The section of NY 7 from the Interstate 88 Exit 25 Access Road and Dunnsville Road has seen a great increase in truck traffic over the past three to five years, and residents want to see a better and safer road.

The cause for the extra truck traffic: The continued growth and expansion of Galesi Group’s Rotterdam Corporate Park. The park which is located less than three miles from I-88 and the NY Thruway also sits on a busy CSXT rail line. Currently, the Park includes distribution centers for Price Chopper, FedEx, and Railex. Distribution Unlimited is the park's largest operation.

In addition, other companies are looking at the surrounding area for warehouse and distribution centers. McLane Foodservice is looking at a site adjacent to the I-88 Exit 25 ramps for a possible distribution site.

Residents are glad to see the additional business and jobs to the area but are concerned about the traffic issues and problems. Beginning at hte Exit 25 access ramps and to the traffic signal at Dunnsville Road, residents believe that there are quite enough possibilities for improvements.

The light at the I-88 ramps is one of the bigger tie-ups. A four way intersection with the I-88 ramp, NY 7 and Becker Drive which leads to a local subdivision can be troublesome in the morning. Truck traffic can stretch on the ramp to I-88 Westbound and light delays can last 15 minutes. There are a few factors to this issue. First, morning rush hour traffic to the Corporate Center and other business in Rotterdam (Exit 25 is the best and only access point into Rotterdam from I-88 or the NY Thruway). Traffic for Mohonasen High School which sits between I-88 and the Golub Park. Plus, the daily truck traffic in and out of the various distribution centers. (For 18 of the 24 months I lived in the area, my office was across the street from the Golub Center and I would face the traffic daily).

Residents are also concerned about the more frequent accidents occurring on the highway.

There are also tie-ups at the Dunnsville Road signalized intersection with the NY 7. Although earlier in the decade there were intersection improvements made, traffic has been known to back up in both directions in NY 7 as the truck queue is too large for the entrance to handle.

Some improvements have been made, but residents shouldn't expect anything drastic. Recently, there has been a third entrance added to the Corporate Park. The Dunnsville Road Guard Shack has been placed further back allowing more trucks to queue without backing up traffic on NY 7.

The state plans to lengthen the turning lanes at the I-88 and Becker Drive traffic light, along with the addition of No Parking signs. More often, trucks have been overnighting on the shoulders of the I-88 ramps and NY 7.

But with an average traffic volume of 14,000 vehicles per day, the state doesn't consider the two lane NY 7 as 'heavily traveled' enough.

Story: Schenectady Daily Gazette

Commentary:

As I mentioned earlier, I have experience with this stretch of NY 7. From Feb. 2005 to August 2006, my company's office was located across from the Rotterdam Corporate Park. The biggest issue for me was the back-up at the Becker Drive light at the end of the I-88 Exit 25 ramps. I do hope that a simple and not as costly measure of improving the timing and signalization of this light has been done or is being considered. It would be a great safety measure considering the traffic at the light for the school, the trucks to the various distribution centers, and just normal daily traffic.

I think the Quikway Gas Station could expand its parking lot allowing truck overnight parking. Other than that, NY 7 in this area goes through a rather residential area. There's not much that can be improved. You really can't make it a four lane road. But you can improve the turning lanes, signals and shoulders it will be a great help.

Comments

Popular posts from this blog

Goodbye Interstate 495; Hello Interstate 87

It seems like yesterday when I blogged about new Future Interstate 495 signs that were going to be installed along US 64 along the Knightdale Bypass and along the way to Rocky Mount.  Well after just three years, Interstate 495 is officially no more.  This week NCDOT crews began to install Interstate 87 shields along the Raleigh Beltline and Knightdale Bypass from Southeast Raleigh to Rolesville Road in Wendell.  The new interstate designation follows Interstate 440 west from I-40 near Garner leaving the Beltline at the Knightdale Bypass and following US 64/264 about another 12 or so miles until the six lane portion of the Knightdale Bypass ends just beyond Business US 64.

Eventually, Interstate 87 will continue east along US 64 past Zebulon, Rocky Mount and Tarboro to Williamston where it will head north and northeast along US 17 into Virginia and Norfolk.  The new signs reflect the first official section of Interstate 87 in North Carolina - as the Knightdale Bypass meets national I…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

Hunting for forgotten history; Old US 99 in Fresno

Coming back from my Great Lakes Trip the other day I encountered this sign goof at Fresno-Yosemite International Airport which incorrectly displays US Route 99.





That little US 99 sign was the inspiration I needed to start tracking all the former alignments through the City of Fresno.  Fresno in general has had a huge shift in highway layouts over the decades which is something I intend to finish with California 41 and 180 perhaps later this month.  Based off my research I came with the following three maps progressing northward through Fresno showing every iteration of US 99 before it was downgraded to a State Highway in 1967.




Essentially the route alignment history of US Route 99 in Fresno is as follows.

1926-1930 Alignment 

Progressing northward into Fresno US Route 99 would have followed:

Railroad Avenue
-  Cherry Avenue
-  Broadway Street
-  Divisadero Street
-  H Street
-  Belmont Avenue
-  Golden State Avenue

1930-1934 Realignment off of Railroad Avenue

Sometime between 1930 to …