Another Sunday TriEx Trip

Took an early Sunday morning trip to check out progress in the last month in completing the first segment of the Triangle Expressway from NC 55 to US 64 now due to open August 1. With the aid of an iced coffee break at Dunkin' Donuts, I actually got to explore further south before the thermometer got to high.

The first part is basically a repeat of last month's journey, so I'll just include any highlights of what's new:
NC 55-The new exit signs that were stored in the median in June have been put up. Here is a comparison of the new (overhead) and old:
The ramps had received what looked like their last layer of pavement. Lane striping and traffic signal work remains to be completed.

McCrimmon Parkway
This view back toward NC 55 shows the addition of lane markings and additional signage in the past month--

 Panther Creek High School is behind the trees to the right. 

 Looking south, similar progress can be seen--



 Three lanes in each direction are marked, there also appears to be a traffic camera set up along the southbound lanes.

Green Hope School Road
Similar progress here, with auxiliary and regulatory signage appearing along with lane markings since the first week of June--
This is a closeup of the Green Hope School Rd bridge over the TriEx. Many people in a TriEx column this week in the Raleigh paper said bridges like this are 'too fancy' especially with the steet name carved into the right abutment. Of course, many of these were the same people saying they would never drive a toll road anyway. Here's the view south from the bridge with similar progress seen in places to the north--
As with the rest of the TriEx, this part is ready for traffic. And has some already...
Heading north on a bathroom break (there was a port-a-potty just south of McCrimmon Parkway)?

Green Level West Interchange
I had not gotten this far south since last October. Needless to say, more changes to report. The work on the bridge has been completed, but most lanes are still blocked off by barrels. Approaching from the west--
Wonder what all is hiding behind the black wrap on the sign post? There will be five lanes on the bridge, the middle for turning. Each ramp has its own traffic signal.
The signals are turned on their side, I assume this will not be the configuration when the ramps open. Here's a narrow view looking south to make sure you can spot a NC 540 mile marker--
In an unremarkable coincidence, the number on the mile marker, 62, matches the future exit number for the Green Level West interchange. A wider view looking south--
In addition to lane markings, there are lights put up in the areas surrounding the interchange ramps. Speaking of, this is interesting--
Notice how much of a sharp turn is need for traffic leaving NC 540, and the 25 MPH recommended speed. Was it too expensive to place the on-ramp before the bridge? Can't say they're overspending on this design. Here's a wider view to the north looking back toward Green Hope School Rd and the USA Baseball complex on the left--
Fortunately, the northbound on-ramp only requires a standard left or right turn--
Though you may notice the signs indicating the roadway rapidly goes from five lanes to two just beyond the bridge. Future congestion point?

The US 64 Interchange
Since I last visited in October they completed the paving and most of the landscape work around the TriEx/US 64 and Kelly Road interchanges. Here's the view approaching US 64 on NC 540 from the Jencks Road bridge (it had been complete in August but lack of landscaping made it hard to stop for photos)--
A closeup of the future off-ramp helps reveal the exit numbers for the US 64 interchange, 59A/B--
Mile marker 60 can be seen on the right. Still need to post the toll rates. Here's the view looking back toward Green Level West--
Note the equipment needed for more landscaping work, but a complete Toll North NC 540 sign assembly on the right. The scene approaching the interchange on US 64 West looks like this--
Again the overhead signs are up, but covered, unlike other exits on US 64 west of Raleigh, these (for the TriEx and Kelly Road) have no exit numbers. A closeup of the 'fancy' TriEx bridge over US 64--
The bridge to carry Kelly Road over US 64 is not complete, here's a view of the current construction looking north--

Apex Barbecue Road
I managed to get down to view construction progress of the next section (US 64 to NC 55 in Holly Springs) at Apex Barbecue Road. A new bridge has recently been opened. You can tell in this view north of the bridge where they were able to grade the TriEx roadbed before the bridge was completed--
This is one of the few places where they are constructing noise barriers. This is Apex, not Cary. A view to the south--
Again, you can see where they only recently began to grade the roadbed after the bridge was open. The next exit south is for Old US 1, but the road is still closed, and I didn't feel like walking a long way in the heat. The final shot then was of the new Apex Barbecue Rd bridge and new traffic signals at the Kelly/Apex Barbecue intersection--
Hopefully, aided by the open TriEx north of US 64, I will be able to get to places further south toward Holly Springs in early August.

Comments

Popular posts from this blog

California State Route 152

Circumstance had me out in the Monterey Peninsula again this week.  Generally I try to take a route like California State Route 198 or ever County Route J1 to get across the Diablo Range but time had me in a slight bind.  That being the case I took the popular way across the Diablos on California State Route 152 via Pacheco Pass.  152 is one of infamy given it is really the primary route for truckers to get from I-5 west in San Joaquin Valley to US 101 in Salinas Valley.  After zig-zagging some accidents on/off California State Route 99 near Madera in the rural outskirts of the County bearing the same name I began my westbound trek on 152.




CA 152 is called the William Whitehurst Highway, at least it is west from CA 99.  The entire route of CA 152 in San Joaquin is an expressway aside from a small portion in the city of Los Banos.



The first junction on CA 152 is with CA 233 which is a small 4 mile highway that travels northeast to CA 99.






Next westbound CA 152 encounters the junction w…

The National Road - Ohio - Muskingum and Licking Counties

As it travels from Zanesville towards Columbus, US 40 goes through numerous small towns, changes from two to four lanes and back numerous times, but most importantly the old road keeps its rural charm.  Between Zanesville and Gratiot, there are four former alignments of the old road that can be found: just west of Zanesville, Mt. Sterling, Hopewell and Gratiot.  Most stretches are very short and can be easily recognized with names as "Old US 40", "Old National Road" or some combination of the two.

Zanesville:
Just west of US 40's interchange with Interstate 70 (Exit 152) runs an old alignment.

Mt. Sterling:
Another old alignment goes through this small Muskingum County village.
Hopewell:
Today, US 40 passes south of the community of Hopewell.  The old two lane road is known as Hopewell National Road.
Gratiot:
Old US 40 is known as Main Street in this tiny village of 200 or so residents.  The old highway at times seems forgotten through here.
Just west of Gratiot, US 40 …

Throwback Thursday - October 12, 2017

In this week's edition of Throwback Thursday, we travel back to December 2003 to the southern end of Interstate 99 in Bedford, Pennsylvania, where we can see button copy guide signage for US 30 and US 220 (US 220 runs concurrent with I-99 through this part of the Keystone State). Since I-99 was relatively new at the time, it feels like it was an afterthought.