On April 1, 1957, the 47 of the remaining 73 miles of the Pennsylvania Turnpike's Northeast Extension opened to traffic.  Included in the new highway was the 4,461 foot Lehigh Tunnel, a two lane tube through the Blue Mountain.  However by 1970, concerns over the levels of traffic through the 13 year old tunnel were growing.  Throughout the 1960's the Turnpike either twinned or bypassed the seven tunnels on the mainline system.  For over a decade, various proposals were introduced but tight economic times did not allow for proactive construction.  Finally, in 1985, Act 61 authorized new funding for the Pennsylvania Turnpike System.  The legislation approved funding for the twinning of the Lehigh Tunnels. Studies began almost immediately and construction began early in 1989.  Construction would last for nearly two and a half years, ending with the opening of the new facility on November 22, 1991.
 
Throughout the 32 months of construction, Bill Symons took photographs of the progress made.  He begins with an untouched south portal in 1989 to the tunnels a few weeks before opening in the fall of 1991. 

South Portal: 
Excavation work can be seen on this 1989 shot approaching the southern portal of the Lehigh Tunnel. (Bill Symons)
If you were heading northbound on PA 9 in 1989, you would not see much of any sign of construction work entering the tunnel.  This photo gives an excellent perspective of how the highway would narrow upon entering the tunnel. (Bill Symons)

Here is what the completed twin tubes look like nearly 20 years later.  (Doug Kerr, April 2007)

 North Portal:


Be sure to notice the change in the hillside from this photo in 1989 and the following two.  Excavation work has begun and the concrete superstructure is beginning to take form. (Bill Symons)

Substantial progress can be seen by the Autumn of 1990.  A wide double yellow line and guard rail is all that separates the opposite direction of traffic entering and exiting the tunnel. (Bill Symons)

The tunnel is near completion in this Fall 1991 photo.  The hillside has been landscaped and a cement slope and retaining wall has been built.  A temporary concrete barrier has also been placed to divide the then current north and southbound traffic.

Site Navigation:

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …