Skip to main content

Shoe Business Mini-Road Trip Report

Hoping not to bring winter back, and hoping spring stays around, I took a trip over to find some new walking shoes for the season. Decided to do a little roadgeeking along the way by checking out progress on the widening of I-93 between MA 24 and its terminus at I-95. Along the way I took a photo of this unique MA (or is it NJ?) sign assembly:
Since this portion of I-93 is to undergo a sign update project soon, thought it may be the last time I may get to take a photo (hey, it's only been up for 10-20 years). This is at the Furnace Brook Parkway (Exit 8) interchange in Quincy. Heading toward the northbound on-ramp is a newer sign:
This sign was put in as a replacement in the past year for the previous North I-93/MA 3 Mass. Green Sign that was knocked down. Though not part of the sign replacement project, can I say it is a 'sign' of things to come(?) as this should be the typical signage at on-ramps along the section of I-93 south of Boston. MA 3 signs may appear on the roadway itself and tacked on to sign supports at major interchanges. Speaking of signs, there is now a new diagrammatic sign for the I-95 interchange on I-93/US 1 South:
Notice the space for a letter next to '1' on the right-side exit tab. Notice also that, unlike the opposite-directions signs along I-95/US 3 in Burlington where there are no control cities listed, and the new signs for I-93/US 1 North the other way that only list Boston, this has two destinations listed, and hopefully no one confused as to why US 1 South goes to Portsmouth, NH. They are preparing two put up more overhead signs between MA 138 and the I-95 South on- ramp. These can be seen heading the opposite direction at the beginning of I-93 North:
Seen in the distance is one of the 2 remaining old overhead sign assemblies between I-95 and MA 24. They are making progress in replacing the other one at the MA 138 interchange:
Meanwhile, the last new sign for Exit 3 Northbound has been put up using the support for the new I-95 sign seen above:
The widening has been completed along this stretch, as can be seen approaching the MA 24 interchange:
Don't know if they plan to replace the next two overheads, the four-lane roadway comes to an end at the exit:
Apparently between the on and off-ramps from MA 24 the road will remain 3 lanes in both directions. The only part of '128' south of I-93 in Woburn that will have not have 4 lanes.

Status of I-93 signing projects: As of last Wednesday, 2/15, the two projects north of Boston were still scheduled to end this July. This despite the contract for I-93 from MA 129 (Exit 38) to the NH border only being 35% complete, and the section south of 129 to MA 28/38 (Exit 29) in Somerville being 50% complete. Both contractors are still pouring the foundations for the new overhead sign supports. The project south of Boston, as seen above, shows little, if any work so far. But, it's only been an 'active' contract for about 6 months. The contractors have until March 2014 to complete the work and it appears they are taking their time. More posts as new signs warrant.

Comments

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…