Some Massachusetts Construction Photos

Since I've moved here to Mass. from NC, things are less exciting on the highway construction front. No one is building new interstates or toll roads, for better or worse. Most of the projects have to do with reconstruction of bridges and adding lanes to existing highways. Of the latter, the major project closest to me is the adding of an additional lane along 'Route 128' from I-93 Exit 4, MA 24 in Randolph north to I-95 Exit 20, MA 9 in Wellesley. The project began several years ago with the replacing and/or widening of bridges to cross 8-lanes of traffic, instead of 6. After bridges in a certain area were replaced, work began on widening the highway and placing new signage, some vastly improved over what previously existed. Bridge work and widening has largely concluded between the end of I-93 to US 1 in Dedham. Bridge work also has been completed along I-93 between exits 4 and 2 and work on widening by replacing the grass median by concrete barriers is continuing. When the barrier work is done, new signs tend to spring up. This is the latest sign to appear:
This is an improvement over the former small sign that just had a I-95 shield and '2 Miles' below it. However, it has some problems at the moment. I-93 Exit 1 is for I-95 South to Providence. You don't have to exit for I-95 North. I suspect, given the large space after the 1 on the exit tab, that like the MA 3 north merge onto I-93 North in Braintree which was unlabeled but is now designated as Exit 20A, and with the beginning of I-93 a non-ramp 3 lane 'Exit 12,' that eventually this exit sign will say Exits 1A and B and by not exiting onto current Exit 1 you'll be taking 'Exit 1A' onto I-95 North.

Here are the next set of new signs southbound, which went up about a month ago:
These are fine, except they have not put up new MA 138 exit signs before these at the 1 mile mark as of yet. You can see the concrete median barrier that will replace the grass median on the left. Below is a closer shot of the progress they are making in clearing the median for paving and installing the barrier, they are almost to the MA 138 bridge:
The barriers continue almost to the I-95 interchange, but placing asphalt for lanes probably won't restart until March or April. Here's the start of the median project heading north on I-93/US 1 with the MA 138 interchange in the distance:
You can see the pavement needs to be replaced badly, there are several potholes and winter hasn't even begun yet. Heading further north one can see the first sign replacement from last summer for the exit to MA 24, changing from a typical BGS to a diagrammatic sign:
The area to the left is one of the entrance areas for construction vehicles working on the median barrier, once a 1/2 mile or so section is complete the jersey barriers are taken down and replaced by orange barrels. Two newer signs have appeared for the next exit in the past month:
There's one previous sign that has not been changed. The new sign at the ramp is the last new sign heading northbound on I-93 (a sign replacement project, a separate contract is supposed to take care of replacing the signs north of MA 24 to Boston, but it has not started yet even though it was let in late 2008).

The new lanes have mostly been placed on I-95 from where I-93 ends past US 1, but it is still a 3 lane highway each way due to construction of sound barriers:
The orange barrels are in the future breakdown lane, they get moved out at least 1 lane when construction is going on. The sound barriers go north from after Exit 13 all the way up the ramp for Exit 14, as seen here:
The sign for Exit 15B is in somewhat a violation of MUTCD, since it calls for a sign for the next exit, Exit 15A (To MA 1A). Since US 1, however (unmarked along its routing with I-95 north as it is) is leaving the interstate at this point, I guess it takes precedence. The last section of bridge widening work is now starting on north of MA 109 (Exit 16). The entire project is supposed to wrap up in about 3 more years.

Photo Extra--
Some Springfield Meet photos. Here's a view of the Connecticut River and bridge from Springfield's riverfront park:
A view across I-91 of the Springfield cityscape:
And since it wouldn't be a road meet without a sign photo, here's a view of a sign for the MA 83 Exit off of I-91:
I will continue to take photos of newer signs along I-93 (hopefully including the Southeast Expressway section) as they appear.

Comments

Eric Sills said…
Does this mean you will no longer be covering I-73/74 in NC? :-(

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third