Skip to main content

Allegheny River Boulevard - Pittsburgh's Blunder Boulevard

Authorized for construction as part of the 1928 Allegheny County Bond Issue, Allegheny River Boulevard runs from Washington Blvd. in the Highland Park neighborhood of the City of Pittsburgh to Hulton Road in the suburb of Oakmont.  When opened in 1934, the roadway was Pittsburgh's first link between the city and the suburbs to the north and east.  However, unlike her sister highways; Ohio River Boulevard to the west, Saw Mill Run Boulevard to the south, and Moss Side Boulevard on the eastern edge of the county, Allegheny River Boulevard would be the last to open after a nearly three year struggle over what amounted to basically 1300 feet of highway.
 
The 1928 bond issue allocated over $3.5 million for construction of the four and one half mile roadway from Washington Boulevard in Highland Park to Wildwood Avenue in Verona. (1)  The most challenging part for engineers was designing and constructing the roadway from Washington Boulevard to Nadine Road.  This section was known for its fast rising slopes along the south shores of the Allegheny River.  Another obstacle was the railroad tracks owned by the Allegheny Valley Railroad and Pennsylvania Railroad.  The ultimate obstacle that would hold the highway in doubt for nearly three years was land owned by the Pennsylvania Water Commission in Nadine.

Forgotten by over 70 years of time is the roadway's original nickname, "Blunder" or "Bungle Boulevard."  The blunder, an oversight by Allegheny County Director of Public Works Norman F. Brown, was a dispute over right-of-way between the Pennsylvania Water Commission and Allegheny County.  This would also include the Pennsylvania Railroad as they owned rail tracks the county wished to move. (2)  The cost of the mistake was one half million dollars. (3)  Although the water commission and the county wished to come upon a settlement, by 1932 the entire highway was completed with the exception of the "bungled" area that would in the end only be 1,300 feet of roadway.

While many compromises were being discussed including a 1,700 foot link that included "a grade of less than 8 percent, in a sweeping curve with a 600-foot radius...the eastern end [would] descend to meet the present improved highway on a 4 per cent grade.", a bridge would be built over Nadine Road and a "ramp at the eastern end leading down into the Nadine Road and the water company's plant." (4)  As various local and state politicians got involved, the "blunder" was an issue in the 1931 Allegheny County Commissioner Race in which Brown lost, other communities provided their own pressure to the design of the highway.  In 1933, Penn Township announced that the community would oppose any plan that would not give the township a highway outlet to the river.  (5)  Oakmont petitioned for a fast solution so area communities could reap the benefits of the new road. (6)

It wasn't until the Spring of 1933 when Pennsylvania Governor Pinchot signed a bill that "[gave] county commissioners authority to force settlement of the right-of-way problem by relocating the rights-of-way of public service companies." (7)  The bill was sponsored by Representative James H. McClure and paved the way to the ultimate completion of the highway.  Work was scheduled to begin immediately and by the Winter of 1934 the highway was opened.  An editorial in the February 1, 1934 Pittsburgh Post-Gazette read, "Now that the Nadine bottleneck in the Allegheny River Boulevard has been opened, an old reliable item will be missed by newspaper readers.  The story of the Nadine jam was a pretty expensive comic serial."

Allegheny River Boulevard entrance pylons in Verona. (Eric Lasher)
One of the key features to Allegheny River Boulevard was eight "observation turnouts" along the highway.  These parkway like features included stone observation platforms allowed for wide vistas of the Allegheny River.  In addition, two concrete pylons designed by Frank Vitter were placed at each end of the boulevard.  Currently, two pylons at the original northern terminus of Allegheny River Boulevard remain standing in Verona.

Today, safety and capacity concerns and improvements are the major issues of the highway.  Other issues include the deteriorating condition of the scenic pull-offs that were part of the original design and a redesign of the highway in Penn Hills.  During the mid-1990s, two groups, Preservation Pennsylvania and Scenic America, deemed the highway at risk due to the deterioration of the turnouts and bridges, unchecked overgrowth and commercial billboards.  Preservation Pennsylvania in 1995 suggested that the boulevard be added to the National Register of Historic Places.  In 2003,  the Pittsburgh non-profit organization, Friends of the Riverfront, suggested that Allegheny River Boulevard be considered for a Pennsylvania Scenic Byways designation that would help to preserve the scenic attributes of the roadway.  Currently, neither designation has occurred.  Later in 2008, the National Parks Service conducted a Historic American Landscapes Survey of Allegheny River Boulevard and the three pull-offs.

