Skip to main content

A Carolinas Road Meet Preview

Bob Malme and I did a brief road trip today to scout for the upcoming Carolinas Road Meet on Saturday, May 31.

The meet will be featuring a tour of the soon to be completed US 70 Clayton Bypass. The bypass will carry US 70 around one of the more congested areas of the triangle, the town of Clayton. It will run from Interstate 40 at milemarker 310 to the current US 70/US 70 Business split west of Smithfield and Selma. Besides the two interchanges at the bypass' terminal points (I-40 and US 70 Business) there will also be diamond interchanges with NC 42 and Ranch Road.

The meet will be held at the Cleveland Draft House on NC 42 in Garner at 12:30 PM on Saturday, May 31st. The group will meet up for lunch and then head on a tour of the Clayton Bypass and perhaps a few other items. We should be done around 3:30-4 pm.

If you are interested in going to the meet, just send me an e-mail.

Since I usually never get around to taking photos the day of the meet, here are some photos from the trip today:

Overhead signs at the Western Terminus of the Clayton Bypass at Interstate 40.

Looking eastbound on US 70. The NC 42 interchange is ahead.

Line painting is taking place on soon to be US 70 East at Exit 326 - US 70 Business (The eastern terminus of the bypass)

A closer view of the Exit 326 overhead.

You'd think that the 55 mph speed limit sign here on Cole Road would have been removed.

Pretty soon this 'End' sign for US 70 Business won't be needed as it will continue west from here on the former mainline of Highway 70.

Comments

Bob Malme said…
Was glad to join in on the Meet scouting. Other items of note: According to NCDOT, the Bypass is more than 98% complete, so it's possible it could be open by the Meet. The fact that they were working on line striping on a Saturday shows there is an urgency to get the job done. They were almost finished with the eastbound side, and had not started westbound. All the US 70 signage on the route to be bypassed had hidden business banners installed. There also covered over US 70 signs on I-40, hopefully with the right directional banners.

Speaking of incorrect banners, the BGSs going east on I-40 still had not been corrected; with hidden 'Business' labels over the East US 70 signage, instead of over west 70. Hopefully this will not delay the project opening and they will notice to fix it at a prior time.
Bob Malme said…
I've put up some photos that help illustrate some of my comments in the previous post at:
http://www.duke.edu/~rmalme/
masshighway.html

Don't let the name fool you, the NC photos are toward the bottom, below the Mass. photos. They include a Jones Sausage Road sign photo as well.

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …