Skip to main content

Catching Up: SCDOT Executive Director Mabry Resigns (December 2006)

In the midst of moving back to NC and the Christmas holiday, I missed this news story out of South Carolina.

This past December, SCDOT Executive Director Elizabeth (Betty) Mabry resigned in the face of increasing pressure from an audit of the organization.

The audit which was released in November showed that SCDOT wasted over $50 million dollars over a three year period (2002-2005). The heat on Mabry was turned up a few notches as a result of the audit. The loudest calls for her resignation came from the Transportation Commission Chairperson, Tee Hooper. Hooper had been calling for her resignation since March 2005.

His complaints of mismanagement of funds and lowering the agency's morale in February 2005 led to the audit of the agency. Part of his complaint also included a claim that Mabry passed up on the chance to receive $145 million in federal funding.

Immediately after his first calls for resignation, the transportation commission voted unanimously (6-0) in support of Mabry. Hooper in his role only votes in a tie.

After the audit was released, Mabry was adamant in defending her record. “No, I don’t intend to resign at all and I don’t believe that would be in the best interest of the agency,” Mabry said.

She also pointed to her various successes including the 27 in 7 program. 27 years of projects being completed in seven years. She also questioned his past role with HomeGold the parent company of Carolina Investors. The company went bankrupt in 2003 costing more than 8,000 people their jobs. Her concern that Hooper -- appointed by Governor Mark Sanford -- was trying to put the agency under more control of the governor and tarnishing SCDOT's reputation.

However in December, while Mabry was on sick leave, two DOT employees testified in front of a state Senate panel that they were ordered to hide cash balances. A State House panel then directs the state attorney general to investigate the matter. Mabry would resign December 19th after over 20 years with SCDOT.

State highway engineer Tony Chapman was named and currently serves as Interim Executive Director.

Sources: Elizabeth Mabry's Tenure (timeline) ---The State
SCDOT Director Refuses to Step Down ---Construction Equipment Guide (Associated Press)
SCDOT Chairman Calls for Mabry's Resignation ---Construction Equipment Guide (Associated Press)

Comments

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third