Skip to main content

New Exit Signs on Durham Freeway (NC 147)

Recently I posted to SERoads about an NCDOT press release regarding the replacement of interstate exit signs in Mecklenburg County. According to the press release "New signs with reflective sheeting will be installed, improving reflectivity and removing the need for lighting on the sign structure. The completion date is September 3."

New signs will be installed in the following locations:

  • I-77, Exits 1-23
  • I-85, Exits 27-42
  • I-485, Exits 1 and 32-67
  • I-277, Exits 1 and 2
Well, as it turns out, NCDOT has been for the last week installing similar signs (currently only on overhead structures) on the Durham Freeway, mostly southbound. I decided it was easier to show examples of the new signs by driving around Durham instead of traveling to Charlotte:

Here's a couple of the new signs at Exit 16A for US 15/501 North:
A closer look at the next sign for Hillandale Road reveals the light fixtures formerly at the bottom of the sign have been removed:
Sign changes have also occurred further south the last two days towards downtown Durham:
These signs changes are somewhat bittersweet for me, since the old ones were the first signs I saw heading south on the Freeway from my first apartment in Durham on Swift Road. The Freeway ended at Erwin Road at that time and the Swift Road southbound off ramp was the first exit ramp heading south. Exit 13 is also one of the ways to get to the Durham Bulls ballpark.

It appears they haven't quite finished installing the signs south of the city at Briggs Road, yet:
Notice no exit tab over the Briggs Avenue South sign (with, like for route numbers, the larger first letter in the direction label) and the new NC 147 sign still has lights installed. The placement of the exit tab on a separate sign makes it easier to remove for changes. Will there be changes in exit numbers when the Triangle Parkway, an extension of NC 147, is built? MassDOT is now doing the same thing with their new signs in case the FHWA refuses to exempt them from replacing their current consecutive exit numbers scheme with milepost based numbers.

Lastly, since I was there, I am throwing in a photo of the new pedestrian bridge near Alston Avenue completed earlier this spring:
They have posted a couple new signs northbound also. I'll wait though until the project is finished to take a look at those.

Comments

Anonymous said…
Just wanted to point out that they have propagated the error on the Exit 12 sign--that is US 15/US 501 BUSINESS but there's no mention of that fact...
Anonymous said…
I got some of the new sigh replacements when i was in Charlotte. Here is the link.
http://www.flickr.com/photos/azehner/4822047574/
BrentWhite said…
I-77 except for a handful of signs has been upgraded now.

I-85 has been upgraded from Exit 27 (Southbound only) to I-77.
Exit Signs said…
@Brent
Yes i noticed that it has been upgraded now.

Popular posts from this blog

The Abandoned New Stanton Interchange Ramps

For nearly 50 years, the Pennsylvania Turnpike interchange with Interstate 70 and US 119 in New Stanton has been a rather free-flowing double trumpet, grade separated interchange between the two freeways.  But for the first 23 years of the turnpike, this interchange was vastly different.  It was the only non-trumpet interchange within the system (excluding termini points) and featured very tricky and gridlock causing left turns within the interchange.  (See image on right).  With the birth of the Interstate Highway System in the mid-1950s, new freeways were built and in many cases the Turnpike kept the original interchange using local roads to connect to the new freeways.  Interchanges with what would become I-81, I-176, I-80, I-70 in Breezewood, and I-79 were left with the original design.

Meanwhile in the 1950's, the state began building a freeway that ran from New Stanton west towards Washington.  This freeway, signed PA 71, was built to connect those in the industrial Mon Valle…

Quemahoning Tunnel

The Quemahoning Tunnel may have never been built by the Pennsylvanina Turnpike Commission, but it still has a history unto itself.  Originally planned to carry rail along the South Penn Railway, the tunnel never would not see any trains until 1909 when a small line named the Pittsburgh, Westmoreland & Somerset began utilizing it.  The use was brief and by the end of 1916 the PW&S was no longer in operation and abandoned the facility.  Twenty-some years later, the newly formed Pennsylvania Turnpike Commission considered using the abandoned tunnel, in fact it was shown on some original plans.  However, the PTC decided against using it, and the tunnel remained empty.

The eastern portal of the Quemahoning Tunnel is easily accessible from the PA Turnpike.  The portal is located at mile 106.3 along the westbound roadway.  The tunnel is one of the many "What Could Have Been's?" of the Pennsylvania Turnpike.  Below, Bill Symons shares photos taken in late Fall of 1986 of …

Icelandic Highways & Byways (Part 2)

Continuing on our series on traveling in Iceland, we'll explore the Golden Circle, which is a popular tourist route in Iceland. The Golden Circle is easily accessible from Reykjavik and includes such must-see places like Thingvellir National Park (spelled as Þingvellir in the Icelandic language), Geysir, which yes, is a geyser, and the Gullfoss waterfall.So yes, the Golden Circle includes a little bit of everything that Iceland has to offer. For those of you playing at home, I drove the
Golden Circle in a clockwise fashion with an impromptu diversion towards the end of my loop, which meant that I missed the hydroponic tomato farm, but I discovered a few other neat things, so it all worked out in the end.

Thingvellir (Þingvellir) is actually situated within the rift valley that separates the Eurasian and North American tectonic plates, as the site where the Alþingi or Althing (in English), which is the Icelandic Parliament met between the years 930 and 1798. So as you can tell, the…