Skip to main content

Abandoned Pennsylvania Turnpike Tunnels in the early 1980s

During the Fall of 1981 and the Summer of 1982, Bill Symons explored the three former single tube tunnels of the Pennsylvania Turnpike System.  At that time, the tunnels - Laurel Hill, Ray's Hill, and Sideling Hill - had been abandoned for over 10 years.  Since then, these three once busy passageways have been explored by many Turnpike, road, adventure, and outdoor enthusiasts.  What is unique about these photos from 35 years ago is that many of the original artifacts (lettering and lane stripping) still existed at the entrances to the three tunnels.  With the widespread popularity of abandoned Turnpike exploration, these photos capture the exterior of the abandoned tunnels closer to their operable form than they are today.

I am pleased to share with you Bill's photos as part of the blog's Pennsylvania Turnpike Collection.  These photos show the abandoned tunnels and roadways of the PA Turnpike with 35 years less of decay and vandalism.  But at the same time, it is truly amazing that after nearly 50 years of quiet abandonment that these small forgotten ribbons of highway have kept a remarkable form that serves as a living history of the Pennsylvania Turnpike.

Laurel Hill Tunnel:
Bypassed in 1964, the Laurel Hill Tunnel, located in Westmoreland County, was the first tunnel to be bypassed on the turnpike system.  Of the three abandoned turnpike tunnels, the Laurel Hill Tunnel is the forgotten one.  Located in remote southeastern Westmoreland County, the tunnel stood proud among overgrowth and fill when Bill visited the location in the Fall of 1981 and in the Summer of 1982.

Laurel Hill's west portal in the fall of 1981.  Asphalt fill blocked the westbound lane and the entrance to the tunnel.  'Laurel Hill' still stands at the tunnel's entrance. (Bill Symons)

Entrance to the eastern portal of the Laurel Hill Tunnel, Summer 1982.  This is an excellent example of how narrow the roadway becomes upon entering the tunnel.  Also of note is the concrete retaining wall running to the entrance. (Bill Symons)
Ray's Hill Tunnel:
Ray's Hill Tunnel along with nearby Sideling Hill Tunnel was bypassed in 1968.  The turnpike opened 13 miles of new tunnel less roadway on October 30th of that year.  The tunnel's length was relatively short at 2,532 feet.  Because of its short length, Ray's Hill was the only tunnel built with one set of exhaust fans.  The eastern portal was erected of stone and concrete but minus the exhaust fans that existed on the western end. 

Looking west and exiting the tunnel, Fall 1981.  Thirteen years dormant, the abandoned roadway is cracked and full of overgrowth. (Bill Symons)

The narrowing lanes of the westbound Turnpike approaching the western portal of Ray's Hill Tunnel. (Bill Symons)

Entrance to the western portal of Ray's Hill Tunnel.  By 1999, the letters were gone. (Bill Symons)
Looking east from the eastern portal of Ray's Hill Tunnel.  Ray's Hill Tunnel was only 2,532 in length and the light at the end of this short tunnel can be seen. (Bill Symons)
A side perspective of the exhaust fan less eastern portal of the tunnel.  Some of the letters had fallen off their mounts. (Bill Symons)
The former PA Turnpike exiting the eastern portal of the tunnel as viewed from the top of Ray's Hill. (Bill Symons)

Sideling Hill Tunnel:
The Sideling Hill Tunnel is the longest of the three abandoned tunnels at 6,782 feet.  It was also bypassed in 1968. 

The very narrow entrance to the eastern Sideling Hill tunnel portal, Summer 1982. (Bill Symons)
Exiting east of the Sideling Hill Tunnel and curving towards a reunion with the modern-day Turnpike. (Bill Symons)

Site Navigation:

Comments

Popular posts from this blog

The Relief Route That Wasn't: The Never Built I-70 Bypass in the Mid-Mon Valley

In June 1963, a small blurb in the Pittsburgh Post-Gazette read that The Westmoreland Engineering Company was awarded a $24,060 bid to study the proposed construction of Interstate 70 in Westmoreland and Washington Counties.  The study was to see what the construction and right-of-way costs "...to modernize the existing highway to Interstate requirements within eight months." (1)  This small, non-attributed, three paragraph article came less than a decade after the completion of a four lane highway that linked the Mid-Mon Valley to the Pennsylvania Turnpike. This would be the start of a 15 year process to upgrade and improve Interstate 70 - a process that ultimately never produced a single foot of new highway.

This is the story, albeit brief, of the I-70 that never came about.

Background:
What is now known as Interstate70 from Washington to New Stanton began as a connecting highway for the region to the Pennsylvania Turnpike.  Known as the "Express Highway", construct…

A look at Pittsburgh's Saw Mill Run Boulevard

Saw Mill Run Boulevard - Pennsylvania State Route 51 - runs through the narrow Saw Mill Run Valley.  It begins at the intersection of Clairton Road and Provost Road at the City of Pittsburgh Line with Brentwood.  It ends at the West End Circle at the entrance to the West End Bridge.  A four lane highway for its the entire length, Saw Mill Run Boulevard consists of interchanges at the South Portal of the Liberty Tubes and with the Parkway West.  It is an expressway from the Parkway to the West End Circle (West End Bypass).  One of the most well known traffic tie-ups in the Pittsburgh area occurs between Maytide Street and PA 88 (Library Road) which is simply known as 'Maytide and 88.'

History:
Saw Mill Run Boulevard was part of the 1928 Allegheny County 'City Beautiful' bond issue.  The bonds resulted in the creation of Saw Mill Run, Ohio River, Allegheny River and Mosside Boulevards. (1)   After the completion of the Liberty Tunnels in 1924, Downtown Pittsburgh was offic…

The Many Failed Plans of Pittsburgh's Wabash Bridge and Tunnel

The December 27, 2004 opening of the Wabash Tunnel ended over 70 years of proposals and speculation for the use of the over 100 year old facility.  The tunnel, which is now a reversible roadway that is an alternative route for rush hour traffic, saw many failed plans during the 20th Century.  These plans included options for mass transit, converted and new bridges for vehicles, and other forms of transportation.

Brief History:
Constructed in 1902-04, the Wabash Bridge and Tunnel was planned and financed by rail mogul, Jay Gould.  Gould began his "Battle of the Wabash" with the established railroads of the city in 1890.  He would finally emerge victorious, but during that struggle, Gould would see many setbacks that would eventually result in the railroad's bankruptcy in 1908.  On October 19, 1903, when the two ends of the bridge were to be joined together over the Monongahela River, the 109' bridge collapsed; killing ten men.  Construction would resume four days later …