Skip to main content

US DOT announces recipients of $1.5 billion in TIGER Grants

The US Department of Transportation today announced the recipients of $1.5 billion in TIGER Grant funding. Of nearly 1400 requests for funding that was a combined total of $56.5 billion, 51 projects - or 3.7% of those submitted - received TIGER funding.  The awards ranged from a maximum of $105 million to a minimum of $3.15 million.

To see the list of grant winners - go here.

Only four of the 51 awarded projects will be fully funded with TIGER financing.  They include a $14 million project that will improve the infrastructure at three Maine seaports, $45 million for a new 1.5 mile New Orleans Streetcar line from Union Station to Canal St. along Loyola Ave., $35 million to complete 3.7 miles of a US 395 freeway in Spokane (the money will build two missing southbound lanes), and $3.5 million for improvements to US 93 in Whitefish, MT.

Specific of interest to this blog, $10 million each was awarded to the I-85 Yadkin River Bridge project and the eventual construction of I-73 in Dillon County, SC.  (More on those later in separate entries).

It appears that the best way to have won these grants is to have been a multi-modal project.  One of the bigger projects was a total rebuild of an I-244 bridge in Tulsa, OK.  The new bridge will handle Interstate highway traffic, passenger rail, and have a pedestrian and bike trail access.  The project received nearly $50 million in TIGER Grant money.  The project is estimated to cost $86.7 million.

USDOT's selection criteria included - Long-Term Implications (end project life, economic impact, quality of living improvements, environmental sustainability, and safety), immediate economic impact, innovation, and financial partnerships.

As a result nearly half of the winning projects (22 of 51 - 43%) were transit and street scape based projects. $20 million was awarded to Revere, MA for a project that "...will reconfigure acres of dilapidated and aging surface parking lots into a vertical multi-modal transit facility and plaza, linking automobiles, transit, pedestrians and bicyclists in a hospitable environment that encourages alternative transportation options. The project will also construct a multi-modal, pedestrian-focused streetscape along Ocean Avenue..."  $23 million was allocated to repair, reconstruct, and improve 16.3 miles of pedestrian and bicycle paths in Metropolitan Philadelphia. 

As predicted, the states, cities, and other projects did not receive any grant funding were very disappointed.  A streetcar transit project for Cincinnati was not included.  As was a streetcar project along Peachtree St. in Atlanta.  Disappointment made it as far as Guam as a request for $49.7 million to improve the port there was rejected.

I'm going to take a look at the North Carolina and South Carolina awards in another blog entry.  You may see other members of the blog comment on grants given in their states.  If you are looking for some details on other projects winning TIGER Grant money - follow some of these links:
  • Kevin Flynn's Inside Lane covers the $10 million awarded to Colorado for a US 36 managed lanes/bus rapid transit project between Boulder and Denver
  • The Navajo Nation received $31 million for widening and improvements of the dangerous US 491 corridor in Northwestern New Mexico.  The project site is here.

Comments

Popular posts from this blog

Small Towns of Virginia Series - Charlotte Court House

This sleepy little rural town in Central Virginia can easily be overlooked.  Located miles from the Interstate or four lane US and Virginia Highways, Charlotte Court House in many ways is easily forgotten.  However, this tiny town of slightly over 400 residents holds a lot of Virginia and American History.

In 1799, Charlotte Court House saw the passing of the torch from an aging Patrick Henry and a young John Randolph.  The great debate over states' rights was the last for the fiery Henry and the first in public for Randolph.  Randolph would go on to serve in the US House of Representatives and U.S. Minister to Russia.  Henry, who was serving in the Virginia General Assembly representing Charlotte County at the time of the debate, died three months later.

Charlotte Court House is not the original name of the town.  Originally named The Magazine, then Daltonsburgh, followed by Marysville (which was the town's name at the time of the Henry-Randolph debate), Smithfield, and finally…

History of the Wawona Road (Yosemite National Park)

Recently I located a portion of the Old Wawona Road that was the original alignment used by wagons and early cars to get to Yosemite Valley from the south before the Wawona Tunnel was built.  Locating the Old Wawona Road was the primary driving force to head to a very dry Yosemite National Park this winter.






Generally I don't talk about the history of a route first, but in the case of the Wawona Road I thought it was particularly important to do so first.  The modern Wawona Road is approximately 28 miles in length from the north terminus of California State Route 41 at the boundary of Yosemite National Park to South Side Drive near Bridalveil Falls in Yosemite Valley.  A good chunk of people entering Yosemite Valley use the Wawona Road which generally is considered to be the easiest route...that certainly was not always the case.

The origins of the Wawona Road are tied to the Wawona Hotel.  The first structure in the Wawona Hotel complex dates back to 1876 which was built by the Wa…

Old California State Route 41 on Road 425B

While researching the history of the Lanes Bridge crossing of the San Joaquin River I noticed an oddity on the 1935 California Division of Highways map of Madera County.  Today California State Route 41 takes a crossing of the Fresno River west of the confluence with China Creek.  Back on the 1935 Map of Madera County the crossing is very clearly east of the confluence crossing on what are now Road 425B and Road 426 in Oakhurst.   CA 41 can be seen traversing southbound from Oakhurst on Road 425B towards Coarsegold on the 1935 Madera County Map.

1935 Madera County Highway Map

After viewing Road 425B on the Google Street Vehicle it was clear that the path downhill from the top of Deadwood Gulch was substantially more haggard than the modern alignment of CA 41.  I finally had occasion to visit Oakhurst today so I pulled off of modern CA 41 at Road 425B.   Immediately I was greeted by this warning sign.






Road 425B ahead was clearly a narrow road but barely wide enough for two vehicles.  T…