Massachusetts Joins the Mile Post Club

On September 12, 2015 MassDOT posted an advertisement calling for bids on a contract (Project No. 608024) that will convert the state's interstates an other US and State Route expressways to the Geographic Reference Location or Milepost Exit Numbering System starting in 2016. The winning bidder is to be chosen on November 17, 2015. This ends a process started with the 2009 Massachusetts Supplement to the federal MUTCD, section 2E.31 stating: "Massachusetts will be changing all its interchange exit signs statewide to the reference location numbering system, with the entire state highway system to be converted to the new numbers over the next five to ten years." According to a MassDOT source, a chief sign engineer, however, when the state approached the FHWA about funding an ongoing conversion project, they insisted the only way Massachusetts could get 90% federal funding was if they did the project all at once, in what is termed a blanket contract. According to the same source, the project will start in the western part of the state and move east. Short routes like I-84 and I-385 probably being the first to receive the new numbers.

 

When MassDOT committed to the blanket contract for changing the numbers all at once, they already had two projects in the works to update the signage along I-90, the Massachusetts Turnpike, from the NY border to Exit 20 in Allston/Brighton. They decided to change the numbers along I-90 under these two contracts instead. The first project, that will change the numbers from the border east to I-290/I-395 in Auburn was let on August 18. The eastern project is to be advertised on October 31 and will probably be let in December (the remaining signs east of Allston-Brighton date from the extension of I-90 to East Boston in the 1990s and the numbers will be changed under the blanket contract).

 

I was able to get a copy of the signage plans for the western part of I-90 with the new exit numbers. Heading west to east, the first (currently 1) will become 3:


And the final exit under the contract, now 10, will become 90:

 
The most frequently jammed exit, at least westbound, at Sturbridge, now 9, will become 78:

This exit will be the only one to feature diagrammatic signing heading westbound:


US 20, that was formerly on the Exit 9 signage, will be relegated to a ground-level auxiliary sign:

All the I-90 signs on the Turnpike and Ramp will also feature the Mass Pike Logo:


And a Toll Banner at Turnpike Entrances:

For a complete listing of the new exit numbers for the Mass Pike, go to the Future I-90 Mass Pike Exit List. To see more signing plans, go to the I-90 Sign Plans Gallery.

With Massachusetts converting to milepost based numbering, and Connecticut starting to convert with a project currently going on along I-395 (for a gallery of the new signs already put up, visit this Flickr Site). This only leaves three New England states (NH, RI and VT) plus New York (and Interstates in Delaware) as the only remaining consecutive exit number states. With federal mandates calling for a switch, it probably will only be a short time before these states change as well.

In addition to my I-90 list, feel free also to check out my lists covering probable future exit numbers for all of Massachusetts's Interstates and State Route Expressways.

Comments

Bob Malme said…
Update:
On November 28, MassDOT placed an advertisement for bidders for the next Mass Pike signing project from Millbury to Boston (Current Exits 10A to 20). The winning bidder is to be announced on February 2, 2016. Work is to start later in the spring.
Bob Malme said…
An update to the I-90 signs gallery link. The gallery has moved to its own site:
http://www.gribblenation.net/mass21/i90photos.html

Popular posts from this blog

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

2017 Midwest Vacation - St. Louis Roads and Busch Stadium

During our two days in St. Louis, much of our driving would take placeon Missouri Route 364, Interstate 270, 170, 64 and Page Avenue (County Route D).    For photos from the road in St. Louis, head here on flickr.

Missouri 364:

Maggie's cousins live off of Missouri 364 so we were on this road the most.  Though, our exposure was of the highway from Harvester Road east to Interstate 270, I was impressed at what I saw of the route.
From what I saw, Missouri 364 certainly appears to be Interstate standard, and there seems to be some inclination that it will or can become Interstate 364 whenever MODOT petitions for it.  The MO 364 freeway was built over three phases from the early-2000s to 2014.  The route runs just over 21 miles from Interstate 64 in Lake St. Louis to Interstate 270 in Maryland Heights. East of I-270, it continues as Page Avenue.


Page Avenue (County Road D):

Missouri 364 continues east towards Interstate 170 and eventually St. Louis as Page Avenue/County Road D.  Just e…

2017 Midwest Vacation Road Trip - Day 1 - Raleigh to Lexington

Our family vacation this year was a week long roadtrip adventure from Raleigh to St. Louis to Pittsburgh with stops in Lexington, Louisville, and Indianapolis planned.  Day 1 saw us go from Raleigh to Lexington, Kentucky with an unplanned stop and detour.  More on that in a moment.

Route: US 64 (I-495, I-87), I-440, I-40, Business I-40, US 52, I-74, I-77, Charleston city streets, I-64, WV 25, US 60, WV 817, I-64, I-75, then double back to KY 922 and KY 4.

Counties gained: 5 (Carter, Rowan, Bath, Montgomery & Clark - All in Kentucky)

For the entire flickr set from the roadtrip please head here and here for the Kentucky Horse Farm set.

When you have two kids and are about to head out a long day of driving you sometimes have to figure out when you wish to leave.  Every family is different, but for our family we try to leave between three and five in the morning.  The reason - the boys will both still be sleeping and we can at least get two to four (if we are lucky) hours of driving i…