Took an early Sunday morning trip to check out progress in the last month in completing the first segment of the Triangle Expressway from NC 55 to US 64 now due to open August 1. With the aid of an iced coffee break at Dunkin' Donuts, I actually got to explore further south before the thermometer got to high.

The first part is basically a repeat of last month's journey, so I'll just include any highlights of what's new:
NC 55-The new exit signs that were stored in the median in June have been put up. Here is a comparison of the new (overhead) and old:
The ramps had received what looked like their last layer of pavement. Lane striping and traffic signal work remains to be completed.

McCrimmon Parkway
This view back toward NC 55 shows the addition of lane markings and additional signage in the past month--

 Panther Creek High School is behind the trees to the right. 

 Looking south, similar progress can be seen--



 Three lanes in each direction are marked, there also appears to be a traffic camera set up along the southbound lanes.

Green Hope School Road
Similar progress here, with auxiliary and regulatory signage appearing along with lane markings since the first week of June--
This is a closeup of the Green Hope School Rd bridge over the TriEx. Many people in a TriEx column this week in the Raleigh paper said bridges like this are 'too fancy' especially with the steet name carved into the right abutment. Of course, many of these were the same people saying they would never drive a toll road anyway. Here's the view south from the bridge with similar progress seen in places to the north--
As with the rest of the TriEx, this part is ready for traffic. And has some already...
Heading north on a bathroom break (there was a port-a-potty just south of McCrimmon Parkway)?

Green Level West Interchange
I had not gotten this far south since last October. Needless to say, more changes to report. The work on the bridge has been completed, but most lanes are still blocked off by barrels. Approaching from the west--
Wonder what all is hiding behind the black wrap on the sign post? There will be five lanes on the bridge, the middle for turning. Each ramp has its own traffic signal.
The signals are turned on their side, I assume this will not be the configuration when the ramps open. Here's a narrow view looking south to make sure you can spot a NC 540 mile marker--
In an unremarkable coincidence, the number on the mile marker, 62, matches the future exit number for the Green Level West interchange. A wider view looking south--
In addition to lane markings, there are lights put up in the areas surrounding the interchange ramps. Speaking of, this is interesting--
Notice how much of a sharp turn is need for traffic leaving NC 540, and the 25 MPH recommended speed. Was it too expensive to place the on-ramp before the bridge? Can't say they're overspending on this design. Here's a wider view to the north looking back toward Green Hope School Rd and the USA Baseball complex on the left--
Fortunately, the northbound on-ramp only requires a standard left or right turn--
Though you may notice the signs indicating the roadway rapidly goes from five lanes to two just beyond the bridge. Future congestion point?

The US 64 Interchange
Since I last visited in October they completed the paving and most of the landscape work around the TriEx/US 64 and Kelly Road interchanges. Here's the view approaching US 64 on NC 540 from the Jencks Road bridge (it had been complete in August but lack of landscaping made it hard to stop for photos)--
A closeup of the future off-ramp helps reveal the exit numbers for the US 64 interchange, 59A/B--
Mile marker 60 can be seen on the right. Still need to post the toll rates. Here's the view looking back toward Green Level West--
Note the equipment needed for more landscaping work, but a complete Toll North NC 540 sign assembly on the right. The scene approaching the interchange on US 64 West looks like this--
Again the overhead signs are up, but covered, unlike other exits on US 64 west of Raleigh, these (for the TriEx and Kelly Road) have no exit numbers. A closeup of the 'fancy' TriEx bridge over US 64--
The bridge to carry Kelly Road over US 64 is not complete, here's a view of the current construction looking north--

Apex Barbecue Road
I managed to get down to view construction progress of the next section (US 64 to NC 55 in Holly Springs) at Apex Barbecue Road. A new bridge has recently been opened. You can tell in this view north of the bridge where they were able to grade the TriEx roadbed before the bridge was completed--
This is one of the few places where they are constructing noise barriers. This is Apex, not Cary. A view to the south--
Again, you can see where they only recently began to grade the roadbed after the bridge was open. The next exit south is for Old US 1, but the road is still closed, and I didn't feel like walking a long way in the heat. The final shot then was of the new Apex Barbecue Rd bridge and new traffic signals at the Kelly/Apex Barbecue intersection--
Hopefully, aided by the open TriEx north of US 64, I will be able to get to places further south toward Holly Springs in early August.

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

Independence Boulevard - Charlotte's First Urban Highway

Today, the major pieces of Charlotte's highway network include the Outerbelt (I-485), Interstates 77 and 85, and the Brookshire and Belk Freeways (I-277), but nearly sixty years ago Charlotte's first major urban highway project would begin.  The construction of Independence Boulevard in the 1940s and early 1950s would give Charlotte and North Carolina its first urban expressway, and would usher in a new era of highway building throughout the state.
With the help of former mayor, Ben Douglas - who sat on the State Highway Commission in the 1940s - the push for building Independence Blvd. began.  In 1946, city residents passed a $200,000 bond issue that would go along with over $2 million in federal funding.  The highway would open in two stages in 1949 and 1950.  When a grade separated interchange was built at South Blvd. and Morehead St. in the mid 1950s, Independence Blvd. was completed. (1)  Although the highway was not a fully controlled access highway, it gave motorists an …

The Bigelow Blvd. / Crosstown Expressway (Interstate 579) Ghost Ramp Mystery Explained

For nearly five decades, many Pittbsurgh-area motorists, when leaving the old Civic Arena or exiting off the Crosstown Expressway onto Bigelow Boulevard, have wondered what exactly the ghost ramp in the above photo was for.  Where was it to have come from?  When and why did they stop?  Will it ever be built?
The original plans for the Crosstown Expressway included a full interchange with Bigelow Boulevard.  However, these plans never came to fruition.  The only ramps that were built were from I-579 North onto to the Bigelow and from Bigelow Boulevard/PA 380 West to I-579 South.  The above ramp was to have come from I-579 South, and depending on what older map of Pittsburgh you have over or under the existing roadway, and on to Bigelow/PA 380 East.  It never came to be, and the HOV ramp to what was once the Civic Arena has basically eliminated the need for completing this interchange.


The two photos above show the retaining wall with the ghost ramp and how it would have connected onto…