California State Route 267

Leaving Lake Tahoe this weekend I took the entirety of California State Route 267 north towards Truckee and Donner Pass.


CA 267 is a relatively short state highway traversing north from the shore of Lake Tahoe in Placer County 13 miles to I-80/CA 89 located in Truckee in Nevada County.  The entirety of CA 267 is signed on Shore Road.  Heading north from CA 28 there is a small guide sign showing the distance to Truckee and I-80.



The southern part of CA 267 is known as the Senator Paul J. Lunardi Memorial Highway.


 CA 267 northbound ascends on a steep grade to the 7,179 foot Brockway Summit.



CA 267 north from Brockway Summit has a 5 mile downhill grade at 9% to the Truckee River watershed.





The Truckee-Tahoe Airport is on CA 267 just south of the Truckee Town limits at Truckee-Tahoe Airport Road.


A couple hundred feet north of Truckee-Tahoe Airport Road CA 267 enters Nevada County and the town limits of Truckee.


CA 267 northbound traffic is directed towards I-80 in Truckee on the CHP Officer Glenn Carlson Memorial Bypass.  The original alignment of CA 267 continued into downtown Truckee on Old Brockway Road and to I-80/CA 89 on Donner Pass Road.




CA 267 crosses the Truckee River and Union Pacific Railroad descending Donner Pass before terminating at I-80/CA 89.




CA 267 is a relatively new State Highway designation having been adopted in Legislative Chapter 1425 in 1965.

CAhighways.org on CA 267

CA 267 first appears on the 1966 State Highway map as a complete State Route but unsigned.

1966 State Highway Map

CA 267 appears to have been signed by 1967.

1967 State Highway Map

According to historicaerials.com the alignment of CA 267 switched from Old Brockway Road/Donner Pass to the CHP Officer Glenn Carlson Memorial Bypass some time between 1994 and 2003.

The future alignment of CA 267 appears as a well maintained county route between Truckee over Brockway Summit to Lake Tahoe on the California Division of Highways maps of Nevada/Placer County in 1935.

1935 Nevada County Highway Map

1935 Placer County Highway Map



Comments

Popular posts from this blog

Legend of the Ridge Route; a history of crossing the mountains between the Los Angeles Basin and San Joaquin Valley from wagon trails to Interstates

Over the past two decades I've crossed the Interstate 5 corridor from Los Angeles north over the Sierra Pelona Mountains and Tehachapi Range to San Joaquin Valley what seems to be an immeasurable number of times.  While Interstate 5 from Castaic Junction to Grapevine via Tejon Pass today is known to most as "The Grapevine" it occupies a corridor which has been traversed by numerous historic highways.  The most notable of these highways is known as the "Ridge Route."  This article is dedicated to the Ridge Route and the various highways that preceded it. 


The Ridge Route is a 44 mile section of highway which was completed in 1915.  The Ridge Route originally stretched from Castaic Junction north over Liebre Summit and Tejon Pass to the tiny community of Grapevine.  In spite of a roadway that once utilized nearly 700 curves the Ridge Route is generally considered far ahead of it's time and one of the first modern highways constructed for automotive use.  The…

Ghost Town Tuesday; Vineland, Florida; the town killed by Disney

Vineland is a small ghost town located in southwest Orange County, Florida near the junction of Florida State Road 535 and Interstate 4.  Vineland is somewhat unique due to it largely being squeezed out of existence by Lake Buena Vista which is the company town where Disney World is located.


Vineland was founded in the late 1800s as Englewood.  The town name of Englewood changed to Orange Center in 1911 before finally assuming the name Vineland in 1924.  Much like the rest of Orange County the community of Vineland was centered around Citrus Grove.  In the case of Vineland said orange groves were centered around Ruby Lake.

The end of Vineland came as the Disney Corporation began purchasing parcels of citrus grove land to build Lake Buena Vista.  Vineland fell into a sharp decline in the 1960s but the community managed to continue to exist to modern times.  Much of the street grid of Vineland still exists east of FL 535 but most of the original structures are either gone or fallen into…

I-73/I-74 (and Other Future Interstates) in NC Year in Review 2018

Welcome to my latest annual review of the progress of building I-73, I-74 and other Future Interstate routes in North Carolina. 2018 saw the completion, for the time being, of the remaining I-73 construction projects, the expansion of I-74 construction, and the establishment of one new interstate route, I-285 between Lexington and Winston-Salem.
I-73 Work was completed on the US 220 widening project between Summerfield and NC 68 in December 2017, however the route was not officially signed until March 2018. Completion of this segment extended I-73 northward about 4 miles just beyond NC 68. This will be the northern limits of the route for the time being. End I-73 sign approaching US 220 freeway end north of NC 68
At the southern end of state work too was completed, for now, on I-73 (and I-74) in the Rockingham area. The first section of the Rockingham Bypass, the upgrade of 3 miles of US 220 to Interstate Standards was completed in June 2018. The project includes a new exit at Dockery R…