Since the Greensboro signing changes are coming to an end, and I have other people supplying me with photos now, I decided to take a quick roadtrip the other direction today. Since NCDOT has released its final report on I-795 and announced reconstruction could start as early as next month, I decided to ride the rough road the last time and see if any other changes (signage, mileposts, exit numbers) had changed since my last visit in January.

The quick (and small) answer was no. Everything, except the road surface, was unchanged from when the signs went up in November 2007. Even the hard to see South I-795 to the right sign at the still marked US 117 exit is still there. But I did find some other new things to tell and show.

1. The US 64/264 'exit to nowhere' is almost complete. They were working on tying the completed westbound exit ramps to the highway when I passed by. Fortunately, I was going east because the two right lanes westbound were closed and traffic was backed up to the Business 64 exit (guess what I used on the way back). The signage is up, but covered over. Here's a couple sign photos heading east:
The sign above is at the one-mile mark. While below is at the eastbound exit ramp:
2. New mileposts along US 264. While they are resurfacing US 64/264 in Wake County, they have added mileposts and exit numbers to the 264 exits in Nash County. Previously the numbers didn't start until entering Wilson County a few miles from I-95.
The mileposts start at 23. The first new numbered exit is NC 231, which is Exit 27 (I know looking into the sun and hard to read) the exit signs before the ramps have no numbers, they are just on the gore signs.
The next exit for NC 581 is now numbered 30. If you need any further proof, here's the mile marker before the exit:
The next exit is Exit 34, Sims and is in Wilson County, the first sign is before the county line, so I don't know if it had a number previously:
Based on mileage calculation from the given mileposts the exits in Wake County, when numbered would probably be (going westbound) 22 for NC 39/Bus 264, 21 for NC 97 and 20 for US 64 East (or 20B for the NC 97 and A for the US 64, if you wanted to be exact).

3. Progress on the new US 70 Goldsboro Bypass
I-795 is still down to one-lane through the construction zone for the new US 70 Bypass. Progress has been made in building up the grades for the bypass and exit ramp bridges.
Approaching the construction zone, there will be three separate bridges across I-795.
The bridge piers for the US 70 highway itself.
One of the pieces of construction equipment bringing the grade up to bridge level.

4. The soon to be tree-less end of NC 540 West:
With the groundbreaking on the Triangle Parkway less than a week away, I thought I'd take this shot before the construction equipment appeared to extend the freeway. I noticed no construction equipment on NC 540 itself, but there were a few probably survey trucks on what now makes up the future ramp from East NC 540 to NC 55 East.

5. Misc.
For those who wanted to see an I-795 sign photo:
On the road going west from Pikeville (I drove US 117 starting back to see if there were any alternate US 117 signs, there were not, but they probably never were put up).

And, finally for those who haven't seen the End I-73 North sign I have on my I-73 Segment 5 page, another version, courtesy of Evan Semones:
I will return to I-795 once I've learned the reconstruction project is finished, which NCDOT says should be December.

Comments

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…