In 2007, the Town of Verona refurbished the two concrete pylons on Allegheny River Boulevard.  The refurbishment included fixing the illumination system inside the sculpture allowing the pylons to be lit for the first time in decades. (Eric Lasher)
For the 2007 US Open at Oakmont Country Club, the Town of Verona refurbished the Allegheny River Boulevard pylons.  The rehabilitation also included restoring the pylons' ability to light up at night.  This was the first time the pylons were illuminated in an unknown amount of time.  The restoration has been a source of civic pride and hope that the entire boulevard and scenic observation points can be restored to its prior grandeur. 
The relit pylon from the outbound side. (Eric Lasher)
Sources & Links:
  • Eric Lasher
  • (1) "Task of Providing Modern Highway Along Steep Hill Is Difficult." Pittsburgh Press. August 29, 1929.
  • (2) "Brown Denies 'Blunder' Made In Boulevard." Pittsburgh Press. July 17, 1930.
  • (3) "Bungle To Cost Half Million." Pittsburgh Press. November 26, 1930.
  • (4) "Officials May Blast To Build Highway." Pittsburgh Press. August 19, 1932.
  • (5) "Still Further Delay Seen In Nadine Pass." Pittsburgh Post-Gazette. April 27, 1933.
  • (6) "Nadine Road Problems Up For Solution." Pittsburgh Post-Gazette. February 24, 1932.
  • (7) "Pinchot Signs Bill Erasing Nadine Error." Pittsburgh Press. April 11, 1933.
  •  

    Comments

    Popular posts from this blog

    California State Route 88 the Carson Pass Highway

    Between 2016 and 2017 I drove the majority of California State Route 88 from CA 99 in Stockton east over Carson Pass to CA 89.






    CA 88 is a 122 mile state highway from CA 99 in Stockton east over the Sierra Nevada Range to the continuation route Nevada State Route 88 at the Nevada State Line.  CA 88 is known as the Carson Pass Highway.  Carson Pass at 8,574 feet above sea level along CA 88 is an all-year Mountain Pass in the Sierras and on occasion designated as Temporary US Route 50 when conditions are bad over Echo Summit. 

    CA 88 was not one of the original Signed State Highways.  CA 8 was the original designation over Carson Pass which can be seen on the 1938 California State Highway Map.

    1938 State Highway Map

    CA 8 was substantially different than CA 88 west of Jackson as it largely follows the current route of CA 26.  From US 99E in 1934 and later US 50/99 in 1936 from Stockton CA 8 originally used the following route to reach Jackson:

    -  Legislative Route 5 from US 99 in Stockton …

    California State Route 49; The Golden Chain Highway (CA 41 north to CA 16)

    Last year I traveled California State Route 49 from CA 16 north to CA 89 in one continuous trip.  This year and in early 2016 I traveled the rest of CA 49 south to CA 41 in Oakhurst.  This blog post consists of photos of the highway from those time periods and historical information about the southern part of CA 49.


    This blog post is meant to be a continuation of the previous one I did regarding CA 49 from CA 16 north to CA 89.  A link to said blog post can be found below:

    California State Route 49; The Golden Chain Highway (CA 16 north to CA 89)

    As stated in the previous blog post; CA 49 is an approximately 295 mile long north/south highway which traverses the traditional Gold Rush Country of California.  While I intend to discuss county level historical alignments of CA 49 as I did in the first blog post I thought this would be a good place to discuss the backstory of highway.

    CA 49 was first signed in 1934 along a series of Legislative Route Numbers ("LRN") that were large…

    Caliente-Bodfish Road/Kern County Road 483

    Back in 2016 I took Caliente-Bodfish Road south towards California State Route 58 while leaving the Sierra Nevada Range after looking for the town site of Old Kernville.






    Caliente-Bodfish Road is also known as Kern County Road 483 which I believe is an internal designation for mountainous roadways within the Sierra Nevada Range.  Caliente-Bodfish Road begins at Kern Canyon Road (Old California State Route 178) at the southern extent of Bodfish and climbs over the southern most extent of the Sierra Nevada Range approximately 35 miles to Bena Road near Caliente.  Caliente-Bodfish Road is a full two-lane road despite traversing some narrow terrain in the Sierras.  The high point on Caliente-Bodfish Road appeared to be near 4,000 feet above sea-level and I would estimate that there grades as high as 10% in places.

    South of Bodfish Caliente-Bodfish Road ascends quickly above the community on a series of switchbacks.  There is no official overlook but there is a hell of a view of Bodfish an…