I-95 Signage Update and More

I took a road trip on Saturday (10/26) to attend the Fall Meeting of the New England Archivists professional association being held at Amherst College. The trip took me along the lower half of the '128 Belt' (I-93 and I-95) from Braintree to the Mass Pike West to I-91in Springfield and north from there to MA 9 to Amherst. I took the opportunity to make note, and take some photos, on progress of signage projects I saw along the way.

A. I-93 Braintree to Randolph
No progress here, little done in the last month. Hopefully work done on the SE Expressway stretch, but did not have time to check that area. The only thing going on was pavement work, fortunately, on I-93/US 1 North which closed down 2 lanes and backed up traffic in the morning back to I-95 (and was still going on when I returned that night, unfortunately).

B. I-95 Add-A-Lane Project, Dedham to Needham
No signage changes along the active construction zone northbound, but work has progressed near the MA 109 interchange as seen below:
Work has largely been completed adding the extra lane up to the bridge area. The new support spans for the future bridge are up, and work is progressing on the bridge deck:
Further toward Great Plain Avenue cement barriers still block the construction zones from I-95 North traffic:
Work on the new bridge for Great Plain Avenue has been completed as has the new deck for the Southbound MA 135 bridge, the previous split traffic zone that direction has been removed but can't be seen beyond the barrier on the left--

C. I-95 Signage Project Newton to Lexington
Work has progressed much faster on the I-95 signage project between MA 9 and MA 4/225 than on I-93. There are several new signs already up between Route 9 and the Mass Pike. This is the first new sign, a 1 mile advance for the MA 16 exit:
This is currently the only new sign up for this exit in either direction. There are a couple new signs up for the next exit, Grove Street:
Both this 1 mile advance sign and the other new one below, are missing the MBTA Station text that was listed on the previous signs--
 I assume that information will be placed on a ground-mounted auxiliary sign that has not been put up yet. Also the photo above has one of the newish portable VMS signs stating the time to I-495 via I-90. Speaking of the latter, here's the new sign approaching the I-90/Recreation Rd/MA 30 Exit, neither of the advance signs for this exit have been updated--
This sign has several new features not found in the old signs, a Mass Pike Logo instead of text, a yellow Toll Road banner, and a line separating MA 30 from I-90. No note about Recreation Rd, same as the old sign. The logo replaces the text 'Mass Pike' and would be easier to take down should the turnpike ever become toll free. The sign was designed before MassDOT decided to make this an ExiOnly Lane to help traffic merging from I-90 on the other side of the interchange. I assume an exit only banner will be added in the future. For now there are a couple portable VMS signs warning of the lane ending.
There was also new signage along the exit ramp, here at the merge of the two exit ramp--
The overhead signs further down the ramp had not been changed, not the signs at the ramp for the MA 30 exit:
 The only change was at the end of the ramp where there is now only 3 lanes of I-95 North traffic and a sign notifying drivers at the on-ramp they do not have to yield to oncoming traffic. 

I took a quick detour up to US 20 to look at other new signage that had been spotted recently. There are several new ground-mounted auxiliary signs both north and southbound. Here's one for MA 117 ahead of the US 20 exit:
This replaced a simple trailblazer saying To MA 117, as for the exit itself only the last sign northbound has been replaced:
There were also several new ground-mounted BGSs for I-95 north and south on US 20. 

Here's a new auxiliary sign for the Mass Pike exit on I-95 South:
Indicating those wanting to go to Worcester should take I-90 West. Probably better than taking MA 9 all the way to Amherst. I also spotted new on-ramp signage for the Mass Pike exit from MA 30, but did not have time to take the photos.

