Skip to main content

Triangle Expressway Updates...Full Speed Ahead

With all the funding from a variety of sources in place, the North Carolina Turnpike Authority yesterday officially awarded the construction contracts of the 18.8 mile Triangle Expressway. If, and that's a big if, all goes well we will see the entire highway open to traffic in 2012.

Wilson, NC based S.T. Wooten Corp will build the 3.4 miles of the Triangle Parkway at a cost of $137.5 million. This will build the toll road from NC 147 in RTP to NC 540 at Davis Drive. The project will also include a toll plaza on NC 540.

Two companies - Archer Western Contractors of Atlanta and Granite Construction of Watsonville, CA - combined to create Raleigh/Durham Roadbuilders to extend NC 540 from its current end 12.6 miles south to the NC 55 Bypass in Holly Springs. That contract is worth $446.5 million.

2.8 miles of currently open - and free - NC 540 from Davis Drive to NC 55 near Apex will be incorporated into the toll road.

Surveying is to begin this week - and an official ground breaking ceremony will be held on August 12th.

Story Links:
Turnpike board starts spending for toll road ---Raleigh News & Observer
Turnpike Authority awards contracts for state toll road ---WRAL-TV

Commentary:
So it begins, after nearly two years of teasing, construction of North Carolina's first toll road is set to begin. The road will be opened in two segments; and depending on which news story you read, the road will be completed in its entirety by 2012 or 2013. Of course, if the NCTA is anything like the NCDOT it will most likely be delayed.

Here at the blog, we have three members of our team within ear shot of this project - myself, Brian LeBlanc, and Bob Malme. All three of us will be covering different parts of this project - from construction progress and delays - discovering what the TOLL NC Highway shields will look like - to any political obstacles that will inevitably get in the way.

Hopefully one or all three of us will be at the groundbreaking on August 12th and we'll be here to file a report.

Comments

Bob Malme said…
I'll plan to be there for the groundbreaking (given that this is a toll road, will there be an entrance fee?). If any divvying up of the project coverage would work, I'm happy to take on the Triangle Parkway segment since it's closest to me.

Popular posts from this blog

Old River Lock & Control Structure (Lettsworth, LA)

  The Old River Control Structure (ORCS) and its connecting satellite facilities combine to form one of the most impressive flood control complexes in North America. Located along the west bank of the Mississippi River near the confluence with the Red River and Atchafalaya River nearby, this structure system was fundamentally made possible by the Flood Control Act of 1928 that was passed by the United States Congress in the aftermath of the Great Mississippi River Flood of 1927 however a second, less obvious motivation influenced the construction here. The Mississippi River’s channel has gradually elongated and meandered in the area over the centuries, creating new oxbows and sandbars that made navigation of the river challenging and time-consuming through the steamboat era of the 1800s. This treacherous area of the river known as “Turnbull’s Bend” was where the mouth of the Red River was located that the upriver end of the bend and the Atchafalaya River, then effectively an outflow

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third

California State Route 203 the proposed Minaret Summit Highway

California State Route 203 is an approximately nine-mile State Highway located near Mammoth Lakes in the Sierra Nevada Mountains of Mono County.  California State Route 203 as presently configured begins at US Route 395, passes through Mammoth Lakes and terminates at the Madera County line at Minaret Summit.  What is now California State Route 203 was added to the State Highway System in 1933 as Legislative Route Number 112.  The original Mammoth Lakes State Highway ended at Lake Mary near the site of Old Mammoth and was renumbered to California State Route 203 in 1964.  The modern alignment of the highway to Minaret Summit was adopted during 1967.   The corridor of Minaret Summit and Mammoth Pass have been subject to numerous proposed Trans-Sierra Highways.  The first corridor was proposed over Mammoth Pass following a Southern Pacific Railroad survey in 1901.  In 1931 a corridor between the Minarets Wilderness and High Sierra Peaks Wilderness was reserved by the Forest Service for po