On September 12, 2015 MassDOT posted an advertisement calling for bids on a contract (Project No. 608024) that will convert the state's interstates an other US and State Route expressways to the Geographic Reference Location or Milepost Exit Numbering System starting in 2016. The winning bidder is to be chosen on November 17, 2015. This ends a process started with the 2009 Massachusetts Supplement to the federal MUTCD, section 2E.31 stating: "Massachusetts will be changing all its interchange exit signs statewide to the reference location numbering system, with the entire state highway system to be converted to the new numbers over the next five to ten years." According to a MassDOT source, a chief sign engineer, however, when the state approached the FHWA about funding an ongoing conversion project, they insisted the only way Massachusetts could get 90% federal funding was if they did the project all at once, in what is termed a blanket contract. According to the same source, the project will start in the western part of the state and move east. Short routes like I-84 and I-385 probably being the first to receive the new numbers.

 

When MassDOT committed to the blanket contract for changing the numbers all at once, they already had two projects in the works to update the signage along I-90, the Massachusetts Turnpike, from the NY border to Exit 20 in Allston/Brighton. They decided to change the numbers along I-90 under these two contracts instead. The first project, that will change the numbers from the border east to I-290/I-395 in Auburn was let on August 18. The eastern project is to be advertised on October 31 and will probably be let in December (the remaining signs east of Allston-Brighton date from the extension of I-90 to East Boston in the 1990s and the numbers will be changed under the blanket contract).

 

I was able to get a copy of the signage plans for the western part of I-90 with the new exit numbers. Heading west to east, the first (currently 1) will become 3:


And the final exit under the contract, now 10, will become 90:

 
The most frequently jammed exit, at least westbound, at Sturbridge, now 9, will become 78:

This exit will be the only one to feature diagrammatic signing heading westbound:


US 20, that was formerly on the Exit 9 signage, will be relegated to a ground-level auxiliary sign:

All the I-90 signs on the Turnpike and Ramp will also feature the Mass Pike Logo:


And a Toll Banner at Turnpike Entrances:

For a complete listing of the new exit numbers for the Mass Pike, go to the Future I-90 Mass Pike Exit List. To see more signing plans, go to the I-90 Sign Plans Gallery.

With Massachusetts converting to milepost based numbering, and Connecticut starting to convert with a project currently going on along I-395 (for a gallery of the new signs already put up, visit this Flickr Site). This only leaves three New England states (NH, RI and VT) plus New York (and Interstates in Delaware) as the only remaining consecutive exit number states. With federal mandates calling for a switch, it probably will only be a short time before these states change as well.

In addition to my I-90 list, feel free also to check out my lists covering probable future exit numbers for all of Massachusetts's Interstates and State Route Expressways.

Comments

Bob Malme said…
Update:
On November 28, MassDOT placed an advertisement for bidders for the next Mass Pike signing project from Millbury to Boston (Current Exits 10A to 20). The winning bidder is to be announced on February 2, 2016. Work is to start later in the spring.
Bob Malme said…
An update to the I-90 signs gallery link. The gallery has moved to its own site:
http://www.gribblenation.net/mass21/i90photos.html

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …