Allegheny River Boulevard - Pittsburgh's Blunder Boulevard

Authorized for construction as part of the 1928 Allegheny County Bond Issue, Allegheny River Boulevard runs from Washington Blvd. in the Highland Park neighborhood of the City of Pittsburgh to Hulton Road in the suburb of Oakmont.  When opened in 1934, the roadway was Pittsburgh's first link between the city and the suburbs to the north and east.  However, unlike her sister highways; Ohio River Boulevard to the west, Saw Mill Run Boulevard to the south, and Moss Side Boulevard on the eastern edge of the county, Allegheny River Boulevard would be the last to open after a nearly three-year struggle over what amounted to basically 1300 feet of highway.
 
The 1928 bond issue allocated over $3.5 million for the construction of the four-and-one-half-mile roadway from Washington Boulevard in Highland Park to Wildwood Avenue in Verona. (1)  The most challenging part for engineers was designing and constructing the roadway from Washington Boulevard to Nadine Road.  This section was known for its fast-rising slopes along the south shores of the Allegheny River.  Another obstacle was the railroad tracks owned by the Allegheny Valley Railroad and Pennsylvania Railroad.  The ultimate obstacle that would hold the highway in doubt for nearly three years was land owned by the Pennsylvania Water Commission in Nadine.

Forgotten by over 70 years of time is the roadway's original nickname, "Blunder" or "Bungle Boulevard."  The blunder, an oversight by Allegheny County Director of Public Works Norman F. Brown, was a dispute over the right-of-way between the Pennsylvania Water Commission and Allegheny County.  This would also include the Pennsylvania Railroad as they owned rail tracks the county wished to move. (2)  The cost of the mistake was one-half million dollars. (3)  Although the water commission and the county wished to come upon a settlement, by 1932 the entire highway was completed with the exception of the "bungled" area that would in the end only be 1,300 feet of roadway.

While many compromises were being discussed including a 1,700-foot link that included "a grade of less than 8 percent, in a sweeping curve with a 600-foot radius...the eastern end [would] descend to meet the present improved highway on a 4 percent grade.", a bridge would be built over Nadine Road and a "ramp at the eastern end leading down into the Nadine Road and the water company's plant." (4)  As various local and state politicians got involved, the "blunder" was an issue in the 1931 Allegheny County Commissioner Race in which Brown lost, other communities provided their own pressure to the design of the highway.  In 1933, Penn Township announced that the community would oppose any plan that would not give the township a highway outlet to the river.  (5)  Oakmont petitioned for a fast solution so area communities could reap the benefits of the new road. (6)

It wasn't until the Spring of 1933 when Pennsylvania Governor Pinchot signed a bill that "[gave] county commissioners authority to force settlement of the right-of-way problem by relocating the rights-of-way of public service companies." (7)  The bill was sponsored by Representative James H. McClure and paved the way to the ultimate completion of the highway.  Work was scheduled to begin immediately and by the Winter of 1934, the highway was opened.  An editorial in the February 1, 1934 Pittsburgh Post-Gazette read, "Now that the Nadine bottleneck in the Allegheny River Boulevard has been opened, an old reliable item will be missed by newspaper readers.  The story of the Nadine jam was a pretty expensive comic serial."

Allegheny River Boulevard entrance pylons in Verona. (Eric Lasher)
One of the key features of Allegheny River Boulevard was eight "observation turnouts" along the highway.  These parkway-like features included stone observation platforms that allowed for wide vistas of the Allegheny River.  In addition, two concrete pylons designed by Frank Vitter were placed at each end of the boulevard.  Currently, two pylons at the original northern terminus of Allegheny River Boulevard remain standing in Verona.

Today, safety and capacity concerns and improvements are the major issues of the highway.  Other issues include the deteriorating condition of the scenic pull-offs that were part of the original design and a redesign of the highway in Penn Hills.  During the mid-1990s, two groups, Preservation Pennsylvania and Scenic America deemed the highway at risk due to the deterioration of the turnouts and bridges, unchecked overgrowth, and commercial billboards.  Preservation Pennsylvania in 1995 suggested that the boulevard be added to the National Register of Historic Places.  In 2003,  the Pittsburgh non-profit organization, Friends of the Riverfront, suggested that Allegheny River Boulevard be considered for a Pennsylvania Scenic Byways designation that would help to preserve the scenic attributes of the roadway.  Currently, neither designation has occurred.  Later in 2008, the National Parks Service conducted a Historic American Landscapes Survey of Allegheny River Boulevard and the three pull-offs.

In 2007, the Town of Verona refurbished the two concrete pylons on Allegheny River Boulevard.  The refurbishment included fixing the illumination system inside the sculpture allowing the pylons to be lit for the first time in decades. (Eric Lasher)
For the 2007 US Open at Oakmont Country Club, the Town of Verona refurbished the Allegheny River Boulevard pylons.  The rehabilitation also included restoring the pylons' ability to light up at night.  This was the first time the pylons were illuminated in an unknown amount of time.  The restoration has been a source of civic pride and initiated hope that the entire boulevard and scenic observation points can be restored to their prior grandeur. 

The relit pylon from the outbound side. (Eric Lasher)
Site Navigation:
Sources & Links:
  • Eric Lasher
  • (1) "Task of Providing Modern Highway Along Steep Hill Is Difficult." Pittsburgh Press. August 29, 1929.
  • (2) "Brown Denies 'Blunder' Made In Boulevard." Pittsburgh Press. July 17, 1930.
  • (3) "Bungle To Cost Half Million." Pittsburgh Press. November 26, 1930.
  • (4) "Officials May Blast To Build Highway." Pittsburgh Press. August 19, 1932.
  • (5) "Still Further Delay Seen In Nadine Pass." Pittsburgh Post-Gazette. April 27, 1933.
  • (6) "Nadine Road Problems Up For Solution." Pittsburgh Post-Gazette. February 24, 1932.
  • (7) "Pinchot Signs Bill Erasing Nadine Error." Pittsburgh Press. April 11, 1933.
  •  

    Comments

    Popular posts from this blog

    Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

      There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

    Hernando de Soto Bridge (Memphis, TN)

    The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

    Memphis & Arkansas Bridge (Memphis, TN)

      Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third