A few more photos of I-73 on the Greensboro Outer Loop

Now that everyone has calmed down at the sight of seeing I-73 signed on the recently opened segments of the Greensboro Outer Loop, it's time to get you all excited again!

Yep, you guessed it. More I-73 Photos! A few weeks ago Bob Malme sent me three shots showing other ways I-73 is signed on the freeways and surface streets that interchange with I-40/73.

Here Bob is on Wendover Ave. and I-73 is marked on the overhead signs. It will be interesting to see what will be listed under Winston-Salem as the Greensboro Loop and I-73 is built. Martinsville, maybe?

Again on Wendover, here's a look at stand alone I-40 and I-73 shields. If you aren't a fan of I-73....get used to it. It's here to stay.

Now some have stated that I-40/73/85 form one of the few triplex Interstate segments in the country. And hell, the state even signs it that way.


Well upon closer inspection, that may not be the case. You see, I-85 South physically leaves the Greensboro Loop before I-73 North joins it. (Now for about a 1/2 mile or so I-73 North runs parallel to the loop via the ramp that begins at right in the photo above.) I-73 South leaves I-40 East before I-85 North Joins the loop. (Again same scenario with parallel ramps).


Now the two photos above are from last October when the new section was still under construction. To the right is the two lane ramp that carries I-73 North from US 220 (along with access to Grandover Parkway) In the middle I-40 West will bear to the right while I-85 South heads left and off the loop to head south to Charlotte, Atlanta, and whatnot. SO I-73 North is not on the main traffic lanes of the loop when I-85 South exits off. (Now you see why I call it 'The Maze'?)


Then there is the above sign on US 220 (Future I-73 North) as it approaches the loop. There is no access to I-85 South from I-73 North. Those wanting to get on I-85 South and head to Charlotte need to go a mile further north to where US 220 meets what is now Business I-85.

Confused yet? I am sure you are. Fortunately, this 'Maze' of connections are all within a mile of each other, and someway somehow you can get there from here. But it appears that the I-40/73/85 multiplex doesn't 'technically' exist.

Comments

AKILEZ said…
How about driving on 95?
Roaddog said…
I've also questioned whether it exists, because Future Interstate 73 shields were posted on the U.S. 220 freeway leaving south of now Business Loop Interstate 40 & U.S. 421. Have those been removed, or is the triplex signing a stop-gap until that section of freeway is brought up to standards?
Adam said…
Alex,

The Future shields that you are referring to are from the original I-73 corridor (the one that had it down NC 68 to I-40 to US 220).

From my understanding I-73 will be on the loop from Bryan Boulevard to US 220. There has never been an official announcement, but a number of NCDOT maps show the change in the corridor to the current routing around Greensboro.

The shields were up prior to the bypass opening; however, I am not aware of their status since the 40 bypass opened. If they are still up, it's more than likely that NCDOT has not gotten to them yet.

I am in Charlotte this weekend, so on my way back to Raleigh - I'll try to see if the shields in fact have been taken down.

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …