Skip to main content

Trump's Top Infrastructure Projects potentially leaked?

The Kansas City Star & McClatchy News Bureau today published a story that Trump's team has compiled a list of 50 top infrastructure projects at a cost of at least $137.5 billion.  The projects would be private and public investments.  The article states that it is not known if the list is final or a draft.

http://www.star-telegram.com/news/politics-government/article128492614.html

The list includes:
  • Numerous lock & dam replacement/repair projects
  • The Atlantic Coast Pipeline (natural gas)
  • What seems to be the widening all of 95 in North Carolina
  • Replacement of 15 bridges along I-95 in Philadelphia
  • The I-71/75 Brent Spence Bridge
  • High Speed rail from Dallas to Houston
  • A few projects in Detroit
  • The Purple Light Rail Line in Metro DC
  • And more

The list of projects and some details can be found here:

https://www.documentcloud.org/documents/3409546-Emergency-NatSec50Projects-121416-1-Reduced.html

Commentary:
First thought, hey a subject I can follow and regularly on the blog. For the most part, this is a very diverse and interesting list including transit, highway, water, air and electric.  The amount of projects devoted to locks and dams surprised me - but a number are close to a century old.

I'm going to be specific to the projects that I am that rather familiar with - Interstate 95 in North Carolina, the Atlantic Coast Pipeline, and the Chaleroi, PA lock and dam.

I was actually surprised to see the improvements to I-95 in NC included on this list.  Although this is a much needed project, this would most likely be toll and we've been down that road before.  Nonetheless, sooner or later something is going to need to be done with I-95 and most likely it will be tolled.  If anything moves on this, we'll be on top of it.

The Atlantic Coast Pipeline is a natural gas pipeline from the shale gas fields of West Virginia to Eastern NC and Tidewater Virginia.  I will be interesting to see if this will see protests similar to whats going on in the Dakotas.

The Lock and Dam project in Chaleroi, PA isn't far from where I grew up.  The Mon (Monongahela) River Locks are very old and are in need for replacement/upgrades.  I wonder if the project will include the removal of the Elizabeth Lock and Dam.

Comments

Doug said…
It looks like the Peace Bridge was mentioned in the article as well. I'd like to find out more about what the plans for the bridge are as more information is released.

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …