Skip to main content

Catching Up: March 2011 ICC Meet

So the last update I did was in March when we went up to Washington DC for the Intercounty Connector Meet.  I blogged about our Stroll along the National Mall, but I never got around to blogging about the meet.  So now nine month later and after the second and much longer section of the highway has opened, I preset an overview of the First ICC Meet.

The entire meet set is located on flickr, here.

Unfortunately, I don't recall the details of the location of the photos, but I figured i would share some of the photo highlights from the soggy Sunday morning.


IMG_3452

IMG_3457

IMG_3466

IMG_3469

InterCounty Connector Construction

IMG_3487

IMG_3491

IMG_3495

IMG_3503

IMG_3506

And of course the group photo:

2011 Spring Washington DC Roadmeet

Comments

Steve A said…
Annnd the Adam Prince pose!

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

Starrucca Viaduct

Even older than the Tunkhannock Viaduct is the Starrucca Viaduct, built in 1848. Located in the far northeastern Pennsylvania borough of Lanesboro, this impressive bridge carried the New York and Erie Railroad over a valley as well as the Starrucca Creek and is currently the oldest stone arch railroad in the Commonwealth of Pennsylvania (1). An engineering marvel of its time, and even in today's world, the 1080 foot length, 100 foot height and 25 foot width (2) of the viaduct is simply spectacular. Using local materials such as Pennsylvania bluestone, the Starrucca Viaduct has stood the test of time.With a price estimated at $325,000 in 1848 dollars, the bridge was one of the largest and costliest stone arch railroad bridges built in America at its time (3) . However, the very material that made it expensive to build gave the Starrucca Viaduct much durabilitycompared to other viaducts built in that era.

I've happened to check out the Starrucca Viaduct on a few occasions sin…