Skip to main content

New Exit Signs on Durham Freeway (NC 147)

Recently I posted to SERoads about an NCDOT press release regarding the replacement of interstate exit signs in Mecklenburg County. According to the press release "New signs with reflective sheeting will be installed, improving reflectivity and removing the need for lighting on the sign structure. The completion date is September 3."

New signs will be installed in the following locations:

  • I-77, Exits 1-23
  • I-85, Exits 27-42
  • I-485, Exits 1 and 32-67
  • I-277, Exits 1 and 2
Well, as it turns out, NCDOT has been for the last week installing similar signs (currently only on overhead structures) on the Durham Freeway, mostly southbound. I decided it was easier to show examples of the new signs by driving around Durham instead of traveling to Charlotte:

Here's a couple of the new signs at Exit 16A for US 15/501 North:
A closer look at the next sign for Hillandale Road reveals the light fixtures formerly at the bottom of the sign have been removed:
Sign changes have also occurred further south the last two days towards downtown Durham:
These signs changes are somewhat bittersweet for me, since the old ones were the first signs I saw heading south on the Freeway from my first apartment in Durham on Swift Road. The Freeway ended at Erwin Road at that time and the Swift Road southbound off ramp was the first exit ramp heading south. Exit 13 is also one of the ways to get to the Durham Bulls ballpark.

It appears they haven't quite finished installing the signs south of the city at Briggs Road, yet:
Notice no exit tab over the Briggs Avenue South sign (with, like for route numbers, the larger first letter in the direction label) and the new NC 147 sign still has lights installed. The placement of the exit tab on a separate sign makes it easier to remove for changes. Will there be changes in exit numbers when the Triangle Parkway, an extension of NC 147, is built? MassDOT is now doing the same thing with their new signs in case the FHWA refuses to exempt them from replacing their current consecutive exit numbers scheme with milepost based numbers.

Lastly, since I was there, I am throwing in a photo of the new pedestrian bridge near Alston Avenue completed earlier this spring:
They have posted a couple new signs northbound also. I'll wait though until the project is finished to take a look at those.

Comments

Anonymous said…
Just wanted to point out that they have propagated the error on the Exit 12 sign--that is US 15/US 501 BUSINESS but there's no mention of that fact...
Anonymous said…
I got some of the new sigh replacements when i was in Charlotte. Here is the link.
http://www.flickr.com/photos/azehner/4822047574/
BrentWhite said…
I-77 except for a handful of signs has been upgraded now.

I-85 has been upgraded from Exit 27 (Southbound only) to I-77.
Exit Signs said…
@Brent
Yes i noticed that it has been upgraded now.

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …