Skip to main content

Future Interstate 587 now signed in North Carolina

 Future Interstate 587 signs are now posted along US 264 in Eastern North Carolina.  The freeway segment of US 264 from Zebulon to Greenville will be designated as Interstate 587 once the entire route is built to interstate standards.   The new signs were first posted on April 12, 2017. 

Comments

Where did AASHTO get the idea that 587 would be a good number?

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

Independence Boulevard - Charlotte's First Urban Highway

Today, the major pieces of Charlotte's highway network include the Outerbelt (I-485), Interstates 77 and 85, and the Brookshire and Belk Freeways (I-277), but nearly sixty years ago Charlotte's first major urban highway project would begin.  The construction of Independence Boulevard in the 1940s and early 1950s would give Charlotte and North Carolina its first urban expressway, and would usher in a new era of highway building throughout the state.
With the help of former mayor, Ben Douglas - who sat on the State Highway Commission in the 1940s - the push for building Independence Blvd. began.  In 1946, city residents passed a $200,000 bond issue that would go along with over $2 million in federal funding.  The highway would open in two stages in 1949 and 1950.  When a grade separated interchange was built at South Blvd. and Morehead St. in the mid 1950s, Independence Blvd. was completed. (1)  Although the highway was not a fully controlled access highway, it gave motorists an …

The Bigelow Blvd. / Crosstown Expressway (Interstate 579) Ghost Ramp Mystery Explained

For nearly five decades, many Pittbsurgh-area motorists, when leaving the old Civic Arena or exiting off the Crosstown Expressway onto Bigelow Boulevard, have wondered what exactly the ghost ramp in the above photo was for.  Where was it to have come from?  When and why did they stop?  Will it ever be built?
The original plans for the Crosstown Expressway included a full interchange with Bigelow Boulevard.  However, these plans never came to fruition.  The only ramps that were built were from I-579 North onto to the Bigelow and from Bigelow Boulevard/PA 380 West to I-579 South.  The above ramp was to have come from I-579 South, and depending on what older map of Pittsburgh you have over or under the existing roadway, and on to Bigelow/PA 380 East.  It never came to be, and the HOV ramp to what was once the Civic Arena has basically eliminated the need for completing this interchange.


The two photos above show the retaining wall with the ghost ramp and how it would have connected onto…