Skip to main content

Florida State Road 50 Part 2; Sumter County

Picking up from Part 1 of the Florida State Road 50 series Part 2 covers the sections of the highway headed eastward within Sumter County.


Part 1 of the Florida State Road 50 series can be found below:

Florida State Road Part 1; history of the highway and Hernando County portion

As stated in Part 1 the route of FL 50 east enters the Green Swamp in eastern Hernando County.  At the Little Withlacoochee the route of FL 50 enters Sumter County.



At County Road 757 the route of FL 50 east meets it's original right of way which once continued west to Riverland Road in Hernando County.


Back in 2014 I spent time tracking down former alignments of what is now FL 50 on the north side of the Green Swamp in Hernando County and Sumter County.  As stated above the original right of way that likely was part of early FL 50 used was Riverland Road in Hernando County and County Road 757 in Sumter County to cross the Little Withlacoochee River.  The original right of way can be seen on the 1936 Hernando County and 1936 Sumter County Road Map from Part 1.

Heading westward from modern FL 50 towards the Little Withlacoochee reveals a narrow roadway with several abandoned homes.






County Road 757 ends at a gate just short of the Little Withlacoochee River and Hernando County Line.  The former community of Riverland and Richloam are to the west on Riverland Road on the Hernando County side.



Back tracking west to Hernando County briefly.  In Part 1 of the Florida State Road 50 series the original route right of way is shown on rhe 1936 Eastern Hernando County road map diverting from the modern highway at Clay Sink-Richloam Road.  From Clay Sink-Richloam Road the original highway entered the community of Richloam and turned eastward towards the Little Withlacoochee River to Riverland here on Riverland Road.  Below is the turn from Clay Sink-Richloam Road eastward on Riverland Road. 


Returning to modern FL 50 the highway next has a junction with CR 478A just east of County Road 757.


FL 50 east enters the community of Tarrytown where it has a junction with FL 471.  FL 471 is the primary north/south road through the Green Swamp.



Tarrytown was a lumber town that was along the Orange Belt Railway.  Although Tarrytown is still listed as an active community there isn't very much left that one would discern as "town like."  On the northeast corner FL 50 and FL 471 there is one older structure that was recently repainted.  The Orange Belt Railway used to cross through the sawmill located on the southwest side of FL 50 and FL 471.  The Orange Belt Railway operated during the late 1880s and early 1890s before being reorganized.  The Orange Belt Railway eventually was acquired by the Atlantic Coast Line Railroad in 1902.


FL 50 east of FL 471 to the Van Fleet Trail is signed as a "Florida Scenic Highway."


East of FL 471 the route of FL 50 has Groveland listed 13 miles away while Orlando is shown as 42 miles away.


FL 50 east quickly enters the community of Linden.


The original right of way diverted from modern FL 50 in Linden at County Road 772B.  The original highway crossed over to the south side of Atlantic Coast Line Railroad, the path of County Road 772B still bears marks from a former crossing.  To the left of the photo below the Atlantic Coast Line was located between County Road 772B and modern FL 50.  The original highway continued east on County Road 772B where it rejoined modern FL 50 in Mabel near the Van Fleet Trail.


Linden as a community is very old and dates back to the 1840s.





The Scenic portion of FL 50 east ends in Mabel at the Van Fleet Trail.  Oddly FL 50 doesn't directly connect to the Van Fleet Trail which can only be accessed via County Road 772B.  The Van Fleet Trail is a 29.2 paved trail through the Green Swamp which was built on the grade of the Florida Western and Northern corridor line of the Seaboard Air Line Railroad.




East of Mabel the route of FL 50 intersects CR 469 which accesses Center Hill.



East of CR 469 the route of FL 50 enters Lake County.


Part 3 of the Florida State Road 50 series features the highway in Lake County.

Florida State Road 50 Part 3; Lake County


Comments

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third