D. Other Road Trip photos
The rest of the photos are random shots I took on the way to Amherst and on the Amherst College campus:
Here's the signage at the split of the ramp to I-91 from I-90 Mass Pike, Exit 4:
There's currently a construction project going on along I-91 from this exit northward fixing the interstate bridges. Once I got to Amherst I followed MA 9 after it split off from MA 116 South:
Before the conference I wandered around the college campus and surrounding area. There was a Farmer's Market going on that morning:
I looked around for possible healthy lunch options but would have had to have made my own chicken or lamb sandwich, so I went to Subway which was across the street. Here's a couple older buildings on the Amherst campus:

These may have been built as dorms but now house administrative offices. Here's the place where the NEA Meeting took place:
Valentine Hall, not named, I assume for the ex-Red Sox manager. Lastly, here's the sign I saw when leaving campus later that afternoon:
I continued straight on MA 9 reversing course back to the Boston area. I did notice one Route 9 circle sign heading back, but did not get a photo. I also took I-291 heading back to the Mass Pike. It appears the signage project there is complete. The one oddity is that there's a 'Begin I-291' sign heading east just before a new East I-291 Mile 1 sign. 

Other then being held up about 25 minutes by the I-93 paving project nothing notable to report on the way back. Several I-93 drivers thought they could shave some minutes off their wait by using the Exit 3 Houghton's Pond off-ramp and then getting back on I-93. They found out, including one Cadillac with NY plates that crossed all 4 lanes of bumper-to-bumper traffic to get off, that the on-ramp was closed and they either had to reverse direction or navigate through the Blue Hills Reservation to Braintree in the dark. 

E. I-93 Signage Plans
Hopefully, I'll have something to report on the I-93 signage project soon. For now, I post a few of the signage plans I got from MassDOT:
The above is for the Braintree Split Northbound. Notice the use of MA 3 North trailblazers instead of having the additional shield on the sign. 

Here are the signs for the same Exit 7 on I-93 South--
The Left Exit signage is now outdated even before it has been put up since MassDOT changed the lane configuration on October 24 so that MA 3 only has 2 lanes, not 3 at the split. This was done according to the press release to solve safety issues caused by late drivers trying to access I-93 South coming from the HOV lanes trying to cross 3 lanes of traffic.

Here's an excerpt for signage at Exit 11, Granite Avenue. Notice the use of trailblazers for MA 3 here too in addition to the already posted I-93/US 1 guide or paddle signs--
The reassurance assemblies will have all 3 routes mounted on one post, similar to those put up for I-93/US 1 between Randolph and I-95. I have all 59 plan images and can post more if requested.

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

Independence Boulevard - Charlotte's First Urban Highway

Today, the major pieces of Charlotte's highway network include the Outerbelt (I-485), Interstates 77 and 85, and the Brookshire and Belk Freeways (I-277), but nearly sixty years ago Charlotte's first major urban highway project would begin.  The construction of Independence Boulevard in the 1940s and early 1950s would give Charlotte and North Carolina its first urban expressway, and would usher in a new era of highway building throughout the state.
With the help of former mayor, Ben Douglas - who sat on the State Highway Commission in the 1940s - the push for building Independence Blvd. began.  In 1946, city residents passed a $200,000 bond issue that would go along with over $2 million in federal funding.  The highway would open in two stages in 1949 and 1950.  When a grade separated interchange was built at South Blvd. and Morehead St. in the mid 1950s, Independence Blvd. was completed. (1)  Although the highway was not a fully controlled access highway, it gave motorists an …

The Bigelow Blvd. / Crosstown Expressway (Interstate 579) Ghost Ramp Mystery Explained

For nearly five decades, many Pittbsurgh-area motorists, when leaving the old Civic Arena or exiting off the Crosstown Expressway onto Bigelow Boulevard, have wondered what exactly the ghost ramp in the above photo was for.  Where was it to have come from?  When and why did they stop?  Will it ever be built?
The original plans for the Crosstown Expressway included a full interchange with Bigelow Boulevard.  However, these plans never came to fruition.  The only ramps that were built were from I-579 North onto to the Bigelow and from Bigelow Boulevard/PA 380 West to I-579 South.  The above ramp was to have come from I-579 South, and depending on what older map of Pittsburgh you have over or under the existing roadway, and on to Bigelow/PA 380 East.  It never came to be, and the HOV ramp to what was once the Civic Arena has basically eliminated the need for completing this interchange.


The two photos above show the retaining wall with the ghost ramp and how it would have connected onto…