Skip to main content

Photos from the new High Point section of I-74

Yesterday, I hit the road to check out the newly opened section of I-74 in High Point.

Route: NC 98, US 70, I-85, I-40, NC 66, US 311/I-74, NC 62, NC 22, NC 902, Pittsboro-Moncure Rd., US 1, I-40, I-440, US 64/264 home.

The entire roadtrip is on flickr - 93 photos in total - and can be accessed here.

The newest segment of Interstate 74 begins at the Main Street Interchange (Exit 65).  This was where Business US 311 split off into downtown High Point, but it's been recently decommissioned.

100_0075

As you can see I-74 is shown on the overhead.  There is not a 'BEGIN' I-74 shield - so I-74 East just comes out from out of nowhere.

The I-74 East shield is also on an overhead at the next exit for Johnson St.

100_0055

However, at this time there are not any I-74 shields on the ground or at the interchange ramps until Exit 71B - Business I-85.  If you are headed Eastbound, the first I-74 East shield stands after the I-85 interchange (Exit 75).

IMG_9765

At Cedar Square Road, one of I-74 East's four 'END' signs in North Carolina appear.

IMG_9766

The other 'END' signs are located at the end of the I-74 segment in Mount Airy, this shield, one with I-73 South in Candor, and just east of NC 41 in Robeson County.  This doesn't count the 'END' Future 73/74 Corridor at US 1 and US 74 in Rockingham or for Future I-74 in Ellerbe.

The new, albeit temporary, routing for US 311 is well signed at Cedar Square Road.

IMG_9768

This is a look from the end of the freeway, as Bob reports, this won't be done until 2012.

IMG_9773

As soon as you get on the freeway, you're greeted by this.

IMG_9774

The newly opened road is rather quiet from Cedar Square Road to I-85.  And I must admit, fresh asphalt on a clear blue sky day looks pretty good.

100_0061

Though you can't access NC 62 from I-74/US 311 you can via I-85 South (more on that later).

IMG_9777

A narrow US 311 shield is posted just west of the I-85 interchange.

100_0068

The overheads on westbound I-74 at Kivett Drive is the last mention of I-74 through Main St. - Exit 65.

100_0072

At Main St., it's just plain old US 311 North.

100_0074

Immediately after the Main St. Interchange - a Future I-74 Corridor sign is posted.

IMG_9778

I-74 is signed at Business 85.

100_0080

100_0083

Here are some of the signs for I-74 & US 311 on I-85.

100_0088

100_0089

100_0090

From there, it was a leisurely drive back to Knightdale, with most of my photo time spend in Randolph County.

Comments

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…