On April 1, 1957, the 47 of the remaining 73 miles of the Pennsylvania Turnpike's Northeast Extension opened to traffic.  Included in the new highway was the 4,461 foot Lehigh Tunnel, a two lane tube through the Blue Mountain.  However by 1970, concerns over the levels of traffic through the 13 year old tunnel were growing.  Throughout the 1960's the Turnpike either twinned or bypassed the seven tunnels on the mainline system.  For over a decade, various proposals were introduced but tight economic times did not allow for proactive construction.  Finally, in 1985, Act 61 authorized new funding for the Pennsylvania Turnpike System.  The legislation approved funding for the twinning of the Lehigh Tunnels. Studies began almost immediately and construction began early in 1989.  Construction would last for nearly two and a half years, ending with the opening of the new facility on November 22, 1991.
 
Throughout the 32 months of construction, Bill Symons took photographs of the progress made.  He begins with an untouched south portal in 1989 to the tunnels a few weeks before opening in the fall of 1991. 

South Portal: 
Excavation work can be seen on this 1989 shot approaching the southern portal of the Lehigh Tunnel. (Bill Symons)
If you were heading northbound on PA 9 in 1989, you would not see much of any sign of construction work entering the tunnel.  This photo gives an excellent perspective of how the highway would narrow upon entering the tunnel. (Bill Symons)

Here is what the completed twin tubes look like nearly 20 years later.  (Doug Kerr, April 2007)

 North Portal:


Be sure to notice the change in the hillside from this photo in 1989 and the following two.  Excavation work has begun and the concrete superstructure is beginning to take form. (Bill Symons)

Substantial progress can be seen by the Autumn of 1990.  A wide double yellow line and guard rail is all that separates the opposite direction of traffic entering and exiting the tunnel. (Bill Symons)

The tunnel is near completion in this Fall 1991 photo.  The hillside has been landscaped and a cement slope and retaining wall has been built.  A temporary concrete barrier has also been placed to divide the then current north and southbound traffic.

Site Navigation:

Comments

Popular posts from this blog

The Abandoned New Stanton Interchange Ramps

For nearly 50 years, the Pennsylvania Turnpike interchange with Interstate 70 and US 119 in New Stanton has been a rather free-flowing double trumpet, grade separated interchange between the two freeways.  But for the first 23 years of the turnpike, this interchange was vastly different.  It was the only non-trumpet interchange within the system (excluding termini points) and featured very tricky and gridlock causing left turns within the interchange.  (See image on right).  With the birth of the Interstate Highway System in the mid-1950s, new freeways were built and in many cases the Turnpike kept the original interchange using local roads to connect to the new freeways.  Interchanges with what would become I-81, I-176, I-80, I-70 in Breezewood, and I-79 were left with the original design.

Meanwhile in the 1950's, the state began building a freeway that ran from New Stanton west towards Washington.  This freeway, signed PA 71, was built to connect those in the industrial Mon Valle…

Quemahoning Tunnel

The Quemahoning Tunnel may have never been built by the Pennsylvanina Turnpike Commission, but it still has a history unto itself.  Originally planned to carry rail along the South Penn Railway, the tunnel never would not see any trains until 1909 when a small line named the Pittsburgh, Westmoreland & Somerset began utilizing it.  The use was brief and by the end of 1916 the PW&S was no longer in operation and abandoned the facility.  Twenty-some years later, the newly formed Pennsylvania Turnpike Commission considered using the abandoned tunnel, in fact it was shown on some original plans.  However, the PTC decided against using it, and the tunnel remained empty.

The eastern portal of the Quemahoning Tunnel is easily accessible from the PA Turnpike.  The portal is located at mile 106.3 along the westbound roadway.  The tunnel is one of the many "What Could Have Been's?" of the Pennsylvania Turnpike.  Below, Bill Symons shares photos taken in late Fall of 1986 of …

Conflict in the Mountains: The Story of Corridor H in West Virginia

Corridor H (US 48) was legislatively created as part of the 1965 Appalachian Regional Development Act.  This route which was designated to run east from Weston via Elkins to Strasburg, Virginia has been West Virginia's most controversial route of the six Appalachian Highway Development System routes that run within the state's borders.  The emotional conflict that has led to numerous legal and political struggles has placed the environment, desire for economic and social progress, and the Eastern West Virginia way of life at odds with each other for nearly four decades.

Early History:
The story of Corridor H begins in the 1930s.  Benton McKay, who orchestrated the creation of the Appalachian Trail, suggested a network of highways and parkways throughout Appalachia. (1)  That proposal would become a key part of the 1965 Appalachian Regional Development Act.  The Act included the creation of the Appalachian Development Highway System (AHDS).  The highway system consisted of "…