After decades of frustration...PA 51 and PA 88 intersection finally to be redesigned

For decades, residents and commuters in Pittsburgh's South Hills have waited for drastic and much needed improvements at the intersections of PA 51 and 88 in the city's Overbrook neighborhood.  From failed expressway plans and intersection redesign plans, this was one bottleneck that many thought would never go away.

Well, by 2014, the notorious left lane back up on Northbound PA 51 with traffic wanting to turn onto Library Road (PA 88) , Glenbury St.,and buses wanting to access the South Busway will be no more.  The daily mess will be replaced by a two-lane jughandle which will run from near Fairhaven Road, behind the existing Rite Aid Pharmacy, and then utilize Ivyglen St. 

The jughandle will be the key feature to a project that will eliminate all left turns from PA 51 at the dangerous intersection.

Other improvements include a second jughandleon PA 51 South at Fairhaven Road.  This jughandle will also utilize Stewart Ave.  In addition, three structurally deficient bridges and two culverts will be rebuilt.  A third, new culvert will be built over Weyman Run along the northbound jughandle route.

The project will cost between $14 and 15 million.  Construction will begin in 2013 and finish the following year.  A few businesses, including the Hillview Tavern, will be lost in right-of-way acquisition.

Story Links:
PennDOT to unveil planes for Routes 51, 88 in Overbrook ---Pittsburgh Post-Gazette
PennDot: 'Jug Handle Will Alleviate Route 88-51 Bottleneck ---WTAE-TV

Commentary:
In the P-G article, it leads with a line from a Joe Grata story in 1993, "The public will get its first detailed look today at plans to untangle the intersection of Routes 51 and 88 in Overbrook."  I remember that story, and a few others and prior to and after it on other plans and delays to revamp this intersection.  I recall a billboard being a problem in a right-of-way squabble.

The WTAE story mentioned how this isn't the ultimate solution but the most cost-effective, and it most likely is.  With any chance to build a urban expressway along the Saw Mill Run valley killed decades ago, the only way to improve any traffic flow patterns on PA 51 is do piecemeal minor improvements.  Over 10 years ago, the much needed Liberty Tunnels, West Liberty Avenue, and PA 51 interchange was built.  Later, improvements were made to the intersection of PA 51 and Woodruff Ave.  Now, the much needed improvements to the 51 and 88 intersection. 

Now only if the state would come up with the money to buy all of the blighted Levitske Brothers property along Saw Mill Run Blvd. and use that to widen Route 51.

Comments

Anonymous said…
The comment about the Levitskie Brothers signs is priceless!

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…