Trip up the I-73/74 Corridor

Last Wednesday (3/10), while returning from a trip to Florida, I took a detour to check out what was new along the I-74 and I-73/74 corridors. First off though, I started my day by taking a walk along the Savannah River and River St. in Savannah and clicking this photo of the beginning of I-16 West upon leaving:
After driving I-95 North for several hours, I reached I-74 near Lumberton and proceeded west than north (photos thus will appear in reverse order than they have in the past). Last fall I-74 shields were taken down along the Maxton and Laurinburg Bypasses. Well, not completely, the first exit heading east for NC 71 still has shields for I-74 East:
All the other shields along the bypass and interchanges are gone. In there place NCDOT has placed a few I-74 corridor shields:
Does this mean that the Future I-74 shields along this stretch won't return? Not necessarily, the first sign for the Laurinburg Bypass still has an I-74 shield with the former 'East' header replaced by 'Future.' The City of Laurinburg has asked its NCDOT representative to return the future shields, if it can't be signed an Interstate, so this may happen in the future, I guess.

Picking up I-73/74 north of Rockingham, they still refer to the Ellerbe Bypass freeway as a 'Future Interstate.' Still no indication on the freeway of where Business US 220 ends and Alternate 220 begins. Google maps list Business south of Norman and Alternate to the north without showing specifically where the change takes place.

More progress has been made at the site of the future I-74/I-73/US 220 interchange. First off, more dirt has been removed for the future ramp from Northbound I-73 to I-74 West:
This is to the east of US 220 North. They are also creating the landscaping that will take I-74 traffic across US 220 to I-73 North:
This is the view of the entire interchange area from 1/2 mile away looking northwest:
The next interchange for the new route will be where the freeway crosses current US 311. It appears the road will not have a route number now, more discussion on that below:
Here's a look on the grading done so far for the future freeway north of the interchange:
Proceeding to the first phase construction area north of Spencer Road. The contractors have made great progress, but have not completed, removing the old alignment of Cedar Square Road. To complete this they will have to realign the current end of Poole Road (where the stop sign can be seen) to meet what was Cedar Square further to the east:
They have made progress in building the eastbound exit ramp plus grading closer to the bridge:
Not much was new was seen going north until exploring the I-85 interchange area. They have started putting up new overhead signs. Signs for I-74/US 311 are covered up (put up just after the recent wind storm, unfortunately).:
This is driving northbound toward the NC 62 bridge. I assume the two signs are for the two I-74 exits. Going southbound some signs are uncovered. You can try to make out in the signs below on the right that show the number for the NC 62 exit has changed to 113A:
They've also put up new signs for the next exit, US 311, but, as you see there's no route noted:
Apparently the decommissioning of US 311 Business through High Point will mean there will be no business route taking over US 311 alignment from Business 85 to US 220. At the exit itself, they've left an old sign just in case anyone is looking for the current US 311 in the next few months:
Looking at the construction north of the I-85 interchange, more progress can be seen on grading from I-85 to the Kersey ValleyRoad bridge area:
Looking south from Dresden Road, below looking north, you can see work is being done on the drainage ditches:
Here's a view from the opposite side looking at where the above photos were taken, on the hill to the left of the stack of cement barriers:
They have also started making a landscape mound for the dirt from the previously ungraded westbound lane north of the Jackson Lake bridge (photo next time), so most of the grading, has been completed. The only area that still needs constructing is the Baker Road area, where the bridge has been opened:
This is the view driving westbound. Below is the view taken of the bridge looking east:
As you can tell the temporary road has yet to be torn down, nor has grading begun south of the bridge due to the need to remove some rocks before the ground can be made level.

Comment: Progress of construction has slowed down significantly during the winter and the first phase from Business 85 to Cedar Square Road stands as 82% complete at the end of February. Better weather should speed things up, but the June opening announced to High Point officials back in January will probably be pushed back to later in the summer.

Comments

Popular posts from this blog

California State Route 152

Circumstance had me out in the Monterey Peninsula again this week.  Generally I try to take a route like California State Route 198 or ever County Route J1 to get across the Diablo Range but time had me in a slight bind.  That being the case I took the popular way across the Diablos on California State Route 152 via Pacheco Pass.  152 is one of infamy given it is really the primary route for truckers to get from I-5 west in San Joaquin Valley to US 101 in Salinas Valley.  After zig-zagging some accidents on/off California State Route 99 near Madera in the rural outskirts of the County bearing the same name I began my westbound trek on 152.




CA 152 is called the William Whitehurst Highway, at least it is west from CA 99.  The entire route of CA 152 in San Joaquin is an expressway aside from a small portion in the city of Los Banos.



The first junction on CA 152 is with CA 233 which is a small 4 mile highway that travels northeast to CA 99.






Next westbound CA 152 encounters the junction w…

The National Road - Ohio - Muskingum and Licking Counties

As it travels from Zanesville towards Columbus, US 40 goes through numerous small towns, changes from two to four lanes and back numerous times, but most importantly the old road keeps its rural charm.  Between Zanesville and Gratiot, there are four former alignments of the old road that can be found: just west of Zanesville, Mt. Sterling, Hopewell and Gratiot.  Most stretches are very short and can be easily recognized with names as "Old US 40", "Old National Road" or some combination of the two.

Zanesville:
Just west of US 40's interchange with Interstate 70 (Exit 152) runs an old alignment.

Mt. Sterling:
Another old alignment goes through this small Muskingum County village.
Hopewell:
Today, US 40 passes south of the community of Hopewell.  The old two lane road is known as Hopewell National Road.
Gratiot:
Old US 40 is known as Main Street in this tiny village of 200 or so residents.  The old highway at times seems forgotten through here.
Just west of Gratiot, US 40 …

Throwback Thursday - October 12, 2017

In this week's edition of Throwback Thursday, we travel back to December 2003 to the southern end of Interstate 99 in Bedford, Pennsylvania, where we can see button copy guide signage for US 30 and US 220 (US 220 runs concurrent with I-99 through this part of the Keystone State). Since I-99 was relatively new at the time, it feels like it was an afterthought.