Labor Day Triangle Parkway Progress Report

With others in the blog crew busy, or away for Labor Day, I decided to see what progress has been made on the Durham section of the Triangle Expressway, the Triangle Parkway since July. I'll wait for when others from the Wake County contingent are interested to explore progress on the part to the south, the Western Wake Freeway. The tour starts from the northern end of the parkway at I-40 and works down to the end at NC 540. The following of note was seen:

1. I-40 Interchange
Some progress has been made in building a more high-speed off ramp from I-40 East. The ramp roadbed continues along the jersey barrier to the south, which I assume will become a merging third lane. Notice the I-40 overhead exit sign. It is one of the new 'highly reflective', needs no lighting, signs that have gone up along the Durham Freeway. The new sign, however, does not have an exit number.

2. NC 54 Bridge
From the previous visit, the impression of the construction was that it was simply going to be a slight movement of the existing bridge to the north. The latest photos, though:
Imply a totally new bridge to the north, possible using some of the existing bridge. Support girders seen above are similar to those at other permanent bridges. Clearing of the other side of the highway is proceeding, so support structures can be placed there as well. The photo below:
Shows how the new bridge may tie in to the old one. Perhaps this is being done so the existing freeway can be slightly re-aligned to the south of the bridge to better join the new parkway.

3. The New Parkway Connection
More progress has been made on the connection from the existing NC 147 to the new parkway as seen in this view from NC 54:
From this view one can see how the route of the Parkway curves around the EPA's property to the right of the Parkway on the way toward Hopson Road. This is the view from 147 South:
There are no signs that the closing of the connection to Alexander Drive will happen in the immediate future.

4. Hopson Road Bridge/Interchange
More clearing has been completed in this area, but no bridge construction has started, as can be seen in this view approaching the site from the west:
Looking south one can see the other end of the interchange area at Davis Drive and beyond:
You are looking down the Parkway mainline. The cranes in the distance are working on the Davis Drive bridge (more details below), to the middle right you can also see bridge construction for the southbound C/D ramp that will run between Hopson and Davis. Looking to the north:
One can see great progress on the road bed beyond the bridge, but that they are still in the first phases of constructing the north side of the bridge itself. They may also still have to deal with utility lines to the south of Hopson Road:
There's also unfortunate news for our favorite place to park to observe progress here, looks like the temporary relocation of Hopson Road will be cutting through 'our' parking lot:
Looking West, with Hopson Road seen below the utility wires. The remote lot is behind the black plastic, the road appears it will use the lot to make it back to Hopson before the building's main parking lot driveway.

5. Davis Drive Bridge and Interchange
The most complete bridge construction on the Parkway can be seen at Davis Drive:
This is to the south of the road, note the 'extras' in the bridge supporting structure, it will include bricks as well as fancy pre-cast cement pieces. They haven't quite finished the brickwork:
Having completed about 2/3 of the work on the far right of the bridge. As a comparison:
The view across Davis is disappointing, with only the bridge landscape work completed. They are also though working on the bridge for the southbound C/D lanes to cross Davis west of the main bridge:
It will be smaller, but I assume will have the same alternating cement and brick design. Since there was a truck ramp to the top of the bridge, I decided to climb it to see the view:
The view to the south takes you almost to Kit Creek Parkway, or what's left of it.
While the view north of the back of the bridge structure is not as interesting as the front:
7. Kit Creek Parkway Bridge and NC 540 Interchange
As RTP travelers know, the Davis Drive exit from NC 540 was closed at the start of Parkway construction. There were two reasons, the need to extend Kit Creek Parkway across the Triangle Parkway via a new bridge and to recreate the existing Davis Drive interchange into the start of the Triangle Parkway. Here's a view of progress so far on the Kit Creek Bridge:
As can be seen, two of the three support structures for the bridge have received their concrete coverings. Here's a view of progress on the bridge structure to the west:
The metal girders have been installed, but not all the precast cement structures have been placed, several are piled up in the construction area:
As for Kit Creek Parkway, it will be put on a new alignment to the south of the existing road to take it over the bridge:
It appears the road will be narrower than the existing road, with perhaps separate entrances to the company to the right:
The view to the north of the future bridge back toward Davis Drive shows progress on grading and an impressive collection of large earth moving equipment:
As for the NC 540 interchange. The photo below is looking south on the Parkway in the direction of NC 540, which cannot be seen due to a sloping hill and piles of construction materials:
They appear to be starting to work on connecting the new Parkway to the existing 'Davis Drive' ramp from NC 540. It appears the roadway from the existing ramp will have to be moved slightly to the left to connect with the new roadway, the east supports of the Kit Creek Bridge are on the left:
I hope to be able to take a longer road trip to view the Wake County portion of the Triangle Expressway sometime in September.

Comments

Popular posts from this blog

California State Route 152

Circumstance had me out in the Monterey Peninsula again this week.  Generally I try to take a route like California State Route 198 or ever County Route J1 to get across the Diablo Range but time had me in a slight bind.  That being the case I took the popular way across the Diablos on California State Route 152 via Pacheco Pass.  152 is one of infamy given it is really the primary route for truckers to get from I-5 west in San Joaquin Valley to US 101 in Salinas Valley.  After zig-zagging some accidents on/off California State Route 99 near Madera in the rural outskirts of the County bearing the same name I began my westbound trek on 152.




CA 152 is called the William Whitehurst Highway, at least it is west from CA 99.  The entire route of CA 152 in San Joaquin is an expressway aside from a small portion in the city of Los Banos.



The first junction on CA 152 is with CA 233 which is a small 4 mile highway that travels northeast to CA 99.






Next westbound CA 152 encounters the junction w…

The National Road - Ohio - Muskingum and Licking Counties

As it travels from Zanesville towards Columbus, US 40 goes through numerous small towns, changes from two to four lanes and back numerous times, but most importantly the old road keeps its rural charm.  Between Zanesville and Gratiot, there are four former alignments of the old road that can be found: just west of Zanesville, Mt. Sterling, Hopewell and Gratiot.  Most stretches are very short and can be easily recognized with names as "Old US 40", "Old National Road" or some combination of the two.

Zanesville:
Just west of US 40's interchange with Interstate 70 (Exit 152) runs an old alignment.

Mt. Sterling:
Another old alignment goes through this small Muskingum County village.
Hopewell:
Today, US 40 passes south of the community of Hopewell.  The old two lane road is known as Hopewell National Road.
Gratiot:
Old US 40 is known as Main Street in this tiny village of 200 or so residents.  The old highway at times seems forgotten through here.
Just west of Gratiot, US 40 …

Throwback Thursday - October 12, 2017

In this week's edition of Throwback Thursday, we travel back to December 2003 to the southern end of Interstate 99 in Bedford, Pennsylvania, where we can see button copy guide signage for US 30 and US 220 (US 220 runs concurrent with I-99 through this part of the Keystone State). Since I-99 was relatively new at the time, it feels like it was an afterthought.