On September 12, 2015 MassDOT posted an advertisement calling for bids on a contract (Project No. 608024) that will convert the state's interstates an other US and State Route expressways to the Geographic Reference Location or Milepost Exit Numbering System starting in 2016. The winning bidder is to be chosen on November 17, 2015. This ends a process started with the 2009 Massachusetts Supplement to the federal MUTCD, section 2E.31 stating: "Massachusetts will be changing all its interchange exit signs statewide to the reference location numbering system, with the entire state highway system to be converted to the new numbers over the next five to ten years." According to a MassDOT source, a chief sign engineer, however, when the state approached the FHWA about funding an ongoing conversion project, they insisted the only way Massachusetts could get 90% federal funding was if they did the project all at once, in what is termed a blanket contract. According to the same source, the project will start in the western part of the state and move east. Short routes like I-84 and I-385 probably being the first to receive the new numbers.

 

When MassDOT committed to the blanket contract for changing the numbers all at once, they already had two projects in the works to update the signage along I-90, the Massachusetts Turnpike, from the NY border to Exit 20 in Allston/Brighton. They decided to change the numbers along I-90 under these two contracts instead. The first project, that will change the numbers from the border east to I-290/I-395 in Auburn was let on August 18. The eastern project is to be advertised on October 31 and will probably be let in December (the remaining signs east of Allston-Brighton date from the extension of I-90 to East Boston in the 1990s and the numbers will be changed under the blanket contract).

 

I was able to get a copy of the signage plans for the western part of I-90 with the new exit numbers. Heading west to east, the first (currently 1) will become 3:


And the final exit under the contract, now 10, will become 90:

 
The most frequently jammed exit, at least westbound, at Sturbridge, now 9, will become 78:

This exit will be the only one to feature diagrammatic signing heading westbound:


US 20, that was formerly on the Exit 9 signage, will be relegated to a ground-level auxiliary sign:

All the I-90 signs on the Turnpike and Ramp will also feature the Mass Pike Logo:


And a Toll Banner at Turnpike Entrances:

For a complete listing of the new exit numbers for the Mass Pike, go to the Future I-90 Mass Pike Exit List. To see more signing plans, go to the I-90 Sign Plans Gallery.

With Massachusetts converting to milepost based numbering, and Connecticut starting to convert with a project currently going on along I-395 (for a gallery of the new signs already put up, visit this Flickr Site). This only leaves three New England states (NH, RI and VT) plus New York (and Interstates in Delaware) as the only remaining consecutive exit number states. With federal mandates calling for a switch, it probably will only be a short time before these states change as well.

In addition to my I-90 list, feel free also to check out my lists covering probable future exit numbers for all of Massachusetts's Interstates and State Route Expressways.

Comments

Bob Malme said…
Update:
On November 28, MassDOT placed an advertisement for bidders for the next Mass Pike signing project from Millbury to Boston (Current Exits 10A to 20). The winning bidder is to be announced on February 2, 2016. Work is to start later in the spring.
Bob Malme said…
An update to the I-90 signs gallery link. The gallery has moved to its own site:
http://www.gribblenation.net/mass21/i90photos.html

Popular posts from this blog

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

The story of the Boy Scout Ramps on Interstate 79 North in NW Pennsylvania

If you are traveling on Interstate 79 North of Pittsburgh, you may notice the remnants of a set of off and on ramps at mile 100 just north of Exit 99 (US 422).  There's a story behind these ramps.  Forty years ago, these ramps were built specifically for two Boy Scout Jamboree's that were held at Moraine State Park - 1973 and 1977.  The ramps purpose were to provide access to the north shore of Lake Arthur where the bulk of the festivities and campsite for the Jamboree were located.  (Lawrence County Memories has a great write up and map of the festivities on its site.)

Not long after the Jamboree ended the ramps were abandoned.  There are still remnants of the Boy Scout Ramps today.



Above: Sattelite view of the Boy Scout Jamboree Ramps. 
Below: A view of the ramps from I-79 South.



The google street view image above gives a view along West Park Road of where the set of ramps intersected the highway.  The ramps provided direct access to North Shore Drive (which is the right tur…

The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby n…