Lehigh Tunnels Twin Tubing 1989-1991

On April 1, 1957, the 47 of the remaining 73 miles of the Pennsylvania Turnpike's Northeast Extension opened to traffic.  Included in the new highway was the 4,461 foot Lehigh Tunnel, a two lane tube through the Blue Mountain.  However by 1970, concerns over the levels of traffic through the 13 year old tunnel were growing.  Throughout the 1960's the Turnpike either twinned or bypassed the seven tunnels on the mainline system.  For over a decade, various proposals were introduced but tight economic times did not allow for proactive construction.  Finally, in 1985, Act 61 authorized new funding for the Pennsylvania Turnpike System.  The legislation approved funding for the twinning of the Lehigh Tunnels. Studies began almost immediately and construction began early in 1989.  Construction would last for nearly two and a half years, ending with the opening of the new facility on November 22, 1991.
 
Throughout the 32 months of construction, Bill Symons took photographs of the progress made.  He begins with an untouched south portal in 1989 to the tunnels a few weeks before opening in the fall of 1991. 

South Portal: 
Excavation work can be seen on this 1989 shot approaching the southern portal of the Lehigh Tunnel. (Bill Symons)
If you were heading northbound on PA 9 in 1989, you would not see much of any sign of construction work entering the tunnel.  This photo gives an excellent perspective of how the highway would narrow upon entering the tunnel. (Bill Symons)

Here is what the completed twin tubes look like nearly 20 years later.  (Doug Kerr, April 2007)

 North Portal:


Be sure to notice the change in the hillside from this photo in 1989 and the following two.  Excavation work has begun and the concrete superstructure is beginning to take form. (Bill Symons)

Substantial progress can be seen by the Autumn of 1990.  A wide double yellow line and guard rail is all that separates the opposite direction of traffic entering and exiting the tunnel. (Bill Symons)

The tunnel is near completion in this Fall 1991 photo.  The hillside has been landscaped and a cement slope and retaining wall has been built.  A temporary concrete barrier has also been placed to divide the then current north and southbound traffic.

Site Navigation:

Comments

Popular posts from this blog

Check the box: Interstate 495 to 87 conversion administratively approved

The American Association of State Highway and Transportation Officials have recently approved North Carolina's application to remove the short-lived Interstate 495 and future I-495 from Raleigh to Rocky Mount.  This administrative move most likely will result in North Carolina signing Interstate 87 and Future I-87 on the entire corridor in the near future.

Approved in 2013, Interstate 495 was first signed in 2014 along US 64 from Interstate 440 in Raleigh to Interstate 540 in Knightdale.  The remaining segment of highway to Rocky Mount was signed as Future Interstate 495.  However, in 2016, North Carolina's congressional legislators were able to get language in the 2015 FAST ACT designating the US 64/US 13/US 17 corridor from Raleigh to Norfolk as an Interstate.  In 2016, the FHWA and AASHTO designated this entire corridor (including the existing Interstate and Future 495) as Interstate 87.  (NCDOT had applied for Interstate 89 along this route.)

It is currently unknown when t…

The story on how the unbuilt US 40 Expressway in Brownsville took 40 years to complete.

For nearly four decades, the four lane US 40 just east of Brownsville came to an abrupt end - shown in the photo above - at Grindstone Road in Redstone Township.   In the late 1960s, what was then the Pennsylvania Division of Highways (PennDOH) extended a new four lane alignment of US 40 eastwards from Broadway Street slightly over one mile to Grindstone Road where an incomplete diamond interchange was built.  Earlier in the decade, PennDOH had built a four lane US 40 in Washington County into Brownsville complete with a new crossing over the Monongahela River known as the Lane Bane Bridge.  This new highway and bridge allowed US 40 to bypass the older Intercounty Bridge and downtown Brownsville. 

After this new highway opened, nothing would happen to it for nearly forty years.  US 40 traffic would use the ramps for this planned diamond interchange and then jog on Grindstone Road briefly before continuing towards Uniontown on the original National Road. 
What is unknown (at least to…

A quick Illinois and Wisconsin Road Trip

Recently, I was in the Chicago area and was able to explore the area north of Chicago and Wisconsin in my downtime.  I pretty much did a loop that consisted of Interstate 94, Interstate 43, US 12, Illinois Route 120, and Illinois Route 60.  It was my first real time exploring the area.  I ended up gaining an additional five counties on the trip bringing my total to just short of 1100, 1099 to be exact.

For the entire flickr set of photos for this trip, please head here.

Just prior to entering Wisconsin on Interstate 94, you will come across this sign.  Out of nowhere, Interstate 41 appears.  And if you aren't hip to changes on your map, Interstate 41 is a rather recently new interstate that runs from Green Bay to just about a mile inside the Illinois border.  Interstate 41 is an upgraded routing of the US 41 freeway that runs from Milwaukee to Green Bay; however, it was added along Interstate's 894 and 94 South of Milwaukee to where US 41 leaves I-94.  In fact, throughout the…