The story behind the ghost ramps around Pittsburgh International Airport

The roads around Pittsburgh International Airport have a lot of history and intrigue.  The growth of the airport and resulting land acquisitions has changed the routing of many roads in Western Allegheny County.  As the airport grew and traffic around the airport increased, the need for new roads would also change the landscape.  Of course, the fact that this is Pittsburgh means there were also plans for highways that never came to be.  Two of these never built highway plans, the Beaver Valley Expressway (BVE) extension and the full-speed connection to the Southern Expressway at Flaugherty Run Road have traces - specifically ghost ramps - of highways that never came to be.

Beaver Valley Expressway Extension:

Pavement stubs for a never built extension of the Beaver Valley Expressway that would have bypassed the Greater Pittsburgh International Airport terminal.  (Adam Prince - October 1998)
For close to three decades this unused piece of roadway along the southern end of Beaver Valley Expressway puzzled Pittsburgh area travelers.  Located near the current-day maintenance hangers for Pittsburgh International Airport, this concrete stub of a highway was supposed to be the start of a bypass of the then highly congested terminal entrance at the intersection of the Airport Parkway and Beers School Road.  This freeway bypass was to be a continuation of the Beaver Valley Expressway which would tie back into the Airport Parkway near the current Thorn Run Road interchange.

Aerial photo of the Greater Pittsburgh Airport area in 1967.  The Airport Parkway comes to an abrupt end at the entrance to the terminal at Beers School Road.  Construction for the Beaver Valley Expressway to the north and west of here had not started yet.  (Penn Pilot)
The need for this bypass was the continued growth of what was then Greater Pittsburgh International Airport.  The Airport Parkway was constructed in the 1950s as part of the Penn-Lincoln Parkway project.  The Monroeville to Airport east-west link allowed for direct connection from the new airport to downtown.  The Airport Parkway ended in grand fashion at the entrance to the airport's main terminal at the intersection of Beers School (now University Blvd.) and Hookstown Grade (now Stevenson Mill) Roads.  

Construction of the Beaver Valley Expressway, which would eventually run from Sharon/New Castle through Beaver County to the airport, would begin near the airport in the late 60s and open by 1972. (1)  By then the congestion around the airport terminal had become an issue.  With new thru-traffic volumes to be added as a result of the new freeway, plans were made to extend the BVE as a bypass of the terminal and connect with the Airport Parkway just south of the terminal.  While the plans for the expressway's extension were being made, a temporary four lane connection from the Flaugherty Run Road to Beers School Road was constructed. 

The routing of the proposed bypass was to basically parallel the existing Airport Parkway and temporary connection to the North.  According to Bruce Harper the expressway would have the following routing (2):
As planned, the Expressway would have left the Parkway West somewhere in the vicinity of Montour Heights Country Club (now the Cherrington office park), just south of the current Thorn Run interchange.  The new road would have been to the north of the (now vacant) parking lots across the Parkway from the airport terminal (through the area now populated by the office park and Royce Hotel).  It would have come up
through Port Vue Drive and hit Beers School Road where the adult book shop is, just down from the USAir Credit Union.  It would have continued west (today this is the location of the Port Authority Park and Ride Lot), skirting behind Rosemont Estates (the subdivision behind the car wash) and tying in with the new Expressway just beyond the cargo buildings.
Though some property was acquired, the extension and terminal bypass was never built. (2)  The need for a terminal bypass became moot in the late 1980s when construction for the airport's new Landside Terminal and direct access from the Southern Expressway (PA 60 now I-376) began.  The new highway and terminal began operation in 1992.  The concrete ghost stubs for the Beaver Valley Expressway extension would be removed with the construction of the International Drive interchange in 2003. 

By 2003, this was all that was left of the Expressway's extension ghost stubs. (Denny Pine)

Flaugherty Run Road High Speed Interchange Stubs:

The Flaugherty Run Road interchange sits not that far north of the Beaver Valley Expressway Extension stub.  The diamond interchange was opened in the early 1970s when the Beaver Valley Expressway made its way towards the airport.  When the Southern Expressway was built in the early 1990s, a half-interchange connection between the two freeways was built just to the north.  This connection did not allow northbound traffic along the BVE to make a "U-Turn" so to speak onto the Southern Expressway or northbound PA 60 traffic to exit for access to the cargo and maintenance areas along the Beaver Valley.  Initial plans were to built a high-speed freeway to freeway access utilizing some of the ramps from the Flaugherty Run Road interchange. In addition, Flaughery Run Road traffic would have access to/from the Southern Expressway. 

Ghost ramp stub for the unbuilt high-speed connection between the Beaver Valley Expressway and Southern Expressway. (Adam Prince - December 2003)
At the time, it was determined that the high-speed connection was not necessary and that the access ramps to/from Flaugherty Run Road would serve as the connection between the two freeways.  Grading work and some of the ramps were built along with a wide median that would allow for the construction of the bridges that would carry the higher speed ramps.  At this time, there are no plans to build the high-speed ramps as it is not viewed as necessary.

Ghost ramp stub for the unbuilt high-speed connection between the Beaver Valley Expressway and Southern Expressway. (Adam Prince - December 2003)
Sources & Links:

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …