Authorized for construction as part of the 1928 Allegheny County Bond Issue, Allegheny River Boulevard runs from Washington Blvd. in the Highland Park neighborhood of the City of Pittsburgh to Hulton Road in the suburb of Oakmont.  When opened in 1934, the roadway was Pittsburgh's first link between the city and the suburbs to the north and east.  However, unlike her sister highways; Ohio River Boulevard to the west, Saw Mill Run Boulevard to the south, and Moss Side Boulevard on the eastern edge of the county, Allegheny River Boulevard would be the last to open after a nearly three year struggle over what amounted to basically 1300 feet of highway.
 
The 1928 bond issue allocated over $3.5 million for construction of the four and one half mile roadway from Washington Boulevard in Highland Park to Wildwood Avenue in Verona. (1)  The most challenging part for engineers was designing and constructing the roadway from Washington Boulevard to Nadine Road.  This section was known for its fast rising slopes along the south shores of the Allegheny River.  Another obstacle was the railroad tracks owned by the Allegheny Valley Railroad and Pennsylvania Railroad.  The ultimate obstacle that would hold the highway in doubt for nearly three years was land owned by the Pennsylvania Water Commission in Nadine.

Forgotten by over 70 years of time is the roadway's original nickname, "Blunder" or "Bungle Boulevard."  The blunder, an oversight by Allegheny County Director of Public Works Norman F. Brown, was a dispute over right-of-way between the Pennsylvania Water Commission and Allegheny County.  This would also include the Pennsylvania Railroad as they owned rail tracks the county wished to move. (2)  The cost of the mistake was one half million dollars. (3)  Although the water commission and the county wished to come upon a settlement, by 1932 the entire highway was completed with the exception of the "bungled" area that would in the end only be 1,300 feet of roadway.

While many compromises were being discussed including a 1,700 foot link that included "a grade of less than 8 percent, in a sweeping curve with a 600-foot radius...the eastern end [would] descend to meet the present improved highway on a 4 per cent grade.", a bridge would be built over Nadine Road and a "ramp at the eastern end leading down into the Nadine Road and the water company's plant." (4)  As various local and state politicians got involved, the "blunder" was an issue in the 1931 Allegheny County Commissioner Race in which Brown lost, other communities provided their own pressure to the design of the highway.  In 1933, Penn Township announced that the community would oppose any plan that would not give the township a highway outlet to the river.  (5)  Oakmont petitioned for a fast solution so area communities could reap the benefits of the new road. (6)

It wasn't until the Spring of 1933 when Pennsylvania Governor Pinchot signed a bill that "[gave] county commissioners authority to force settlement of the right-of-way problem by relocating the rights-of-way of public service companies." (7)  The bill was sponsored by Representative James H. McClure and paved the way to the ultimate completion of the highway.  Work was scheduled to begin immediately and by the Winter of 1934 the highway was opened.  An editorial in the February 1, 1934 Pittsburgh Post-Gazette read, "Now that the Nadine bottleneck in the Allegheny River Boulevard has been opened, an old reliable item will be missed by newspaper readers.  The story of the Nadine jam was a pretty expensive comic serial."

Allegheny River Boulevard entrance pylons in Verona. (Eric Lasher)
One of the key features to Allegheny River Boulevard was eight "observation turnouts" along the highway.  These parkway like features included stone observation platforms allowed for wide vistas of the Allegheny River.  In addition, two concrete pylons designed by Frank Vitter were placed at each end of the boulevard.  Currently, two pylons at the original northern terminus of Allegheny River Boulevard remain standing in Verona.

Today, safety and capacity concerns and improvements are the major issues of the highway.  Other issues include the deteriorating condition of the scenic pull-offs that were part of the original design and a redesign of the highway in Penn Hills.  During the mid-1990s, two groups, Preservation Pennsylvania and Scenic America, deemed the highway at risk due to the deterioration of the turnouts and bridges, unchecked overgrowth and commercial billboards.  Preservation Pennsylvania in 1995 suggested that the boulevard be added to the National Register of Historic Places.  In 2003,  the Pittsburgh non-profit organization, Friends of the Riverfront, suggested that Allegheny River Boulevard be considered for a Pennsylvania Scenic Byways designation that would help to preserve the scenic attributes of the roadway.  Currently, neither designation has occurred.  Later in 2008, the National Parks Service conducted a Historic American Landscapes Survey of Allegheny River Boulevard and the three pull-offs.

In 2007, the Town of Verona refurbished the two concrete pylons on Allegheny River Boulevard.  The refurbishment included fixing the illumination system inside the sculpture allowing the pylons to be lit for the first time in decades. (Eric Lasher)
For the 2007 US Open at Oakmont Country Club, the Town of Verona refurbished the Allegheny River Boulevard pylons.  The rehabilitation also included restoring the pylons' ability to light up at night.  This was the first time the pylons were illuminated in an unknown amount of time.  The restoration has been a source of civic pride and hope that the entire boulevard and scenic observation points can be restored to its prior grandeur. 
The relit pylon from the outbound side. (Eric Lasher)
Sources & Links:
  • Eric Lasher
  • (1) "Task of Providing Modern Highway Along Steep Hill Is Difficult." Pittsburgh Press. August 29, 1929.
  • (2) "Brown Denies 'Blunder' Made In Boulevard." Pittsburgh Press. July 17, 1930.
  • (3) "Bungle To Cost Half Million." Pittsburgh Press. November 26, 1930.
  • (4) "Officials May Blast To Build Highway." Pittsburgh Press. August 19, 1932.
  • (5) "Still Further Delay Seen In Nadine Pass." Pittsburgh Post-Gazette. April 27, 1933.
  • (6) "Nadine Road Problems Up For Solution." Pittsburgh Post-Gazette. February 24, 1932.
  • (7) "Pinchot Signs Bill Erasing Nadine Error." Pittsburgh Press. April 11, 1933.
  •  

    Comments

    Popular posts from this blog

    Legend of the Ridge Route; a history of crossing the mountains between the Los Angeles Basin and San Joaquin Valley from wagon trails to Interstates

    Over the past two decades I've crossed the Interstate 5 corridor from Los Angeles north over the Sierra Pelona Mountains and Tehachapi Range to San Joaquin Valley what seems to be an immeasurable number of times.  While Interstate 5 from Castaic Junction to Grapevine via Tejon Pass today is known to most as "The Grapevine" it occupies a corridor which has been traversed by numerous historic highways.  The most notable of these highways is known as the "Ridge Route."  This article is dedicated to the Ridge Route and the various highways that preceded it. 


    The Ridge Route is a 44 mile section of highway which was completed in 1915.  The Ridge Route originally stretched from Castaic Junction north over Liebre Summit and Tejon Pass to the tiny community of Grapevine.  In spite of a roadway that once utilized nearly 700 curves the Ridge Route is generally considered far ahead of it's time and one of the first modern highways constructed for automotive use.  The…

    California Ferry Routes; CA 84 over the Real McCoy II Ferry and CA 220 over the J-Mack Ferry

    This past weekend I had was up in the Sacramento River Delta and drove both State Highway Ferry Routes; California State Route 84 via the Real McCoy Ferry and CA 220 via the J-Mack Ferry.


    Both State Highway Ferry routes crosses the waters of the Sacramento River Delta to Ryer Island.  My approach to Ryer Island began in Solano County on CA 12 heading westbound over the Rio Vista Bridge.  As traffic is approaching the western flank of the Rio Vista Bridge there is an exit for the north segment of CA 84.  Said CA 84 exit directs traffic to downtown Rio Vista and Ryer Island.  Oddly CA 84 isn't signed on westbound CA 12 but is on eastbound CA 12.



    CA 84 is actually signed north of Rio Vista just not very well.  I only encountered two reassurance shields; the first being below the Rio Vista Bridge.  Traffic on CA 84 is advised that Ryer Island is only two miles to the north.





    Most of the signage on CA 84 is old and still has button-copy.  Sacramento is signed as 36 miles northward from…

    California State Route 99/Old US Route 99 Freeway Part 2; US Route 50/California State Route 51 south to California State Route 145

    Earlier this month I drove back from home from Sacramento on the California State Route 99/Old US 99 freeway.


    This blog serves as the Second of Two posts in the California State Route 99/Old US 99 Freeway series.  This entry covers the route of CA 99 southbound from US 50/CA 51 in Sacramento to CA 145 in Madera.  Part One covered the route of the CA 99 freeway northbound from I-5 in Wheeler Ridge to CA 145 in Madera and can be found here:

    California State Route 99/Old US Route 99 Freeway Part 1; Interstate 5 north to California State Route 145

    My approach to the CA 99 Freeway was from US 50 eastbound in Sacramento in central Sacramento County.  The exit for the CA 99 Freeway south bound splits for the I-80 Business Loop/CA 51 northbound.  CA 99 is actually multiplexed south through Sacramento on I-5 and US 50 before it becomes a stand alone route south of US 50/CA 51.





    The I-80 Business Loop/CA 51 Freeway was once part of US 99E.  I wrote about the history of the I-80 BL/CA 51 Freeway i…