Skip to main content

My prediction on the numbers for the two new North Carolina Interstate Corridors


Could these be the next two Interstates in North Carolina?

It seems more than likely that NCDOT is going to petition AASHTO to approve the formal numeric numeration for the two new interstate corridors that were included in the FAST ACT.   The two corridors are US 64 from Raleigh to Williamston then continuing north on US 17 to Hampton, VA.  The other follows US 70 from Interstate 40 near Clayton eastwards to Morehead City.

NCDOT is most likely going to submit an application for both routes this April for the AASHTO meeting this coming May.  Here are my predictions for the number of each route.

US 70 Corridor - We know that NCDOT is planning to petition for a number between 40 and 60.  Obviously, 40 is already taken, and there is an Interstate 44 already in place running from St. Louis to Wichita Falls, TX.  42 is possible - however - there are a few of the opinion that since NC 42 intersects with the proposed Interstate this number is out.  Though, this hasn't stopped NC 73 from intersecting with I-73, I think NCDOT will pass on 42 because of NC 42's close proximity.  My guess is Interstate 46.  NC 46 runs near the state line and can be renumbered if the state chooses.  AASHTO and or the FHWA may throw a curveball and suggest a three digit branch of Interstate 40.  If that is the case, and because I am going to hedge by bet here - I'll say that this suggestion with be Interstate 340 because the connection to 40 lies between 140 in Wilmington and 540 in Raleigh.

US 64/US 17 Corridor - This is slightly more difficult.  The local business coalition that pushed for an Interstate designation along this corridor has always branded this as Interstate 44.  However, they concede that Interstate 44 may not be the right number for the route.  There seems to be an overall consensus of opinion for Interstate 50.  Plus, the western end of this corridor - from I-95 in Rocky Mount west to I-440 in Raleigh - already has an Interstate designation, Interstate 495.  So what will NCDOT do? Scratch 495 and have a two digit number for the entire corridor?   Keep 495 and begin the new route at Interstate 95 in Rocky Mount?

My guess - Interstate 50.  Yes, US 50 goes through Virginia but it is nowhere in the vicinity of the Tidewater Region.  If that is of a concern - Interstate 54 would be my next choice.  I also believe that if a two digit Interstate is approved that the allowed signage for the new route will go beyond Interstate 495's current end at I-540 in Knightdale.  They will allow the route to be signed to the US 64 Business Exit in Wendell (Exit 429).

Of course, I'm most likely wrong.  Feel free to make your own predictions in the comments below.

Interstate shields courtesy of David Kendrick's Shields Up!

Comments

In a state which has no problem with an I-74/US-74 concurrency, I doubt that other route numbers in conflict will be an issue. Personally, I don't see a need for new route numbers of any variety, but that's not the "cool and trendy" way to approach this.
Bob Malme said…
Good choices for the predictions. I too agree that the US 70 one will be an I-4x and the US 64 an I-5x. As for I-50, the Regional Transportation Alliance (the organization pushing for the US 64 I-route) in a blog post last updated on Feb. 9 (available at: http://letsgetmoving.org/rta-blog/raleigh-norfolk-495-44-50-89-56/) sees potential problems with I-50 due to the existence of NC 50 which also intersects I-95. Their preferred I-5x route is I-56.
In a state which has no problem with an I-74/US-74 concurrency, I doubt that other route numbers in conflict will be an issue. Personally, I don't see a need for new route numbers of any variety, but that's not the "cool and trendy" way to approach this.
Kristin Rollins said…
Living in southeastern Virginia, I don't think Virginia's route numbering matters, because I fail to see where the political will will come from to foot the bill for any portion of this Interstate. Southeastern Virginia has many higher-priority projects for which funding has not yet been found, especially regarding a number of urban bridge and tunnel crossings. While I love the route (and the US 17/US 64 route is our favored route to get to I-95 southbound from Hampton Roads), I do not see the value of upgrading the portion north of the VA/NC state line, and I do not see circumstances where it is likely to become valuable enough to be worth the cost to taxpayers and governments here.

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …