Skip to main content

Roebling Aqueduct

In a quiet and often overlooked corner of Northeastern Pennsylvania, the country's oldest surviving suspension bridge crosses the Delaware River into New York.  The Delaware Aqueduct, designed and built by famed engineer John A. Roebling, has withstood a very colorful history from being an important piece in the region's transportation, to uncertainty during the growth of rail, nearly eight decades of neglect and poor management as a private toll bridge, to finally being restored by the National Park Service and in use as an automobile bridge today.

Construction and Canal Era (1847-1898):
During the 1840's, the Delaware & Hudson Canal was looking at ways to speed up service along its route.  One of the major bottlenecks was where the canal reached the Delaware River.  Since it began operation in 1828, the D&H used a rope ferry to pull traffic along to Canal across the Delaware.  The conflicting traffic of vessels going down the Delaware to Trenton or Philadelphia and of the coal freight cutting across the river on the canal created great bottlenecks.  That is in addition to the difficulty ferry operators would have fighting the powerful current. 

 
In 1847, the D&H commissioned John A. Roebling to construct a suspension bridge that would carry canal traffic above the Delaware.  In comparison to then-contemporary designs, Roebling's suspension design allowed for more room for downriver traffic and the dangerous ice floes to pass through.   Two years later on April 26, 1849 at a cost of  $41,750, Roebling's Delaware Aqueduct opened to canal traffic.  Soon thereafter, a sister suspension aqueduct, the Lackawaxen, was opened nearby at a cost of $18,650. (1)  The two bridges' impact were immediate and impressive as canal traffic was shortened by one full day.  The D&H was so impressed by the success and the bottom-line impact of the two bridges that they commissioned Roebling to design and construct another two.  Two years later, Roebling finished the construction of the Neversink and High Falls Aqueducts in New York.

Eight Decades of Neglect (1901-1980):
As railroads grew throughout the country, the need for canal traffic drastically declined.  In 1898, the D&H ceased operations.  Three of the four aqueducts, Neversink, High Falls, and Lackawaxen, were dismantled.  The Delaware, which still had a great deal of practical purpose as it crossed a major river, was sold to a private owner.  The owner, Charles Spurks, used the now dry aqueduct to haul logs for his lumber company across the bridge.  He built a toll house on the New York side of the river charging a toll to all others on the crossing. 
 
The bridge would change hands several times during the next 70-plus years.  As ownership changed, the condition of the bridge deteriorated.  The towpaths were dismantled, replaced by a handrail.  In 1933, the trunk of the bridge burned away completely.  Only the bridge deck was replaced, the walls of the aqueduct were not replaced.  A near tragedy occurred in 1977, when a truck fell through the bridge.  A lawsuit was filed against the then owners, but the bridge was only closed temporarily.  The condition of the bridge deck was so bad that one member of the park service said, "All one had to do was hop up and down on one end, and I could see a ripple running all the way from Pennsylvania to New York." (2) In 1980, the National Park Service bought the bridge and closed the structure in the hope to restore it. 

Restoration and Revival (1980-present):
Once the National Park Service owned the aqueduct, discussions and planning began on how to restore the bridge.  Before the bridge was under the Park Service control, the bridge was deemed in 1968 to be a National Historic Landmark.  In 1983, testing began on the strength of the bridge, and amazingly Roebling's original provisions easily met modern standards.  With most of the original superstructure intact, restoration began in 1985.  The restoration of the superstructure's base to Roebling's original specification was complete in 1986.  In 1995, the aqueduct walls, towpaths, and wooden icebreakers at the base of the piers were completed.

 
Today, the bridge is again open to vehicular traffic, without tolls.  It is a one lane bridge, and the former towpaths serve as sidewalks.  The toll house on the New York side remains and now serves as a history center detailing the history of the aqueduct, the D&H Canal, along with the restoration process.  With all original features of the bridge restored, crossing the bridge is like going back in time; the only difference, you don't need a boat to cross it.

Looking across the aqueduct into New York.  150 years ago, you would be underwater here.
From the towpath, more of the suspension superstructure.
The workings of the suspension superstructure is shown through glass partitions.
Looking downstream at the Delaware Aqueduct from the Pennsylvania shore of the Delaware.

Sources & Links:

  • (1) McCann, Brian.  "John Roebling and the Delaware Aqueduct." Pocono Lake Region Realtor. (April 1, 2007)
  • (2) Cobb, Emma. "Roebling's Bridge of Water."  Invention & Technology Magazine.  Vol. 2, Issue 1. Summer 1986.  Hosted by: americanheritage.com (April 1, 2007)
  • Roebling's Delaware Aqueduct ---National Park Service
  • Roebling's Delaware Aqueduct ---Bridgemeister.com
  • Comments

    Popular posts from this blog

    The New PA 48 - The Unbuilt Eastern Allegheny County Freeway

    From the 1950's to the 1980's, there was a proposal to build a 4-lane expressway paralleling PA Route 48.  This proposed highway was officially known as the "North-South Parkway", but locally known as the "New 48".  Sadly, this route never came to be; however, it is the predecessor of another highway, The Mon-Fayette Expressway.  The "New 48" was a highly debated route that really never got beyond the planning stages.  There are very few remnants of construction left.

    History:
    Originally proposed in the post-war Pittsburgh, the "New 48" was a lot of talk, but it really never saw much work done.  Most of the discussion, planning, land acquisitions and right-of-way clearing occurred in the 1960s.  The "New 48" would also have gone by the term "North-South Parkway".  This was the term for the highway used in White Oak: A Master Plan done by the Pittsburgh Regional Planning Commission in 1960. (1)

    The early 60s would see muc…

    Hunting for forgotten history; Old US 99 in Fresno

    Coming back from my Great Lakes Trip the other day I encountered this sign goof at Fresno-Yosemite International Airport which incorrectly displays US Route 99.





    That little US 99 sign was the inspiration I needed to start tracking all the former alignments through the City of Fresno.  Fresno in general has had a huge shift in highway layouts over the decades which is something I intend to finish with California 41 and 180 perhaps later this month.  Based off my research I came with the following three maps progressing northward through Fresno showing every iteration of US 99 before it was downgraded to a State Highway in 1967.




    Essentially the route alignment history of US Route 99 in Fresno is as follows.

    1926-1930 Alignment 

    Progressing northward into Fresno US Route 99 would have followed:

    Railroad Avenue
    -  Cherry Avenue
    -  Broadway Street
    -  Divisadero Street
    -  H Street
    -  Belmont Avenue
    -  Golden State Avenue

    1930-1934 Realignment off of Railroad Avenue

    Sometime between 1930 to …

    The William Flinn (not Flynn) Highway - Pittsburgh's Misspelled Street

    For decades if you traveled along PA Route 8 in Pittsburgh's North Hills suburbs, you would have noticed signs that read "William Flynn Highway" at every intersection.  Even today, many businesses and residences have their addresses listed as XXXX William Flynn Highway.  However, it's not William Flynn Highway, it is William FLINN Highway - and the gentleman who it is named for has a long and storied past in Pittsburgh's infrastructure history.

    William Flinn was born in England in 1851; however later that year, his family emigrated to the United States and would settle in Pittsburgh.  A 10 year-old school drop out, Flinn grew interested in politics and would join the Allegheny County Republican Party in 1877 as a ward commissioner and a seat on the Board of Fire Commissioners.  Flinn would serve in the Pennsylvania State House of Representatives and Senate from 1877 to 1902. (1)

    Flinn along with James J. Booth would found the Booth and Flinn construction firm in …