surprising given the weather. The project between Business 85 and Spencer Road at the end of the year was listed as being 81.2% complete.

1. US 421 signage. My trip took me down US 15-501 south to US 64 east to US 421 North to I-85.
I wanted to make sure the signage on 421 north had been revised after the I-40 re-routing:
The signs had been revised. It appears the I-85 sign was moved to the left with the US 421 shield and direction added on the right.
For the overhead sign on the left a similar act was done, however the sign on the right is the original, notice that I-40 is listed first, the 'To' was also never taken down so no revision was necessary when I-40 was taken off the Loop.

2. I-74 Construction. Since it was a weekday and there was a lot of construction activity still going on. I visited all the sites I could before the sun set, and then proceeded to the meeting.
A. Baker Road-A contact e-mailed me earlier in the day that they were placing what appeared to be a final layer of concrete on the bridge that morning. When I got there in the afternoon, they had closed the eastbound roadway so they could extend asphalt from the original road alignment to the new bridge:
This had already happened on the other side of the bridge. If they were able to place lane markings on Friday, and the concrete they put down cures very rapidly, then it's possible the bridge is open or will open during the next week. This is the last existing road bridge that needed to be built for the freeway. The only bridge construction left is for the new I-85 bridges over I-74 whose sides still only consist of wire mesh and need additional concrete. They also have to complete laying asphalt on the flyover ramp (more on that later).

2. Jackson Lake Road. The view from the bridge toward the west still shows a lack of a westbound lane. Though some of the dirt may have been removed. Dirt for landscaping, which work was proceeding on the other side of the bridge, can be seen on the completed lanes behind the remaining dirt that needs to be removed:
3. Kivett Road Bridge and area between Kivett and I-85. The view of the bridge actually shows more dirt from before. I assume removed as part of the westbound side landscaping process:
The vehicle seen going the wrong way on the future eastbound lanes by the bridge was one of many contractor vehicles still in operation around 5PM. It appears the contractors are trying to make up for time lost in December. Some of the landscapes built for the freeway are quite impressive, such as the size of the hill rising along the eastbound lanes as seen from Dresden Road. This is mostly made up of material dug up to grade the roadbed in the surrounding area:
The view toward the I-85 bridge shows progress on landscaping toward the new interstate bridges:
Dust from the ongoing work is obscuring the landscape beyond the construction equipment. Here's a closer look at all the landscaping work being done:
4. I-74 freeway on other side of I-85. Little progress is visible since most work, including guardrails has already been completed. The on ramp to I-85 North from I-74 West must be complete as the yellow contractor vehicle seen above the orange and white road closed barrier was using it at a high speed after 5, maybe in a hurry to go home?:
All the ramps to I-85 appear complete, the only unpaved section seems to be the part of the flyover ramp before the bridge. They also need to place guardrails along that ramp and the eastbound ramps as they have completed on the west side.

5. Poole Road Bridge. Not much progress seen here, again because most of the freeway roadbed had been completed in the fall. There is, however, a connection to a bridge over a creek, looking westbound, and landscaping, that still needs to be completed:
Meanwhile, the view toward the east from the Poole Road Bridge:
Shows further need of landscaping and possible guardrails as one proceeds toward Cedar Square Road.

6. Cedar Square Road and Exit Ramps. They have completed the new connection between Poole and Cedar Square Roads. Poole Road, however, still meets the old alignment at Cedar Square, forcing a 90 degree turn:
A view of the Cedar Square Road bridge from this intersection. They have started ripping up the old Cedar Square roadbed to build the new freeway lanes west of the bridge, they have many more truckloads of dirt to go:
This is looking westbound from the corner turn at Poole Road where Cedar Square Road used to go. They have not made this very clear to motorists on US 311. Several of which traveled up to the barrier and had to turn around while I was there. This is the view looking back toward Poole Road showing the progress in building the eastbound off ramp:
The ramp starts on the left lane after the yellow excavator and proceeds off the highway where the orange barrels are. This I guess is to signify construction trucks have to use the ramp, for now, to get to the other side of old Cedar Square alignment. Here's the new intersection of Poole and Cedar Square Roads which will be opposite both the westbound on and off ramps:
There will be a traffic signal placed at this location when the freeway ramps are opened. If the contractors can make it up to 85% completion by the beginning of March, then I think a June 2010 opening, quoted by NCDOT officials to those in High Point, is still possible.

Comments

Popular posts from this blog

Old River Lock & Control Structure (Lettsworth, LA)

  The Old River Control Structure (ORCS) and its connecting satellite facilities combine to form one of the most impressive flood control complexes in North America. Located along the west bank of the Mississippi River near the confluence with the Red River and Atchafalaya River nearby, this structure system was fundamentally made possible by the Flood Control Act of 1928 that was passed by the United States Congress in the aftermath of the Great Mississippi River Flood of 1927 however a second, less obvious motivation influenced the construction here. The Mississippi River’s channel has gradually elongated and meandered in the area over the centuries, creating new oxbows and sandbars that made navigation of the river challenging and time-consuming through the steamboat era of the 1800s. This treacherous area of the river known as “Turnbull’s Bend” was where the mouth of the Red River was located that the upriver end of the bend and the Atchafalaya River, then effectively an outflow

Interstate 10S and the original Interstate 110 in California

Interstate 10S is a short spur of Interstate 10 along San Bernardino Freeway in downtown Los Angeles.  Interstate 10S begins at the Santa Ana Freeway (US Route 101) and extends east to Interstate 5 where it merges into mainline Interstate 10.  Interstate 10S is one of the oldest freeway segments in Los Angeles having been part of US Routes 60, 70 and 99 when it was part of the corridor of the Ramona Expressway.  The current corridor of Interstate 10S was assigned as Chargeable Corridor H following the passage of the 1956 Federal Highway Aid Act.  Interstate 110 was a short-lived designation which comprised the segment San Bernardino Freeway from US Route 101 to Interstate 5 between 1964-1968.  The original Interstate 110 was dropped as a Chargeable Corridor during 1965 and consolidated as Interstate 10S during 1968.   The original Interstate 110 can be seen as the blog cover photo as it was featured on the 1964 Division of Highways Map.  Below the entire 0.65-mile length of Interstate

Vicksburg Bridge (Vicksburg, MS)

  Located a few hundred feet downriver from the Old Vicksburg Bridge, the Vicksburg Bridge, or the “New” Bridge, serves as the city’s vehicular crossing of the Mississippi River on the main highway connecting Vicksburg with northeastern Louisiana to the west and the state capital of Jackson to the east. The completion of the original Vicksburg Bridge in 1930 was seen as a huge success and the bridge proved to be a profitable entity for both road and railroad interests along the path of the Dixie Overland Highway and the subsequent US Highway 80 corridor. In the years after the creation of the National Interstate Highway System, planning commenced on a new bridge at the site that would relieve the congestion on the existing bridge while providing for a more modern crossing of the river that would be safe for all vehicles. The construction of the new bridge at Vicksburg was completed in 1973 and its design intentionally mimics that of its predecessor nearby. This was due in large part