Skip to main content

Photos from the new High Point section of I-74

Yesterday, I hit the road to check out the newly opened section of I-74 in High Point.

Route: NC 98, US 70, I-85, I-40, NC 66, US 311/I-74, NC 62, NC 22, NC 902, Pittsboro-Moncure Rd., US 1, I-40, I-440, US 64/264 home.

The entire roadtrip is on flickr - 93 photos in total - and can be accessed here.

The newest segment of Interstate 74 begins at the Main Street Interchange (Exit 65).  This was where Business US 311 split off into downtown High Point, but it's been recently decommissioned.

100_0075

As you can see I-74 is shown on the overhead.  There is not a 'BEGIN' I-74 shield - so I-74 East just comes out from out of nowhere.

The I-74 East shield is also on an overhead at the next exit for Johnson St.

100_0055

However, at this time there are not any I-74 shields on the ground or at the interchange ramps until Exit 71B - Business I-85.  If you are headed Eastbound, the first I-74 East shield stands after the I-85 interchange (Exit 75).

IMG_9765

At Cedar Square Road, one of I-74 East's four 'END' signs in North Carolina appear.

IMG_9766

The other 'END' signs are located at the end of the I-74 segment in Mount Airy, this shield, one with I-73 South in Candor, and just east of NC 41 in Robeson County.  This doesn't count the 'END' Future 73/74 Corridor at US 1 and US 74 in Rockingham or for Future I-74 in Ellerbe.

The new, albeit temporary, routing for US 311 is well signed at Cedar Square Road.

IMG_9768

This is a look from the end of the freeway, as Bob reports, this won't be done until 2012.

IMG_9773

As soon as you get on the freeway, you're greeted by this.

IMG_9774

The newly opened road is rather quiet from Cedar Square Road to I-85.  And I must admit, fresh asphalt on a clear blue sky day looks pretty good.

100_0061

Though you can't access NC 62 from I-74/US 311 you can via I-85 South (more on that later).

IMG_9777

A narrow US 311 shield is posted just west of the I-85 interchange.

100_0068

The overheads on westbound I-74 at Kivett Drive is the last mention of I-74 through Main St. - Exit 65.

100_0072

At Main St., it's just plain old US 311 North.

100_0074

Immediately after the Main St. Interchange - a Future I-74 Corridor sign is posted.

IMG_9778

I-74 is signed at Business 85.

100_0080

100_0083

Here are some of the signs for I-74 & US 311 on I-85.

100_0088

100_0089

100_0090

From there, it was a leisurely drive back to Knightdale, with most of my photo time spend in Randolph County.

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …