Skip to main content

Some NC Future Interstate and US Route News

Came across some somewhat old, but new to me, NC interstate and US route signing news via the web, so I thought I'd summarize it with a blog post.Link
I-73/74-NCDOT has gotten approval from the FHWA to sign the section south of Emery to just beyond Ellerbe as vanilla I-73/I-74. It appears the reason why NCDOT signed the route Future I-73/I-74 when it opened in 2008 was that this section was not officially part of the interstate system. The FHWA mandated that this section could not be added until NCDOT let the contract for rehabilitating the section through Asheboro (I-4407). This contract was let in June 2010, and is due to be completed this fall. NCDOT finally got around to asking for permission to put up full interstate shields this spring and got an acceptance letter back in June (copies of this and other letters are on the NCDOT Route Changes page, Interstate section, HERE ) .

In a subsequent letter dated 7/11/12, NCDOT indicates this approval to the local FHWA office in Raleigh, they also ask that they be allowed to put up Interstate shields north of Asheboro all the way up to Greensboro (for I-73 anyway). Apparently back in 1997, when the routes were first signed south of Asheboro, FHWA approved the US 220 freeway from Greensboro south to Emery as part of the interstate system with design exemptions for some of the exit ramps. They would not allow NCDOT to sign the rest of the route as a full interstate until they fixed five design problems that were not exempted (you guessed it, in the Asheboro stretch from SR 1462 to NC 134/Business 220). Again, the I-4407 project due to be completed this fall will do this. It may be that NCDOT waited to get approval for the Ellerbe section so that they could re-sign both Future interstate sections as full interstates at the same time. And, coincidentally, the new section of I-74 connecting to US 220 should be completed around the same time. It could be that by this time next year I-73 and I-74 will be signed from just south of Ellerbe northward to High Point for I-74 and Greensboro at I-40 for I-73.

US 311-Last year NCDOT finally got around to posting US 311 signs north from US 220 in Mayodan to NC 14 in Eden along an extension approved at least five years before. Well, guess what, now they want to extend the route again. Actually, the idea started across the border in Virginia where boosters of a new development called the MegaPark, just north of Eden and south of US 58, thought having a US route run by their property would be good for business. They initiated contact with NCDOT who agreed to study what needed to be done to extend US 311 further north along NC 14 and NC 87 to NC 770 to NC 770 to the border then along Berry Hill Road in VA to US 58. In a letter to VADOT, NC officials indicated the study was underway and they planned to have the necessary paperwork sent to AASHTO's US Route Numbering Committee by March 31, the deadline for applications to be considered at the next meeting of the committee in May. Since its a 2-state routing VADOT has to send in an application by the deadline as well. If both get the paperwork in, and its approved, how long will it take for signs to go up this time (at least in NC)?

Future I-295-One of the new routes approved by NCDOT in the past year is NC 295. Which, not coincidentally shares the route of current Future I-295 in Fayetteville from I-95 to US 401. Apparently this was done to officially define the Fayetteville Loop as an NC state highway for funding and legislative purposes, an oversight apparently not caught until last year. This probably will not result in any NC 295 signs going up along this route though which is to become an official interstate when the next stretch of the Loop is completed in a couple years.

Thanks to NCDOT for giving me highways to check up on when I am down in NC this summer.

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…